免费精品综合导航👅_开车污的 女生越疼男生越来越快 段子动-艺文笔记

王金豹 2026年01月19日 12:29:10
发布于:曼谷

免费精品综合导航👅_开车污的 女生越疼男生越来越快 段子动_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
74 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 土超女排费内巴切完胜居首 瓦尔加斯复出替补5分

      亚伯拉罕-安瑟最后一轮只打出72杆,与前两天狂抓鸟不同,今天他只抓到1只小鸟,吞下3个柏忌。他的三轮成绩为197杆,低于标准杆13杆。
  • 再现整形医院客户信息泄露事件,顾客接连被“劫”走

      通过修下颌提升面部紧致感,再用收缩色腮红内推颧骨,会让面部外轮廓整体向内推,从而显得脸小。ps:现在流行的小孩姐修容法、W修容法其实都不太适合骨骼感不明显的圆脸。
  • 学会拒绝内卷摆脱亚健康

      非农数据公布后,美元指数短线下挫,最低至102.39,随后有所反弹;美国国债收益率盘中刷新2月2日以来最低水平;国际金价再创历史新高,纽约商品交易所黄金期货市场交投最活跃的4月黄金期价8日上涨20.3美元,收于每盎司2185.5美元,涨幅为0.94%。
  • 上市以来首亏!汽车巨头东风集团遭遇阵痛期

      在整体桥梁的设计上,港珠澳大桥主体桥梁大量采用预制钢结构建造,总用钢量达42万吨,这些钢材足以建造十座鸟巢。精湛的施工工艺,让大桥使用寿命长达120年,比目前世界上的跨海大桥普遍的设计使用寿命再提高20年,成为世界桥梁建设新的标杆。
  • 投资研报扫码订阅

      贝玲妃的产品
  • 收盘:美股收高标普指数再创新高 鲍威尔继续释放降息讯号

      早在2018年,NVIDIA推出RTX技术和首款专为AI打造的消费级GPU(GeForceRTX)时,就已经在AI加速领域布局,时至今日,目前基于RTX显卡的PC和工作站已是数以亿计,目前已成为拥有超过1亿用户和500余款AI应用的庞大NVIDIA生态系统。而基于RTX显卡训练出的AI大模型更是不计其数。
  • 日本供给侧改革后股市深蹲起跳

      皇家加勒比在YouTube平台上公布了一个票价包含明细的视频,总的来说,船票一般会包含房费、正餐时段餐费、主要娱乐设施畅玩费等。
  • 一二线房价将进入缓慢上涨阶段

      而在中国食品产业分析师朱丹蓬看来,金龙鱼的品牌效应跟规模效应,在行业里一直都是独树一帜的,但之后重资产模式,让整个利润率这一块低于同行业。随着其他企业大单品的夯实以及核心品类的扶持之后,会被对手蚕食市场。整体来看,金龙鱼的核心竞争力主要体现在规模效应,但是在多品牌多品类方面来说,金龙鱼还是缺乏综合实力的。新浪合作大平台期货开户安全快捷有保障海量资讯、精准解读,尽在新浪财经APP
  • 国家发改委:预计猪价或频繁涨跌调整

      3月3日晚,农夫山泉公众号发表文章《钟睒睒:我与宗老二三事》,文中称自己及农夫山泉近期遭受了大量网络暴力,因此需要作出澄清。钟睒睒指出自己第一笔创业收入是窗帘业务,不是来自于娃哈哈,从未在娃哈哈领薪、更谈不上因冲货被开除。(蓝鲸财经)@蓝鲸财经记者工作平台
  • 环球时报社评:台积电变“美积电”,警钟已经敲响

      要想保持面部紧致向上,一定要有定期健身的习惯,维持肌肉含量与低体脂状态。同时根据自己情况辅以光电类射频类项目维持紧致。
  • Web3Labs 完成种子轮 200 万美元融资

      在何赛飞看来,这正是原著小说作者艾伟的成功之处,塑造了如此特殊和不常见的女性,在她的身上赋予很复杂的戏剧性,在和导演的多次前期沟通中,何赛飞逐渐去读懂和理解这个人物。
  • 外媒称越南总理访澳是摆脱对华依赖的例证,外交部回应

      第一部小说,鹿小策讲,写到10万字时才开始投稿签约,跟每个新手作者的必经之路一样,最开始她也是被拒稿。辗转投稿,最后找到千字3元的签约模式,于是推翻10万字首稿,重新开始写作。日更3000字,每个月能挣90元。30万字的小说,最后她一共挣了900元。第二部小说依然如此,没有掀什么大的水花,拿到的稿费基本就是全勤奖,每天保证更新3000字,就能拿到手90元。