天堂岛精品🔇_久久久久久久久69-艺文笔记

王金豹 2026年02月07日 02:32:08
发布于:曼谷

天堂岛精品🔇_久久久久久久久69_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 29-11-52-865-050  C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/FIRE VALVE/G/ENG1 1703GK C13 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34  **ON A/C 001-049, 051-061, 101-103, 201-203,  Subtask 29-11-52-010-050  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Open the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,  Subtask 29-11-52-010-050-A  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Remove the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 12 (SHEET 1)  1EFF :  ALL  1  29-11-52 Page 404  1  1  Feb 01/98  1  1  1CES  1

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 22 (SHEET 2)  1EFF :  ALL  1  29-11-52 Page 405  1  1  Feb 01/98  1  1  1CES  1

R **ON A/C ALL  4. Procedure _________  (Ref. Fig. 401/TASK 29-11-52-991-001)  Subtask 29-11-52-020-050  A. Removal of the Engine Fire Pump-Valve  (1)  Disconnect the cable connector (1) from the electrical connector (2).

 (2)  Put blanking caps on the disconnected electrical connectors.

 (3)  Hold the engine pump fire-valve (5) and disconnect the coupling-nuts

 (4)  Compress the compensated slide (4) to decrease its length. Remove the engine pump fire-valve (5).

 (5)  Put blanking plugs on the disconnected line ends.

 TASK 29-11-52-400-001  Installation of the Engine Pump Fire-Valve (1046GK)  WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING

_______  NOTICES ARE IN POSITION.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______  GEAR.

 1.  Reason for the Job

__________________  Self Explanatory

 2.  Job Set-up Information

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific safety barriers  No specific warning notice  No specific access platform 3 m (9 ft. 10 in.)

 B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- Material No. 11-026 GB DEF-STAN 68-148/1 R SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 C. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-720-001 Functional Check of Hydraulic Fire Shut-Off Valves 29-10-00-863-001 Pressurize the Green Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 71-00-00-710-001 Dry Motoring Check 29-11-52-991-001 Fig. 401  3. Job Set-up __________  Subtask 29-11-52-941-060

 A. Safety Precautions  WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______  (1)  You must obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002) when you do work on the hydraulic system.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3

原标题:
66 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 有多少孩子,毁于不愿分离的爱?

      主题乐园成投资重点
  • 广州楼市限价未松绑 有楼盘实施单合同吸引购房者

      “因此我们就灵活调整,以雪为契机,安排了一次写作任务,记录今天这场‘突如其来的雪假’。”建华实验学校学生成长中心主任周尔娟告诉记者。
  • 利物浦1

      首先要请出泰坦尼克号,它除了在影视上留下了浓墨重彩的一笔,还成了巨物对比中的常用标准单位。
  • 游戏工委:坚决抵制绕过监管机制,通过境外游戏平台向国内用户提供服务

      金融高水平开放是金融强国建设的必由之路。应稳步扩大金融领域制度型开放,提升跨境投融资便利化,吸引更多外资金融机构和长期资本来华展业兴业。具体可从六个方面发力:一是完善“准入前国民待遇+负面清单”的管理模式,形成系统性、制度性的开放局面,逐渐与国际规则相融合;从主动接轨国际规则走向积极参与国际规则的制定,稳步扩大规则、规制、管理、标准等制度型对外开放。二是优化营商环境,在扩大金融市场准入的基础上,尤其是要重视优化准入后的政策安排与便利。三是深化金融行业对外开放,持续扩大外资金融机构业务范围,支持外资金融机构在境内设立更多分支机构,不断创新产品与服务。四是提升金融管理能力,加快形成并完善“宏观审慎+微观监管”两位一体的金融管理体系。五是稳慎推进人民币资本项目可兑换和人民币国际化,保持人民币汇率基本稳定和国际收支总体顺差。六是加强国际金融中心建设。显著提升上海国际金融中心能级,更加巩固人民币金融资产配置和风险管理中心地位。中国香港则需要增强证券、债券、资产管理、离岸人民币业务枢纽等范畴的竞争力和吸引力,通过政策创新推动粤港澳大湾区城市的国际金融合作。
  • 法新社:萨拉所乘飞机残骸中发现一具遇难者遗体

      更能突出个人高级的质感,彰显出非凡的品位与审美。
  • 《自然》(20230810出版)一周论文导读

      其中,荣科科技于2023年12月5日在互动平台曾透露,公司子智维云是超聚变的金牌经销商,与超聚变为业务合作关系。去年10月,市场就传超聚变重组相关事宜,彼时股价异动的荣科科技发布公告明确称,关注到市场传闻有关公司的不实信息,称公司与“超聚变”有资产注入的预期,此信息与事实不符。当时,河南上市公司也于2023年10月5日在互动平台上称,超聚变借壳公司不属实。
  • 国防部:中方将参加“安全纽带

      钟睒睒曾经是娃哈哈海南、广西两省的总代,后来从娃哈哈体系出走后,在杭州创立了农夫山泉,依托差异化的产品定位一举走红,并逐步发展至今,成为了和娃哈哈分庭抗礼的饮料巨头。
  • 禅宗初祖达摩大师(图)

      吴阿顺并列位于29位,获得0.60837分,世界排名从480位上升到467位。
  • 这个大国,重磅宣布:T+0!其股市已连涨8年

      为更好地满足广大投资者的理财需求,根据景顺长城基金管理有限公司(以下简称“本公司”)与上海陆金所基金销售有限公司(以下简称“陆基金”)签署的委托销售协议,自2024年3月12日起新增委托陆基金销售景顺长城纳斯达克科技市值加权交易型开放式指数证券投资基金发起式联接基金(QDII),具体的业务流程、办理时间和办理方式以陆基金的规定为准。现将相关事项公告如下:
  • 双重上市、融资140亿港元,小鹏稳了吗?

      瑞风RF8智聆版涵盖燃油与PHEV插混四款车型,PHEV旗舰型价格为23.99万,PHEV尊贵型价格21.99万;,燃油旗舰型价格18.99万,燃油尊贵型价格16.99万,今年2月1日已经开始交付。相比现在动辄30,40万的新能源MPV,瑞风RF8价格显得很有诚意。
  • 埃隆·马斯克终于找到了能接替他睡在工厂里的CEO

      正如数字资产银行AnchorageDigital首席执行官兼联合创始人NathanMcCauley表示,“比特币的历史高点标志着加密货币的一个转折点。传统机构曾经‘袖手旁观’,今天,他们正作为牛市的主要在这里全力以赴”。