国内精品♨️_欧美亚洲-艺文笔记

王金豹 2026年01月24日 15:00:01
发布于:曼谷

国内精品♨️_欧美亚洲_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-00-00-810-801  Display of an Operational Warning on the Upper ECAM DU

 1. Possible Causes _______________  - Message on the Post Flight Report (PFR)  2. Job Set-up Information

______________________  Not Applicable

 3. Fault Confirmation

__________________  A. Test  Not applicable, no confirmation test is necessary.

 4. Fault Isolation _______________  A. Do a check for a Message on the Post Flight Report (PFR).  If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message.  NOTE : Some operational Warnings are not printed on the PFR. ____

 AILERON - FAULT ISOLATION PROCEDURES ____________________________________  TASK 27-10-00-810-801  Loss of Signal on the Left Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, L (25CE1)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201  May 01/00 CES (2) If the fault continues:

 - do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23).  B. Do the operational test and the BITE test given in Para. 3.

 Loss of Signal on the Right Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, R (25CE2)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:

 - replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 1

原标题:
70 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 花王集团旗下品牌ALLIE助力“扎染传承” 公益活动

      《暗黑破坏神4》支援线上跨平台游玩除了共同操作教学外,你也可以和朋友一起游玩,不管他们的地下城通往何方。
  • 徐翔即将出狱:人过中年,禁入股市,“私募一哥”能否从头再来?

      CS新版本在发布之初的玩家数量曾出现过下滑,不过随着V社对游戏的优化更新,玩家数量也节节攀升。同时鉴于Major即将到来,预计这个数字还会上涨。
  • 高端腕表丢了还能找回来吗?现在有这个方法可试

      中国科学院消息,经过四年努力,广东科学家领衔的国际研究团队首次利用基因编辑技术(CRISPR/Cas9)和体细胞核移植技术,成功培育出世界首例亨廷顿舞蹈病基因敲入猪。它能精准模拟出人类神经退行性疾病,为治疗亨廷顿舞蹈病、老年痴呆等疾病提供稳定、可靠的动物模型,推动药物筛选和治疗方案制定。该项成果于今年北京时间3月30日凌晨在线发表于《细胞》杂志上。
  • 股海导航 3月8日沪深股市公告与交易提示

      古装作品:《斗破苍穹之少年归来》
  • 足彩彩果:拉齐奥1

      继小鹏汇天在年初的全球首场科技展CES盛会上推出名为“陆地航母”的分体式飞行汽车之后,上海峰飞航空旗下的“盛世龙”飞行汽车日前也成功完成全球首条跨海跨城空中航线(深圳—珠海)的首飞。与此同时,吉利沃飞长空成功研发的AE200飞行汽车也在成都高新区圆满完成首飞动作,广汽的飞行汽车GOVE在广州也首次完成在城市公众复杂低空环境的飞行验证。中国飞行汽车正以“领跑”全球的姿态加速驶来,有望为新质生产力赋能“添翼”。
  • 新一届中国女排22人大名单 张常宁回归朱婷无缘

      中国式现代化体现科学社会主义的先进本质,展现了不同于西方现代化模式的新图景。西方国家在现代化进程中无法遏制资本贪婪的本性,无法解决物质主义膨胀、精神贫乏等痼疾。中国式现代化致力于物质文明和精神文明相互协调、相互促进,让全体人民始终拥有团结奋斗的思想基础、开拓进取的主动精神、健康向上的价值追求,为全面建设社会主义现代化国家提供了源源不断的动力。巴基斯坦驻华大使莫因·哈克说:“相信中国一定能够实现国家发展目标,建设一个物质文明和精神文明相协调的强大国家。”俄罗斯联邦共产党中央委员会主席根纳季·久加诺夫表示,中国的快速发展已成为人类文明发展进程中一项重大成就,中国式现代化的成功经验将为更多国家和人民开辟通往美好未来的道路。
  • 多重利好傍身,黄金牛市准备就绪

      “掌”握科技鲜闻(微信搜索techsina或扫描左侧二维码关注)
  • 经济不起则宽松不已改革不停

      事实上,在新能源汽车开启新一轮“降价潮”的背景下,即将上市的小米汽车定价备受关注。
  • 2023艺体化年终盛典 为体教融合继续添砖加瓦

      摘要:7月31日下午,全国工商联家具装饰业商会携全国商会企业代表举办学习贯彻落实《关于促进民营经济发展壮大的意见》和《关于促进家居消费的若干措施》会议。会议在北京设主会场,全国各地设立40多个分会场。
  • 要大声说:“你什么都不知道,和你无关,请闭嘴!”

      对于一款A0级的SUV来说,外观设计风格一定会以增强车辆视觉效果,要体现出超越车身尺寸的大气以及辨识度为主,并且在车型线条上有所创新,这款比亚迪元UP就是如此。它的长×宽×高(mm)分别为4310×1830×1675,轴距达到2620mm。
  • 中国宁波一号荣耀回港 携手宁波扬帆未来

      法国《世界报》网站3月9日报道称,就丹麦支持乌克兰一事,丹麦国防大臣特勒尔斯·伦·波尔森说:“我们没有计划,也没有考虑将派遣士兵进入战场作为一个选项。”至于在其他方面,丹麦是毫不吝啬地提供援助。
  • 博物馆里寻年味 文化之美绽旅途

      (3)施工交付成本逐年攀升,主要是人工成本上升势头明显,加之施工流程管控多年来没有明显进步,施工周期依然过长,导致施工交付端成本居高不下,更致命的是,施工交付人员来源青黄不接,部分工种已经出现人员断档征兆,比如泥瓦工、油工等工种,本次调查的施工人员平均年龄已经超过47.2岁,30岁以下的年轻师傅仅遇见1人。
  • 神舟十四号船箭组合体转运至发射区 计划近日择机实施发射

      二、通过深交所交易系统投票的程序