国产自拍👅_厨房玩弄丰腴尤物美妇在线阅读-艺文笔记

王金豹 2026年02月07日 03:13:38
发布于:曼谷

国产自拍👅_厨房玩弄丰腴尤物美妇在线阅读_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

ENR 1.10 FLIGHT PLANNING 1. FLIGHT PLAN PREPARATION 1.1 Before beginning a flight, a pilot in command must study all available information appropriate to the intended operation and, in the cases of flights away from the vicinity of an aerodrome and all IFR flights, must make a careful study of: a. current weather reports and forecasts for the route to be flown and the aerodromes to be used; b. the airways facilities available on the route to be flown and the condition of those facilities; c. the condition of aerodromes to be used and their suitability for the aircraft to be used; d. the Air Traffic Control rules and procedures appertaining to the particular flight; and e. all Head Office and FIR NOTAM applicable to the en route phase of flight, and location-specific NOTAM for aerodromes. The pilot must then plan the flight in relation to the information obtained. Note: Full details on the services provided by the briefing office(s) are available in ERSA GEN. 1.2 Forecasts 1.2.1 A forecast must be either a flight forecast or an area forecast with an aerodrome forecast for the destination and, when required, the alternate aerodrome. For a flight to a destination for which a prescribed instrument approach procedure does not exist, the minimum requirement is an Area Forecast. 1.2.2 For flights for which a forecast is required and cannot be obtained, the flight is permitted to depart provided the pilot is satisfied that the weather at the departure point will permit the safe return of the flight within one hour of departure. The flight is permitted to continue provided a suitable forecast is obtained for the intended destination within 30 minutes after departure. 1.2.3 For flights to a destination for which a aerodrome forecast is required and cannot be obtained or is “provisional”, the flight is permitted to depart provided an alternate aerodrome meeting all the requirements specified in ENR 1.1 Section 72. is provided. GEN TOC ENR TOC AD TOC Index ENR (EN ROUTE) A/L 45 effective 24 NOV 05 1.2.4 CHTR, AWK and PVT operations under the VFR at night must not be conducted unless the forecast indicates that the flight can be conducted in VMC at not less than 1000FT above the highest obstacle within 10NM either side of track. 1.2.5 A pilot in command must ensure that the forecasts cover the period of the flight and that the aerodrome forecasts for the destination and alternate aerodromes, to be nominated in the flight plan, are valid for a period of not less than 30 minutes before and 60 minutes after the planned ETA. 1.2.6 When a flight is delayed so that the meteorological and operational information does not cover the period of flight, updates must be obtained as necessary, to allow the flight to be concluded safely. 1.2.7 A series of flights may be included on the one flight plan provided that: a. the meteorological forecast will cover all the flights; and b. relevant AIS information is available at flight planning. 1.2.8 When preflight briefing is obtained more than one hour prior to ETD, pilots should obtain an update before departure to ensure that the latest information available can be used for the flight. The update should be obtained by NAIPS pilot access, telephone, or, when this is impracticable, by radio. 1.3 GPS Prediction Analysis – Flight in Oceanic and Remote Areas 1.3.1 A requirement for flight in oceanic and remote areas using GPS is that an appropriate en route GPS prediction analysis be conducted prior to each flight. For details see ENR 2.2 Section 4. 1.4 Non-instrument Procedure Destination 1.4.1 A flight operating under the IFR by day may be planned to a noninstrument procedure destination provided that the aircraft can be navigated in accordance with ENR 1.1 Section 19.1. When the forecast for the destination is below the alternate minima specified in ENR 1.1 sub-para 72.2.12c., the pilot in command must ensure that a suitable alternate has been nominated. 1.4.2 An aircraft operating under the IFR by night having a MTOW not greater than 5,700KG may be planned to a destination not served by a radio navigation aid, or not having an approved instrument approach procedure, subject to the following requirements: GEN TOC ENR TOC AD TOC Index ENR (EN ROUTE) A/L 45 effective 24 NOV 05 a. Sufficient fuel must be carried to permit flight to an alternate aerodrome meeting all the requirements specified in ENR 1.1 Section 72. b. The aircraft must be able to be navigated to the destination and then, if necessary, to the alternate aerodrome in accordance   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:澳大利亚AIP上

原标题:
68 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 境内外机构加持 宁德时代大涨带动人气

      “2024年的权益资产配置价值是凸显的,这是因为国内资产价格在二级市场表现处于历史低位,并且与全球大类资产价格相比,也极具性价比,另外,全球加息周期已进入尾声,下半年美联储大概率率先降息,国际市场流动性将趋于宽松,今年的权益资产市场表现将优于2023年。”王兆江表示,下一步险资权益配置比重大概率会提升,企业上看,投向将包含央企、地方国企控制的优质资源、优质企业,还包括产业升级方向,比如具有新质生产力的企业;行业上看,将包括有色、能源、金融、地产、非银、保险、交运、物流、公用事业等。
  • 乙二醇期货:助力聚酯企业避险增收

