国产自拍👅_导航地图最新版本-艺文笔记

王金豹 2026年02月08日 08:39:25
发布于:曼谷

国产自拍👅_导航地图最新版本_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific blanking plugs  No specific circuit breaker(s) safety clip(s)  No specific platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action  52-41-00-010-001 Open the APU Doors for Access  49-51-13-991-001 Fig. 401

 3. Job Set-up __________ Subtask 49-51-13-860-050  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network (Ref. TASK 24-41-00-861-002).

 (2)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)  Put the warning notices on panel 25VU to tell persons not to start the APU.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-51-13-865-050  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-51-13-010-050  C. Get Access  (1)  Put the platform below the APU access doors.

 (2)  Open the APU access doors 315AL, 316AR and safety them in the open position (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________  (Ref. Fig. 401/TASK 49-51-13-991-001) Subtask 49-51-13-020-050  A. Removal of the Pneumatic Sensor Assy  (1)  Disconnection of the electrical connectors (15) and (17).

 (a)  Disconnect the electrical connectors (15) and (17) from the total pressure transducer and differential pressure transducer.

 (b)  Put blanking caps on the disconnected electrical connectors.

 (2)  Disconnect the tube (13) from the static sensor assy (11).

 (a)  Remove and discard the lockwire from the bolt (3).

 (b)  Remove the bolt (3), the washer (2) and the retainer (1) from the static sensor assy (11).

 (c)  Move the hose (13) away from the static sensor assy (11).

 (d)  Remove and discard the packing (12).

 (e)  Put blanking plugs on the disconnected hose end.

 (3)  Disconnect the pneumatic sensor assy (14) from the bleed duct

 (a)  Remove the bolt (4) from the bracket assy (9).

 (b)  Remove the bolts (6) NOTE : After the removel of the bolts (6) the flow sensor (7) is

____ only kept in position through the tubes (5) and (8).

 (c)  Remove the bolt (10) connecting the bracket assy (9) to the bleed duct.

 NOTE : Prevent a uncontrolled movement of the pneumatic sensor ____ assy (14) after the removal of the bolt (10).  (4)  Remove the pneumatic sensor assy (14).

 (5)  Remove and discard the gasket (16).

 Pneumatic Sensor Assy Figure 401/TASK 49-51-13-991-001  R  EFF :  001-003, 051-099, 401-499,  49-51-13 Page 404 Aug 01/05  CES 

 TASK 49-51-13-400-001  Installation of the Pneumatic Sensor Assy (GTCP 36-300)

 1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific  Torque Wrench : range 0.00 to 1.20 m.daN  (0.00 to 9.00 lbf.ft)  B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5

原标题:
61 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 范丞丞付费照片引争议 V+会员与乐华联合发声明

      其实,金河珍对亚洲地区的比赛并不陌生。在2011年之前,他曾九次参加亚巡赛,四次进入前五名,其中包括在2011年新加坡公开赛并列第三名,仅落后冠军费南德兹-卡斯丹诺(GonzaloFernandez-Castano)一杆。“很高兴能够重返亚巡赛,我曾在这里度过愉快时光,留下了美好记忆。”金河珍表示,“回到赛场是我的梦想,也是一个漫长的过程。我期待继续努力,在赛场有更强的竞争力。”
  • 采取一切措施坚决制止股市跌破底线

      库克主导的苹果造车,从一开始就在将特斯拉作为目标。那时,苹果就已经不再有乔布斯发布iPod、iPhone等产品时的意气风发了。
  • 2018年彩色金银狗纪念币价格(2018年11月09日)

      对此,有网友评论称,相比较于视频网站,充值会员的数十元或上百元的花费,零星购买资源“很划算”,但也有网友疑问:这样是否会侵犯一些视频网站的版权?售卖资源的背后,是否存在骗局或利益链?
  • 肖央直播回应《唐探3》延期:顺其自然等下一次

      责任编辑:于健SF069家居跟帖微信
  • 放松限贷无法扭转楼市下滑趋势

      以下让我们来看一下中国前十选手的世界排名升跌:
  • 新京报:少林举报门 让一切回归法律

      遭遇惨败的她回到家里,在穿衣镜前看着自己粗壮的大腿,欲哭无泪。于是,恶狠狠地开启了减肥计划,取消了晚餐和零食,又冒着小雨出门跑了俩小时。
  • 中国缴获响尾蛇导弹无法仿制 最终决定如今看很明智

      让游客尽可能地享受旅途,让造价成本看得见摸得着,才是邮轮娱乐化的核心工作。
  • 修行应一门深入还是多看经典

      3、选择自主行权模式对股票期权定价及会计核算的影响
  • 双眼皮贴贴久了,眼睛会单变双吗?

      北京时间3月12日,中国多位选手凭借国际赛事提升世界排名,包括窦泽成、吴阿顺、陈顾新等。
  • 瑞信危机引爆投资者恐慌,瑞信会成为下一个硅谷银行吗?

      就像这种非常简单的配色与剪裁,其实作为春夏造型,是非常百搭不会出错的单品,各位可以好好选择一番,毕竟百搭,才是大多数人追求的理想单品~
  • 中国联通发布通告 正式开始关闭2G网络

      强大的金融机构是金融强国实际功能的主要构成部分。金融强国通常拥有规模和质量处于全球前列的商业银行、投资银行、保险公司和信托公司的金融机构体系。第二次世界大战以来,美国的商业银行和投资银行长期处在全球的前列,日本的商业银行一度赶上后又掉队。直到今天,美欧日的金融机构依然处在全球重要地位,尤其是美国的金融机构总体上仍处在强势状态。经过加入世界贸易组织后大刀阔斧的改革,中国的银行业迅速崛起,截至2022年末,资产规模合计约45.9万亿美元,为美国银行业的1.95倍。但就总资产而言,中国金融体系大致相当于美国的70%左右。中国的银行业虽大,但在全球的影响力相对有限,因其业务国际化程度偏低,产品和服务的国际竞争力较弱。相比美国十分发达的资本市场和证券业,我国的证券业和投资银行发展相对滞后。据统计,美国拥有世界上规模最大的资本市场,股市总市值超过46万亿美元,占全球股市总市值的42.5%。而中国股市总市值仅占10.6%,为美国的1/4左右,且发展步线较慢。保险业和信托业发展状况与国际先进水平相比亦有不小的差距。可见,中国的金融机构除银行业外,既不大,也不强,离金融强国所需要的强大金融机构体系要求尚有不小的差距。未来,需按照市场化、法治化、国际化原则,健全具有高度适应性、竞争力、普惠型的现代金融机构体系。
  • 3月11日美股成交额前20:小摩称英伟达等科技股远未见顶

      据德邦证券分类,236家已披露2023年业绩预告的生物医药公司中,预告业绩中值增长的有131家,业绩预告中值下滑的有105家,细分板块中表现较为亮眼的是中药和医疗服务。
  • 44张图解读中国楼市风险

      现如今,汽车产业已经成为我国经济的重要支柱,所以国家层面针对汽车行业的指引政策频出,旨在进一步稳定和扩大汽车消费。
  • 网友造谣南京禄口机场遣返四川籍乘客被行政拘留

      迪卡米洛暖心小说系列(全六册)