国内精品♨️_大密波2无删减版在线观看免费视频-艺文笔记

王金豹 2026年02月05日 23:38:29
发布于:曼谷

国内精品♨️_大密波2无删减版在线观看免费视频_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (Ref. Fig. 401/TASK 71-22-11-991-300) Subtask 71-22-11-020-051  A. Removal of the Aft Engine Mount. NOTE : Removal of the hardware that attach the aft engine mount to the ____  engine is the same at the three engine flanges.

 (1) Remove the retaining pin (5) from the bolt (15).

 (2) Remove the bolts (30), washers (35), (50). and nuts (55) that attach the retainers (60) and (70) to bracket (40).

 (3) Remove the retainers (60) and (70) from engine.

 (4) Remove the spanner nuts (65) and (75) from the bolt (10) and the pin (15).

 (5) Remove the bolt (10) from the pin (15).

 (6) Remove the pin (15), and the brackets (20) and (40) from the engine flange.

 (7) Disengage the link assemblies from the engine flanges and remove the engine mount (85) from the engine.

 (8) Remove the bushing (25), (45), and the shoulder bushing (80) from the engine flanges.

 Subtask 71-22-11-480-052  B. Installation of the AFT ENGINE MOUNT ANTI GOUGE SPLINTS.  (1) Put the top slint assemblies (larger) on the outside of the aft engine mount links.  NOTE : The end of the splint assembly marked TOP must touch the beam ____ assembly. The other end marked BOTTOM must touch the links.  (2) Put the bottom splint (smaller) on the inside of the aft engine mount links.  F 『 EEFF : ALL E Page 40271-22-11  E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 Aft Engine Mount  Figure 401/TASK 71-22-11-991-300

 F 『 EEFF : ALL E Page 40371-22-11  E E Feb 01/98 E E ECES E

 F  『  E  C F M  E  E  E  E  56-5B  E  E  E

 (3) Attach the SPLINT - ENGINE MOUNT AFT (RSE1224) to the engine mount two places with TY WRAP.  (a) Wind the TY WRAP around the splints and the aft mount where the splint touches the beam assembly.

 (b) Wind the TY WRAP around the splints and the aft mount where the splint touches the link.

 (c) Make sure that the TY WRAP is wound very tight and that the splints can not move.

 F 『 EEFF : ALL E Page 40471-22-11  E E Feb 01/98 E E ECES E

 F 『  E C F M E  E E  E 56-5B E  E E

 TASK 71-22-11-400-041  Installation of the Aft Engine Mount  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  ------------------------------------------------------------------------------- REFERENCE  QTY DESIGNATION  ------------------------------------------------------------------------------- No specific  Torque Wrench : range 8.00 to 75.00 lbf.ft  (1.00 to 10.00 m.daN)  No specific Torque Wrench : range 15.00 to 150.00 lbf.ft

 (2.00 to 20.00 m.daN) R No specific Torque Wrench : range 5.00 to 35.00 lbf.in R (0.05 to 0.40 m.daN)  RSE1098 1 WRENCH SET - AFT ENGINE MOUNT  RSE1224 2 SPLINT - ENGINE MOUNT AFT

 B. Consumable Materials  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- Material No. CP5063  *  Silicone Lubricant (Ref. 70-30-00)

 C. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 71-00-00-000-042 Removal of the Power Plant 71-00-00-400-042 Installation of the Power Plant 71-22-11-991-300 Fig. 401  F 『 EEFF : ALL E Page 40571-22-11  E E May 01/05 E E ECES E

 F  『  E  C F M  E  E  E

 3. Job Set-up __________  Subtask 71-22-11-860-050

 A. Make sure that the engine is removed (Ref. TASK 71-00-00-000-042)  Subtask 71-22-11-080-052

 B. Remove the SPLINT - ENGINE MOUNT AFT (RSE1224) from the aft engine mount.  4. Procedure _________  (Ref. Fig. 401/TASK 71-22-11-991-300)  Subtask 71-22-11-420-051

 A. Installation of the Aft Engine Mount. CAUTION : INSTALL THE BUSHING (80) WITH ITS SHOULDER AT THE INTERIOR OF _______  THE ENGINE RANGE.

