国内精品♨️_青年大最新答案第五期答案-艺文笔记

王金豹 2026年02月06日 01:26:00
发布于:曼谷

国内精品♨️_青年大最新答案第五期答案_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (Ref. Fig. 401/TASK 71-22-11-991-300) Subtask 71-22-11-020-051  A. Removal of the Aft Engine Mount. NOTE : Removal of the hardware that attach the aft engine mount to the ____  engine is the same at the three engine flanges.

 (1) Remove the retaining pin (5) from the bolt (15).

 (2) Remove the bolts (30), washers (35), (50). and nuts (55) that attach the retainers (60) and (70) to bracket (40).

 (3) Remove the retainers (60) and (70) from engine.

 (4) Remove the spanner nuts (65) and (75) from the bolt (10) and the pin (15).

 (5) Remove the bolt (10) from the pin (15).

 (6) Remove the pin (15), and the brackets (20) and (40) from the engine flange.

 (7) Disengage the link assemblies from the engine flanges and remove the engine mount (85) from the engine.

 (8) Remove the bushing (25), (45), and the shoulder bushing (80) from the engine flanges.

 Subtask 71-22-11-480-052  B. Installation of the AFT ENGINE MOUNT ANTI GOUGE SPLINTS.  (1) Put the top slint assemblies (larger) on the outside of the aft engine mount links.  NOTE : The end of the splint assembly marked TOP must touch the beam ____ assembly. The other end marked BOTTOM must touch the links.  (2) Put the bottom splint (smaller) on the inside of the aft engine mount links.  F 『 EEFF : ALL E Page 40271-22-11  E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 Aft Engine Mount  Figure 401/TASK 71-22-11-991-300

 F 『 EEFF : ALL E Page 40371-22-11  E E Feb 01/98 E E ECES E

 F  『  E  C F M  E  E  E  E  56-5B  E  E  E

 (3) Attach the SPLINT - ENGINE MOUNT AFT (RSE1224) to the engine mount two places with TY WRAP.  (a) Wind the TY WRAP around the splints and the aft mount where the splint touches the beam assembly.

 (b) Wind the TY WRAP around the splints and the aft mount where the splint touches the link.

 (c) Make sure that the TY WRAP is wound very tight and that the splints can not move.

 F 『 EEFF : ALL E Page 40471-22-11  E E Feb 01/98 E E ECES E

 F 『  E C F M E  E E  E 56-5B E  E E

 TASK 71-22-11-400-041  Installation of the Aft Engine Mount  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  ------------------------------------------------------------------------------- REFERENCE  QTY DESIGNATION  ------------------------------------------------------------------------------- No specific  Torque Wrench : range 8.00 to 75.00 lbf.ft  (1.00 to 10.00 m.daN)  No specific Torque Wrench : range 15.00 to 150.00 lbf.ft

 (2.00 to 20.00 m.daN) R No specific Torque Wrench : range 5.00 to 35.00 lbf.in R (0.05 to 0.40 m.daN)  RSE1098 1 WRENCH SET - AFT ENGINE MOUNT  RSE1224 2 SPLINT - ENGINE MOUNT AFT

 B. Consumable Materials  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- Material No. CP5063  *  Silicone Lubricant (Ref. 70-30-00)

 C. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 71-00-00-000-042 Removal of the Power Plant 71-00-00-400-042 Installation of the Power Plant 71-22-11-991-300 Fig. 401  F 『 EEFF : ALL E Page 40571-22-11  E E May 01/05 E E ECES E

 F  『  E  C F M  E  E  E

 3. Job Set-up __________  Subtask 71-22-11-860-050

 A. Make sure that the engine is removed (Ref. TASK 71-00-00-000-042)  Subtask 71-22-11-080-052

 B. Remove the SPLINT - ENGINE MOUNT AFT (RSE1224) from the aft engine mount.  4. Procedure _________  (Ref. Fig. 401/TASK 71-22-11-991-300)  Subtask 71-22-11-420-051

 A. Installation of the Aft Engine Mount. CAUTION : INSTALL THE BUSHING (80) WITH ITS SHOULDER AT THE INTERIOR OF _______  THE ENGINE RANGE.

