深夜福利✅_北条麻妃99精品久久朝桐光-艺文笔记

王金豹 2026年01月19日 05:35:26
发布于:曼谷

深夜福利✅_北条麻妃99精品久久朝桐光_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
48 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 国庆购买黄金珠宝首饰要注意什么

      首先是定位。作为将年轻女性消费者为主要辐射对象的品牌,它的价格对于初入社会或者仍在校园的女性用户来说并不便宜,尤其是当主打性价比的国货美妆崛起,年轻消费者选择太多了。然而,当它对标高端品牌时,贝玲妃又缺乏一定的品牌存在感。恰如网友所评论的,“年轻时买不起,有钱了又看不上”。
  • 插混车界全能手 试驾奇瑞风云T6

      北京时间3月11日,NBA常规赛,以下是两场比赛的综述。
  • 降准是政策的微调而非转向

      万亿级产业蓄势“起飞”
  • 5月15日长江有色现货市场行情

      据茉酸奶方面介绍,2023年底,公司对8个城市开展市场调研发现,许多消费者反映原500毫升杯型容量较大,存在喝不完的现象。同时由于公司产品采用酸奶基底,成本相对其他茶饮较高,因此咨询公司建议可以适当降低客单价来带动新客尝试。
  • 兴业投资:脱欧谈判仍存变数 英镑巨震后收跌

      “储户如何存款主要取决于个人投资目标、风险承受能力和资金规划。”田利辉表示,储户跨境存款需要注意汇率风险,防止汇率变动带来资金贬值;需要注意利率风险,美联储有可能推动未来市场出现利率下行走势;需要防范信用风险,应该对境外机构进行充分的信用评估;需要防范流动性风险,防止无法提前或临时支取困难;需要防范法律和监管风险,防止因违规操作而遭受损失或因发生纠纷面临跨境诉讼。
  • 原油在多空博弈中蓄力 近期油价或延续偏空震荡

      为了提高参股房地产项目公司征信,满足金融机构风控要求,履行股东义务,支持参股房地产项目公司持续健康发展,本次公司控股子公司包括但不限于重庆金科房地产开发有限公司(以下简称“重庆金科”)原则上根据合资合作协议的约定,按公司持股比例对参股房地产项目公司提供担保。如根据金融机构要求,公司控股子公司超过公司持股比例提供担保,为进一步防范担保风险,在提供担保后将要求其他股东或者参股房地产项目公司提供反担保。
  • 第五堂课 如何交易美股

      近来有不少足球明星进军电竞。比如Paquetá战队是由英超西汉姆联的卢卡斯·帕奎塔创立的,另外PassionUA是由阿森纳后卫津琴科创立的。
  • 网友喊话娃哈哈推出啤酒产品,娃哈哈客服回应

      天眼查显示,被曝光的代收代储企业阔海米业成立于2015年10月,法定代表人、董事长兼总经理为吴志华。股权全景穿透图显示,该公司由上海阔海投资有限公司全资子公司海伦阔海粮油有限公司及两名自然人共同持股。除阔海五常米业外,吴志华还关联多家粮油公司,并在益海嘉里(哈尔滨)粮油食品工业有限公司、益海嘉里(沈阳)粮油食品工业有限公司等多家金龙鱼旗下公司任高管。
  • 相关部门应加强配合妥善处理私募股权基金风险

      近日,英伟达创始人黄仁勋和OpenAI创始人奥特曼在谈及AI时纷纷表示,AI的尽头是光伏和储能。据悉,英伟达CEO黄仁勋在一次公开演讲中指出,AI未来发展与状和储能紧密相连。“AI的尽头是光伏和储能!我们不能只想着算力,如果只考虑计算机,我们需要烧掉14个地球的能源。”
  • 教育部公布国家奖学金名单 49978名学生“上榜”

      “最让我感觉兴奋的是,在硅谷这些地方,我们接触到了很多非常年轻的创业者,他们从不怀疑AI能否改变世界,他们的创业项目,都是基于AI时代已经到来的前提下开展的。”李可佳向我们回忆,而这些AInative思维加持下的创业者,也让他真正看到了未来的图景。
  • 外汇储备事关重大 大扩大收要积极应对

      由于Kaia善于保持休闲风格,她选择了自己钟爱的“Samba”运动鞋作为鞋履,展现出时尚与舒适并存的风格。
  • 任泽平:中国应如何面对美国税改?

      (修楚)声明:新浪网独家稿件,未经授权禁止转载!
  • 14亿宅在家的中国人,目击了一场互联网流量大迁徙

      凡是有GLV字母标志的,都代表它的灵感是来自于Gaston-LouisVuitton的收藏