在线看免费❗_女生输了男生整女生一年10000字-艺文笔记

王金豹 2026年01月20日 23:54:18
发布于:曼谷

在线看免费❗_女生输了男生整女生一年10000字_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
73 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 田浩洋:3.8黄金非农来袭,欢迎大家前来交流

      在新车型方面,AITO问界新M5将于上半年推出,下半年将推出全新车型问界M8,在高端智能汽车市场的实力不容小觑。
  • 股市下跌与熔断机制无关

      “比如你做到下一个里程碑,也许不需要这么多钱,或者你拿多了,其实是预支了未来的筹码。”袁进辉说。
  • 大乐透头奖5注1000万4注追加 奖池余额10.5亿元

      市占率仍达三成,价格战下新能源A级车销量不增反降
  • 善林金融公关惊魂后谈感受:一只没有工作的公关狗

      兹委托先生/女士(身份证号码:)代表本人(单位)出席金科地产集团股份有限公司2024年第二次临时股东大会,并代为行使表决权。本人(单位)已充分了解本次会议有关审议事项及全部内容,表决意见如下:
  • 刚刚,华为重磅官宣!

      正式退出中国大陆市场”的消息图源:贝玲妃官博
  • 法国外贸银行:美元涨势到头了 贵金属才是明年主角

      游戏主播嘉年华以其独特的魅力吸引了无数游戏玩家的关注。在这次活动中,不仅有国内外知名游戏主播的精彩表演,更有诸多游戏厂商带来的最新游戏体验、激动人心的比赛和丰厚的奖品。玩家们在这里可以尽情体验各种游戏的乐趣,与心仪的主播面对面交流,共同探讨游戏技巧与心得,这无疑是一次难得的互动体验。
  • 涉信披违规被立案 最贵*ST股拉响退市警报

      沧浪亭不仅是一座美丽的园林,也是一座充满人文气息的历史遗迹。园内的建筑和景物都承载着丰富的历史文化内涵。例如,沧浪亭内的石刻碑文和楹联都反映了古代文人的风采和才情。此外,园内还有许多历史文物和古代艺术品,为游客提供了深入了解中国传统文化的机会。
  • 高晓松:此刻49岁 我最想睡个晴朗的觉

      高溢价并购之下,达嘉维康账上商誉高企。截至2023年三季度末,达嘉维康商誉账面余额为4.89亿元,与2023年1月1日相比增长180.41%。
  • 双眼皮贴贴久了,眼睛会单变双吗?

      这种现象对北京传统品牌家装企业形成不小的冲击,首先,传统家装企业的获客成本往往较高,而“家装新势力们”往往依托于原有平台或国企背书,在获客资源、成本上优势明显;同时,市场环境在变,家装群体也在变,年轻刚需家装群体消费具备集中性、爆发性,兼具消费价格的明确区间属性,也助推家装新势力可以在较短时间内迅速赢取可观的市场份额。
  • 古刹灵隐寺凌霄花盛开

      2018年4月3日,摩拜单车深夜召开股东会通过美团收购方案。美团以27亿美元作价收购摩拜(包括65%现金和35%美团股票),并承担摩拜债务,管理团队留任。一场几乎所有参与者都选择的理性并购案,也是过去十年间中最大风口“共享”浪潮的句点。
  • 2016年股市的希望在供给侧改革

      值得一提的是,在此之前,唯一一次获此殊荣的中国科技企业产品是2019年2月的华为MateX,距离此次MWC已经过去了五年。
  • 美股三大指数集体收涨 英伟达收盘再创新高

      对于一款A0级的SUV来说,外观设计风格一定会以增强车辆视觉效果,要体现出超越车身尺寸的大气以及辨识度为主,并且在车型线条上有所创新,这款比亚迪元UP就是如此。它的长×宽×高(mm)分别为4310×1830×1675,轴距达到2620mm。
  • “专家建议”,让我一天亏了20万

      最重要的是,这些都是混动车型,没有里程焦虑。做商务接待就算有专职司机专门保持电量健康,但一些中长途的情况还是不能驾驭,就算5C充电站充电速度确实很快,总不能让贵客等着你插枪充电吧。