 NOTE : Installation of the hardware that attach the aft engine mount to   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2

原标题:
93 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 11月5日 COMEX 12月期银未平仓合约减少4273手

      另据中国国防部消息,当地时间3月11日,中伊俄“安全纽带-2024”联合演习拉开帷幕。当日上午,中方参演舰艇抵达伊朗恰巴哈尔附近海域,与伊朗、俄罗斯海军参演舰艇完成兵力集结。
  • 双重上市、融资140亿港元,小鹏稳了吗?

      (小风)声明:新浪网独家稿件,未经授权禁止转载!
  • 董明珠:格力过去30年被空调绑架了 改革是革自己的命!

      (被审判脸肿,解释是因为那会儿刚拔完牙的关系。)
  • 任泽平:美联储加息,中国央行没必要跟进

      大足石刻景区面向全国游客开展北山石刻景区门票“买一送一”活动。“不久前,大足石刻数字博物馆上线试运行,成为展示世界文化遗产大足石刻艺术及石窟保护、研究、传承利用成果的全新平台。春节期间,不少游客来馆参与石刻寻龙活动,赢取文创好礼。”大足石刻研究院有关负责人说。
  • 开放的亚投行更具意义和魅力

      2017年,经营不善的盈德气体被PAG以6港元/股的价格收购,私有化成本在100亿元左右。其后PAG对盈德气体实施了一系列新举措从而扭转了经营上的颓势,又将宝钢气体并入盈德,更名为气体动力科技有限公司。去年杭州资本拟收购气体动力,若这笔交易能够达成,PAG的回报粗略估算约为300亿元。
  • 张涛:宏观政策面临商业银行净息差收窄的掣肘

      如今在中国,辅助驾驶已经成为了智能汽车的标配,以华为、小鹏为代表的企业已经把辅助驾驶车辆开到了城市的大街小巷。
  • 田洪良:主要货币短线操作指南

      有媒体人士认为,AI是新质生产力的一部分或者是一个代表。但赵明的定义,则是AI让荣耀的新质生产力注入了灵魂。
  • 徐翔即将出狱:人过中年,禁入股市,“私募一哥”能否从头再来?

      “‘618’将以集中消费的方式来激活短期消费市场。受疫情影响,当下更多消费者愿意囤货,过去的断舍离、极简轻奢生活等消费方式已经发生了改变,消费者如今更加务实,对生活必需品的集中采购需求越来越旺盛。而‘618’提供了这样一个机遇,让消费者以较低价格实现集中消费。相信今年的‘618’将比往年更热闹。”浙江大学国际联合商学院数字经济与金融创新研究中心联席主任、研究员盘和林说。
  • 首批中证A50交易型开放式指数基金今天上市

      今年的政府工作报告明确提出,“增强资本市场内在稳定性”。3月6日,证监会主席吴清在十四届全国人大二次会议经济主题记者会上阐述了“两强两严”的监管新理念。其中,“强”就是要强本强基。吴清表示,投资者是市场之本,上市公司是市场之基,投资者和上市公司都是资本市场发展的源头活水。必须真诚善待投资者,更好服务投资者,从法律上、制度上、监管执法和司法上进一步加强对投资者的保护,增强投资者对市场的信心和信任,吸引更多的投资者特别是中长期资金参与市场。
  • 中信建投:哪些热点有望继续上涨?

      从2023年年初起,药明康德就频遭股东减持套现。自2023年1月13日以来,药明康德已发布五次公告,宣布公司实控人的减持计划,截至10月已套现约100.07亿元。
  • “京东同款商品618跳涨1500”上热搜 网友:买的没有卖的精

      Choice数据显示,今年以来,截至3月11日,股票型、混合型新基金共计募集资金381.26亿元。其中,不少新基金成立不久就开始建仓。2月末成立的多只权益类新基金净值已经出现变化。
  • 今日份狗粮!昆凌七夕晒与周杰伦合照表白老公

      李亚鹏还在直播间苦苦打转不得其法的时候,汪小菲和张兰在2022年11月,靠着离婚往事中的“床垫梗和电费梗”以及之后的“卤蛋和绿茶梗”畅游在流量之中。已经深谙直播精髓的李国庆蹭了一波流量,说自己给张兰发消息,张兰回了;给汪小菲发消息安抚,没有回复。他还喊话汪小菲鼓励他,“有我难吗?张兰是企业没了,你是家没了。我一人顶上你们母子,企业没了家也没了,还绝处逢生”。