      就像这种非常简单的配色与剪裁,其实作为春夏造型,是非常百搭不会出错的单品,各位可以好好选择一番,毕竟百搭,才是大多数人追求的理想单品~
  • 阿根廷玉米结转库存庞大 四万多辆卡车装运玉米到出口码头

      能看到免费的盗播,对于张志磊为代表的中国拳击手、中国体育市场、以及中国拳迷——是幸运、还是不幸?
  • 美联储6月加息门槛可能很高

      亿资石油:前海油连阳后面临调整谨慎关注上升趋势线支撑19:21欧元区和美
  • 2023卓越设计青年丨周家飞:以灵感赋能设计 营造科技智能化居家生活

      去年秋天,肯德尔委托以组织变革为专长的防务承包商麦肯锡公司,牵头研究空军在大国竞争中应该采取哪些变革步骤。
  • AMD再创历史新高

      在平台级AI和跨设备链接,以及端侧AI重构操作系统之外,AI也在对硬件创新不断提出着更高的要求。显而易见,AI的算力与芯片的处理能力密不可分,此外还对能源、屏幕等技术不断提出新的需求。
  • 迪士尼的 “上新”经济学

      像牛睿杰一样,热爱并致力于在基础研究领域探索、学习、创新的青少年还有很多。如何打通他们的成才之路?高校特别是“双一流”高校在基础研究人才培养中起着主力军作用,而在教育“双减”中做好科学教育加法,则事关青少年好奇心、想象力、探求欲的激发。源源不断地造就规模宏大的基础研究后备力量,应该在哪些方面持续发力?记者采访了相关部门和高校。
  • 今年A股最大特征:震荡市、大切换

      这套小说由著名儿童文学理论家汤锐女士翻译,在作者清浅简洁的文字风格之上,更融入了中文优美的韵律。方卫平教授评价这套书的译文“融合了理论家的精准和艺术家的优雅”。汤锐女士于2022年8月因病去世,令儿童文学界和她的读者深感痛惜,翻译这套作品也成了她生前为孩子们做的最后一项专业工作。她将对儿童文学的毕生热爱温柔地织进字里行间,留给读者永恒的感动。
  • 高管频繁出走,供应商讨不到钱,李学林的和府捞面迎来“至暗时刻”?

      总体来看,中性名政策和冠名政策需要进一步完善,中国足协和中足联筹备组有必要和各方协商出台更加明确的规定:其一,必须使用单一的行政区划;其二,必须使用单一词组的中性名,不超过3个字;其三,必须使用单一词组的冠名,不超过3个字或相关规定的字符。在上述基础上,再来协商转播角标的问题,争取在限制字符的情况下尽可能维护冠名商权益,这是一个与时俱进但也需要充分沟通的过程。关键词:加载中点击加载更多
  • IPO现场检查通关率仅15% 发行上市制度有望进一步调整完善

      从产业的角度来看,百川盈孚3月9日表示,终端整车厂降价促销拉动需求,头部电芯厂起量较为明显,开工率上升,整体装置负荷升到五成左右,中小厂也陆续恢复生产;车厂持续降价,为保证利润空间,车企或将继续向上游压价,降本压力逐级传递。但预计短期内锂电池价格还将保持稳定。
  • 韩国在增速换挡期面临的挑战、应对与启示(上)

      4、会议联系电话(传真):(023)
  • 4岁孩子写字会不会太早?

      有不少投资人注意到,1月26日前后,药明康德的转融通券一度暴增。
  • 6岁多的孩子体检需要检查哪些呢?

      (3)家装供应链的定位:家装供应链建设是家装产品建设的重要组成部分,但不是唯一的组成部分,也不是家装的核心竞争力。目前家装行业的竞争很大程度上陷入了供应链恶性竞争的窠臼。相当一部分装企、企业家的精力主要放在与供应链厂商的价格(利益)博弈上,装企的投入也更多的导向供应链在家装产品中的价值体现。但正如走访调研中看到的,即使装企在某一品类、某一品牌上获得了更多的议价空间,但在市场端,在消费者端,仅就供应链而言,你有大家基本也有,差别就是你的整套价格会有些许优势,但是,就如市场上出现5XX、6XX每平米的整装产品一样,家装市场的竞争远没有到良性竞争的程度,价格是最容易被操作的双刃剑。