免费精品综合导航👅_亚洲成品1688进入-艺文笔记

王金豹 2026年01月19日 14:57:40
发布于:曼谷

免费精品综合导航👅_亚洲成品1688进入_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
75 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 越涨越买 金价新高催动消费投资双热

      对此,中国家居产业发展峰会大雁奖组委会执行秘书长王晓洁指出,当前,家居行业作为大宗消费品,被赋予了更大的期待,而家居企业和品牌的高质量发展则成为推动美好生活的重要力量。2023中国家居产业发展峰会旨在增强企业质量和品牌发展能力,推动开展中国品牌创建行动,开展品牌理论、价值评价研究,完善品牌价值评价标准、推动品牌价值评价和结果运用,为产业聚力、为品牌赋能。协会:达成认知,扩圈向上
  • 地方债置换对银行有多重利好

      特朗普在一次采访中说:“没有TikTok,你会让Facebook变得更强大,我认为Facebook是人民公敌。”
  • “价格屠夫”卷向美国,拼多多海外版砍了谁一刀?

      提交申请后,还需要等海底捞加盟委员会审核。《豹变》致电海底捞加盟热线,欲询问进一步信息,被告知目前详细的加盟政策还没出来,没有更多信息可以透露,填了表之后耐心等待即可,七个工作日内会联系符合投资门槛、加盟资质的候选人进一步洽谈。
  • 大学“胖胖班”走红:人均减重近5kg 仅1人不降反升

      最后唠叨下空间,其实完全不用操心,这车现在长大了两圈,后排座位的空间甚至比同平台的BMWX2还要宽裕,不过它仍旧是台MINI,我认为乘坐五个人还是有点勉为其难了,四个人是比较恰当的选择。后备箱地板下也跟X2一样拥有一个巨大的暗格,可以放平时不用常用的装备,官方给到的数据是行李厢容积可以从460升扩展至1530升,而这个隔板存在的另一层意义是它可以让二排座椅放倒后获得一个纯平的后部空间,让看星星、露营什么的都不在话下。
  • 2018年高考志愿填报:同分/同位次考生去向查询

      中青报·中青网记者马宇平来源:中国青年报
  • 有多少孩子,毁于不愿分离的爱?

      随着‘女性鞋履’对球鞋设计的影响越来越大,玛丽珍鞋的独特轮廓、芭蕾舞鞋的复杂绑带精准地击中了女性市场的需求,同时也引发了更多的期待。或许在2024年,会有更多的女性化元素出现在运动鞋之上,这值得我们期待。关键词:加载中点击加载更多
  • 马斯克,中国夸夸群群主

      巅峰时期的2010年,碧生源的常润茶、常箐茶两款产品,一年的收入就可以达到5.66亿元和3.04亿元。如今,这两款产品仍是公司的明星单品,但2023年的收入,已分别降至1.03亿元和1.09亿元。
  • 中信建投:哪些热点有望继续上涨?

      2023年,我们能够发现有不少的联名企划开始对玛丽珍鞋展开创作,这股趋势愈演愈烈,就连《时尚芭莎》都将去年形容为‘玛丽珍年’。CecilieBahnsenxASICSGT-2160
  • 程序员节日快乐!黄轩晒与印小天等合影笑容灿烂

      多语言能力测试中,MistralLarge在法语、德语、西班牙语和意大利语的ArcChallenge、HellaSwag、MMLU等基准测试中的表现均远超目前公认最强的开源大模型——Meta的LLaMA270B。
  • 14天在新西兰可以做的22件小事

      现在的辛芷蕾是我美丽的精神状态。
  • 金融支持房地产有力有效 “白名单”项目融资加速推进

      央行公告称,为维护银行体系流动性合理充裕,3月11日以利率招标方式开展了100亿元7天期逆回购操作,中标利率为1.8%。Wind数据显示,当日100亿元逆回购到期,因此单日完全对冲到期量。
  • 皮海洲:董明珠鼓励员工“砸锅卖铁”买格力股票不等于投资者也可以

      苹果专利图14是一种说明性可穿戴设备的侧视图,其中构件在接头处耦合,例如带有摩擦铰链和/或扭转弹簧的接头;图21是一种说明性设备的透视图,该设备带有一对平行的独立可调铰链表带部分;图22是图21说明性设备的透视图,其中铰链带部分被配置为形成iPhone的支架。
  • 中方搁置了中阿央行间约65亿美元货币互换协议安排?外交部回应

      责任编辑:王树淼SN242芬森不管队友了
  • 英国脱欧加大中国经济下行压力

      因为在我们的潜意识中,都设定好了自己的体态和体重,不容易随意改动。