在线看免费❗_tobu8游戏-艺文笔记

王金豹 2026年02月07日 00:59:45
发布于:曼谷

在线看免费❗_tobu8游戏_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 29-11-52-865-050  C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/FIRE VALVE/G/ENG1 1703GK C13 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34  **ON A/C 001-049, 051-061, 101-103, 201-203,  Subtask 29-11-52-010-050  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Open the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,  Subtask 29-11-52-010-050-A  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Remove the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 12 (SHEET 1)  1EFF :  ALL  1  29-11-52 Page 404  1  1  Feb 01/98  1  1  1CES  1

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 22 (SHEET 2)  1EFF :  ALL  1  29-11-52 Page 405  1  1  Feb 01/98  1  1  1CES  1

R **ON A/C ALL  4. Procedure _________  (Ref. Fig. 401/TASK 29-11-52-991-001)  Subtask 29-11-52-020-050  A. Removal of the Engine Fire Pump-Valve  (1)  Disconnect the cable connector (1) from the electrical connector (2).

 (2)  Put blanking caps on the disconnected electrical connectors.

 (3)  Hold the engine pump fire-valve (5) and disconnect the coupling-nuts

 (4)  Compress the compensated slide (4) to decrease its length. Remove the engine pump fire-valve (5).

 (5)  Put blanking plugs on the disconnected line ends.

 TASK 29-11-52-400-001  Installation of the Engine Pump Fire-Valve (1046GK)  WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING

_______  NOTICES ARE IN POSITION.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______  GEAR.

 1.  Reason for the Job

__________________  Self Explanatory

 2.  Job Set-up Information

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific safety barriers  No specific warning notice  No specific access platform 3 m (9 ft. 10 in.)

 B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- Material No. 11-026 GB DEF-STAN 68-148/1 R SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 C. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-720-001 Functional Check of Hydraulic Fire Shut-Off Valves 29-10-00-863-001 Pressurize the Green Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 71-00-00-710-001 Dry Motoring Check 29-11-52-991-001 Fig. 401  3. Job Set-up __________  Subtask 29-11-52-941-060

 A. Safety Precautions  WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______  (1)  You must obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002) when you do work on the hydraulic system.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3

原标题:
79 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 政府工作报告21处提及金融!“五篇大文章”首次写入,强调“增强资本市场内在稳定性”

      稳定通畅的供应链意味着更好的购物体验。北京大学经济学院教授、北京大学国民经济研究中心主任苏剑表示,保障供应链的稳定性和时效性成为助力消费回暖、保障民生、优化供给的重要因素,是促进“618”线上消费服务实体经济的重要途径,也是服务实体经济的重要手段。
  • 中美科技实力对比:关键领域视角

      风云T6的座舱采用横贯且平直的中控台线条,再配合贯穿式空调出风口,视觉层次感和视觉宽度都显著拉伸,内部几乎没有物理按键的设计也让车厢显得宽敞了不少,悬浮式大尺寸中控液晶屏以及全液晶仪表则重在提升了科技感。、大量的皮质以及软质塑料的使用让座舱有了更好的触感,纹路细节也挺高级,整个座舱的品质感还是比较出色的。
  • 人教Pad定价超4000元 官网已删除价格

      一周内三破纪录,并跻身全球市值第八大资产,比特币的价值也随着这一波涨势越来越被认可。在分析人士看来,比特币的价格短期内可能会经历剧烈波动,与此同时,理解比特币在数字资产中的地位,以及数字资产与数字经济关系的深层次逻辑,对于投资决策和市场分析都具有重要意义。
  • 盘点中国掌握的黑科技 下一代核潜艇呼之欲出

      2、项目实施主体:赛轮新加坡在印尼成立的全资子公司
  • 新格局下供应链票据发展的SWOT分析与对策思考

      好消息!卡普空合作狩猎游戏《怪物猎人:崛起》PC版今天又降价了!这是Steam国区《怪猎崛起》今年第2次降价,上一次是在今年6月,基础定价从396元变为298元。而这次是从298元降低为243元。虽然力度不如上次大,不过降价嘛总是好事。
  • 期指重回窄幅盘整格局

      这些经历让我在履职时感到更加有底气,也更加有责任感,同时也让我现在在提出建议时更加谨慎、更加有敬畏感。从我自己身上,我能够发自内心地体会到全过程人民民主所带来的生产力。这种能够去参与、去见证的感受,让我感到自豪和幸福。关键词:加载中点击加载更多
  • 首辆FF 91本周末正式交付!贾跃亭再成老赖 下周回国遥遥无期

      “高考是人生中比较重要的一场大考,学生们在高考前都会出现一些紧张的状态,焦虑、担心考不好、失眠、烦躁、脾气不好,这些都是过度紧张所造成的。有些学生还会产生放弃高考的念头。”朱冠章表示,学校老师此番为高三学生策划的活动,旨在为学生们释放压力,“希望孩子们能理解老师们的良苦用心”。
  • 2023年我国完成造林5997万亩

      3月9日晚,杭州市公安局上城分局发布警情通报:
  • 宋代振禅师《山居颂》

      一家国内著名券商的部门负责人肖先生告诉北青报记者,如果身边有熟悉的亲友老乡,刚好专业对口,符合公司的门槛要求,他自己及周围圈里的朋友一般都很愿意帮助推荐。毕竟公司需要人才,这些年轻人需要机会。大家也就帮着向人事部门或用人的业务部门转交简历,同时介绍一下自己了解的申请人的基本情况。如果申请人经过筛选考核通过选拔,那就最好不过了。
  • 专家科普手机等电子产品“护眼模式”能否保护视力:有用 但不多

      首先,3月9日,华润置地亦庄新城0503街区B19R1地块揭晓案名为“北京润府”,销售指导价为6.5万/平方米。该项目位于地铁17号线北神树站旁,占地面积达69914.097平方米,总建筑面积高达.05平方米,2.5的容积率+60米的控高,规划有19栋8至18层的住宅楼。乐居君假设以90㎡-140㎡的首置首改面积段来计算,预计项目可提供约1300套住宅。
  • 英国股市十年未涨直到她力挽狂澜

      荷兰国家银行数据科学家AlexdeVries在一篇论文中估计,到2027年,整个人工智能行业每年将消耗85至134太瓦时(1太瓦时=10亿千瓦时)的电力。“人工智能是非常耗能的。每一台人工智能服务器的耗电量已经相当于十几个英国家庭的总和。所以数字加起来真的很快。“
  • 兴业投资:欧洲政治风险笼罩欧镑落难创新低

      居室内,各种家具的高度、设计均适应长者生理特征,方便长者起坐、抓握、支撑、移动等。其中,茶几采用圆角设计、围边设计,既能减少棱角磕碰损伤、防止物品掉落,也能减少长者弯腰次数、方便长者生活。同时,床高按照老人的居住舒适度统一设计为56cm,床下设计有内凹防止磕碰。