深夜福利✅_久久久夜间小视频-艺文笔记

王金豹 2026年02月08日 07:10:33
发布于:曼谷

深夜福利✅_久久久夜间小视频_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific blanking plugs  No specific circuit breaker(s) safety clip(s)  No specific platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action  52-41-00-010-001 Open the APU Doors for Access  49-51-13-991-001 Fig. 401

 3. Job Set-up __________ Subtask 49-51-13-860-050  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network (Ref. TASK 24-41-00-861-002).

 (2)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)  Put the warning notices on panel 25VU to tell persons not to start the APU.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-51-13-865-050  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-51-13-010-050  C. Get Access  (1)  Put the platform below the APU access doors.

 (2)  Open the APU access doors 315AL, 316AR and safety them in the open position (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________  (Ref. Fig. 401/TASK 49-51-13-991-001) Subtask 49-51-13-020-050  A. Removal of the Pneumatic Sensor Assy  (1)  Disconnection of the electrical connectors (15) and (17).

 (a)  Disconnect the electrical connectors (15) and (17) from the total pressure transducer and differential pressure transducer.

 (b)  Put blanking caps on the disconnected electrical connectors.

 (2)  Disconnect the tube (13) from the static sensor assy (11).

 (a)  Remove and discard the lockwire from the bolt (3).

 (b)  Remove the bolt (3), the washer (2) and the retainer (1) from the static sensor assy (11).

 (c)  Move the hose (13) away from the static sensor assy (11).

 (d)  Remove and discard the packing (12).

 (e)  Put blanking plugs on the disconnected hose end.

 (3)  Disconnect the pneumatic sensor assy (14) from the bleed duct

 (a)  Remove the bolt (4) from the bracket assy (9).

 (b)  Remove the bolts (6) NOTE : After the removel of the bolts (6) the flow sensor (7) is

____ only kept in position through the tubes (5) and (8).

 (c)  Remove the bolt (10) connecting the bracket assy (9) to the bleed duct.

 NOTE : Prevent a uncontrolled movement of the pneumatic sensor ____ assy (14) after the removal of the bolt (10).  (4)  Remove the pneumatic sensor assy (14).

 (5)  Remove and discard the gasket (16).

 Pneumatic Sensor Assy Figure 401/TASK 49-51-13-991-001  R  EFF :  001-003, 051-099, 401-499,  49-51-13 Page 404 Aug 01/05  CES 

 TASK 49-51-13-400-001  Installation of the Pneumatic Sensor Assy (GTCP 36-300)

 1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific  Torque Wrench : range 0.00 to 1.20 m.daN  (0.00 to 9.00 lbf.ft)  B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5

原标题:
67 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 女排土耳其杯4强出炉 半决赛瓦基弗伊萨豪门对决

      实际上,冠名商权益的问题是一个历史遗留问题,一个很重要的原因是,在俱乐部中性名的过程中,作为一项新生事物,相关规定不严谨。目前俱乐部名称是非常杂乱的:其一,存在双行政区划的情况,比如广西平果、上海嘉定,广西和上海是省市级行政区划,嘉定是地市级行政区划,平果是县市级行政区划;其二,存在中性名双词组情况,比如江西黑马青年,黑马和青年是双词组;其三,存在只有行政区划,没有中性名的情况。
  • 房价暴涨时应严厉打击囤地炒地

      为引导行业良性发展,为正确引导消费者选择,为加强行业市场教育,新浪家居联合金堂奖重磅推出「2022设计师严选品牌TOP10」活动,以行业创新发展为基础,以专业设计师角度为准则,以网络票选为形式,最终形成客观、真实的「2022设计师严选品牌TOP10」榜单。
  • 任泽平:财政政策应该积极有所作为

      立讯精密工业股份有限公司(以下简称“立讯精密”或“公司”)于2024年2月28日召开了第五届董事会第二十三次会议和第五届监事会第二十三次会议,审议通过了《关于2019年股票期权激励计划预留授予第四个行权期行权条件成就的议案》,公司2019年股票期权激励计划预留授予第四个行权期行权条件已满足,同意公司2019年股票期权激励计划预留授予已获授股票期权的214名激励对象在第四个行权期可自主行权共3,578,439份,行权价格为13.35元/股。
  • 网友造谣南京禄口机场遣返四川籍乘客被行政拘留

      窦泽成在波多黎各公开赛最后一轮打出66杆,攀升到并列32位,获得0.78405分,世界排名从275位上升到273位。
  • 捆绑手机钱包“0元购” 如此揽储谁买单

      但现在对孩子的心理健康干预,很多是到医院或心理诊所去治疗。而现有医院很多将心理健康问题放在了精神卫生的大序列里,这导致很多家长、孩子认为,治疗心理健康问题,是跟治精神病一样的,这给家长和孩子带来了心理恐惧,也给整个社会的心理健康教育和治疗带来了一些干扰。
  • 音集协回应版权代理商不满删歌:有授权就不用删

      值得一提的是,统计数据显示,iOS用户对折叠屏手机的兴趣比例达到58%,市场上关于苹果折叠屏规划和取消的传言也一直不断。
  • 消息称高瓴、博裕等公司有意投资万国数据的亚洲数据中心

      专家表示,美国激进推行“美国制造”,将使制造业成本大幅增加,不仅将使通胀高烧难退,还会损及经济效率。同时,美国升级保护主义,将持续损害与贸易伙伴关系,加剧美国在国际贸易领域“信誉降级”。
  • 潮州市城区36条道路完成路树迁移 将补植这些树种

      炒股就看金麒麟分析师研报,权威,专业,及时,全面,助您挖掘潜力主题机会!
  • Michael Kors 法国约66%的员工将被裁减

      此外,近期成长板块反弹,亦被机构解读为“先觉资金”入市、先手掌握“风格定价权”的北上资金对行情起到助推作用。
  • 盘和林:加快金融支持制造业步伐 稳定经济发展的基本盘

      从新房、存量房装修市场空间与潜力来看,中国家装市场相对稳定,开发潜力可持续且巨大。
  • 赵虎:数字时代的家居设计机遇,属于主动突破的设计师

      3月12日消息,人工智能初创企业OpenAI对亿万富翁埃隆·马斯克(ElonMusk)的指控做出了措辞严厉的反击,并在法庭文件中表明,马斯克的指控“建立在令人费解的、往往自相矛盾的事实基础之上”。
  • 问题探花秀2年合同签鹈鹕!内线四大天王凑齐了

      机构评级家数并列第二位的分别是、,均有18家。
  • 女排意大利杯4强赛揭幕 卫冕冠军科内3

      [卡丁车模式很辣颠簸又上瘾]
  • 这几种情况的女人容易宫外孕,多跟男人有关

      镜头显胖,而圆脸又恰恰是骨相、线条都不明显的类型,再加上我们亚洲人本身面部起伏小、面部折叠度低,好了上了镜可以说是非常2D,怎么p都没效果。
  • 【中粮视点】棕榈油:马来局2月报告

      76人成为8年来首支得分低于80分但最终取胜的球队,乌布雷全场19中6得到18分10篮板3助攻3抢断,希尔德16分7篮板3助攻,里德13分7篮板4盖帽,哈里斯11分12篮板。