 NOTE : Installation of the hardware that attach the aft engine mount to   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2

原标题:
99 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 西安交通大学2018年新增人工智能和大数据专业

      接到张女士投诉后,澎湃新闻多次致电该机构负责人,但电话无法接通。张女士称,由于退款诉求迟迟得不到解决,目前已经在着手准备起诉维权。双方合同
  • 无人接盘618

      其次,考虑到s1mple的年纪,他已经26岁了,巅峰期马上就要过去了。再过几年s1mple就真的得讨论退役了,为什么要选择在这样尴尬的时刻休息?他本可以在前年夏天休息,让DaniilValitov|headtr1ck上场;也可以在巴黎Major后休息,这样w0nderful可以尽早入队,等s1mple休息好之后就可以一起迎接新版本了。
  • 彩金群英会金币价格今天多少一克(2018年11月06日)

      3月8日,COMEX4月黄金期货收涨0.32%,报2165.20美元/盎司,连续第5个交易日创下收盘历史新高。现货黄金同样创下新高,摸至2164.65美元/盎司,报收2159.80美元/盎司,为续第七个交易日上涨。与此同时,国内市场金价也走势强劲。
  • VR 太空狼人杀游戏《Among Us VR》已登陆 PSVR2 头显

      过去的西海固,一方水土养不活一方人。农民为了吃饭穿衣会过度开垦,以生态换粮食。结果就是越垦天越旱,越垦人越穷。为了扭转这种局面,在解决生活用水和产业用水的同时,宁夏也在积极开展生态移民、退耕还林还草,实现生态蓄水。而水土涵养本身,也会带来更多降水,这样一来就实现了生态越好、降雨越多的良性循环。△资料图
  • 新浪彩票双色球名家第24027期推荐汇总

      另外,护理楼大厅内设置了温馨的儿童乐园,为前来探望长辈的小朋友提供一处嬉戏玩乐的空间。
  • 看完这届上海车展 我发现燃油车“已死”

      以上就是正文的全部内容啦,乐居测评师团队将持续更新【楼盘测评系列】,敬请关注。想要了解更多楼盘细节,可以点击文章开头处楼盘卡片,浏览楼盘详情;同时下方为您推荐了最新的主题楼盘内容哦。
  • 觐见教皇后 IBA主席发誓和国际奥委会官司打到底

      张齐建议推动建立父亲育儿假制度,“2021年颁布的《家庭教育促进法》明确,未成年人的父亲与母亲均应亲自养育,加强亲子陪伴,同年修订的《人口与计划生育法》也指出,国家支持有条件的地方设立父母育儿假,将父亲育儿假纳入国家劳动权益保障体系,可减少生育对女性就业的负面影响。”同时,在国家层面建立分级共担育儿假成本机制,以经济上的有限损失置换国家的健康人口结构。带薪育儿假的成本不应仅由用人单位承担,应建立企业、生育保险基金、政府财税政策等多元责任主体分担机制,加强政策执行的指导监督并明确惩罚措施,探索灵活休假方式,在提高育儿假使用效果的同时尽量降低对用人单位运营的影响。
  • 马斯克,中国夸夸群群主

      家装行业当前的竞争确实非常激烈,但这种竞争主要还是低质量发展层面的竞争,家装的所谓内卷,其真实内容是在以往粗放式经营上的内卷,更形象一点说,是在习惯的大碗喝酒、大口吃肉形式上的内卷,家装的三大基本功,设计、施工交付、服务上,大家都做得不好或者不那么好,拉不开差距,没有了潮水般蜂拥而至的客流,需要狠拼内功了,突然大家都觉得不会了,只能停留在价格、供应链、概念、营销的肉搏上,在这些领域,家装内卷了,还很严重!
  • 王俊凯3条破亿微博转发近6亿 超人气偶像创纪录

      创投时代的高光与转折;商业偶像的人生峰谷;以及影响了更多数人的选择
  • 重大转变!全球资金正重回中国股市!

      1、项目价格暂未公布,请持续关注,板块内均价为84415元/㎡可供参考
  • USDA:3月份公布的美国玉米供需平衡表

      1、登记方式:凡符合上述条件的个人股东请持本人身份证和深圳证券账户卡,受托代理人出席还需持受托人身份证、授权委托书;法人股东持营业执照复印件(加盖公章)、深圳证券账户卡、法定代表人资格和身份证明、授权委托书及出席人身份证办理登记手续。异地股东可用信函或传真方式登记。
  • 央行需要适度下调存准率

      万圣节版本BOSS战