国产自拍👅_www.8x8.com login-艺文笔记

王金豹 2026年01月18日 00:23:37
发布于:曼谷

国产自拍👅_www.8x8.com login_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

(c)  Optimum altitude The optimum altitude is displayed on the PROG page. It is computed by taking into account the active strategic mode (including the cost index if it is ECON), the predicted aircraft and atmospheric conditions. The optimum altitude is limited from above by first, the maximum altitude (Ref. para 1 above), and then the condition of a minimum of 5 min. flown in cruise at that altitude. (Ref. Fig. 043)

 (8) Maximum Holding Time  (a)  Last exit UTC (TLE) If the fix is the TO or FROM waypoint, the FMGC computes the latest time when the A/C has to leave the hold so as to satisfy the fuel reserve requirements (corresponding to EXTRA = 0) and the estimated fuel on board at that time. They are displayed on the HOLD page. (Ref. Fig. 044)

 (b)  Logic for display of TIME TO EXIT message  The conditions to display the message are:

 -LAT AUTO CONTROL is active  -hold is the next or active leg, and it is taken into account for guidance  -last exit UTC is available  -and IMM EXIT has not been selected, or RESUME HOLD has been  selected. Considering: Delta T = Last exit UTC - predicted UTC of next passage over fix Three cases are possible:  -Delta T > time to fly a complete holding pattern: no message

 Time and Fuel to Exit the Hold  Figure 044

 - Delta T < time to fly a 360 deg. turn: message immediately displayed.

 - Delta T bounded between a 360 deg. turn and a complete holding pattern: message displayed when the A/C next flies the first turn of the holding (1min. after passage over fix.)

 The message, when displayed, is removed if it is cleared by the pilot, if the IMM EXIT prompt is selected, or if LAT AUTO CONTROL is not active.  (9) Wind/Temperature Model  (a)  Wind model If no wind has been inserted or entered by the pilot for climb (descent) at intermediate levels between origin (destination) altitude and cruise altitude, a default climb (descent) wind model must be used for wind prediction . It is defined as follows: Default climb (descent) wind model: The wind is linearly interpolated versus altitude in magnitude between origin (resp. destination) wind and T/C (resp T/D) wind. Winds at origin (resp. destination) and cruise altitude have default values of 0kt. If they are entered by the pilot, wind direction is also linearly interpolated versus altitude ; but if only one entry is made, the wind direction is constant and equal to the entry. If no wind has been entered, no wind direction is defined: 0kt/O deg. is displayed.

 (b)  Temperature model Temperature predictions along the Flight-Plan are based on standard model (ISA), pilot entries and actual temperature at the present position of the aircraft. Temperature may be entered only at cruise flight level through the INIT A or the FUEL PRED page and at destination through the APPROACH page. (Ref. Fig. 004, 038)

 (10) Secondary F-PLN predictions A secondary F-PLN may include all of the vertical elements possible in the active primary F-PLN, except that climb or descent wind entries are not possible. Performance calculation methods are the same (and use the same performance factor), except that altitude planning (on the SEC PERF pages) is not possible and only MCDU pseudo waypoints are predicted.

 (a)  Secondary F-PLN created by a copy of active F-PLN Predictions are calculated if:

 1. 1.1- flight phase is preflight and the origin airports are identical (although the selected runways may differ) or 1.2- flight phase is take off, climb or cruise and the first lateral leg of the secondary F-PLN is identical to the active leg of the active F-PLN AND

 2. 2.1- the secondary F-PLN does not include a destination or 2.2- the top of descent pseudo waypoint for both the secondary F-PLN and the active F-PLN are predicted beyond the aircraft If the above conditions are not met, secondary flight plan predictions are dashed. Performance calculation methods for the secondary F-PLN created by COPY ACTIVE are based on the same assumptions as for the primary F-PLN : before engine start the primary INIT data is used (weights, ZFWCG, CRZ FL, etc) ; after engine start, the same current aircraft characteristics (GW, FOB, CG, ALT, SPD, engines running : 2 or 1) and the same CRZ FL, as the primary F-PLN. When any of these data is modified, SEC F-PLN predictions are updated accordingly. No secondary F-PLN predictions are available when engine out mode is active. When available, predictions are provided for display on the following MCDU pages: SEC F-PLN : predictions for each waypoint and pseudo waypoint up to and including the destination ; for the SEC ALTN F-PLN only EFOB at destination is calculated. HM's in the SEC F-PLN will be ignored by predictions until the HM entry fix is sequenced. SEC VERT REV : fuel predictions. SEC PERF : predictions at destination (total time and distance). Altitude planning is not available. Entries of cost index, manual speed preselections, and descent auto speed are taken into account.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AUTO FLIGHT 自动飞行4

原标题:
65 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018新浪教育盛典候选机构:景鸿环球集团

      璞瑅学校相关负责人告诉记者,学校坚持“课比天大”的原则,线上授课,改变的是授课形式,不变的是对授课质量的要求。学校按“三表”(作息表、课表、教学进度表)线上直播授课,引导和规范学校教师的线上教学行为,切实提高线上教学质量,保证学生居家学习效果。在半天学习结束时,学校及时召开全体中层、年级组长、教研组长会议,及时梳理并进行反馈,以便下午教育教学的有效推进。
  • 棕油看多氛围增加 油脂盘面进一步走升

      潮流引领者贝拉(Bella)很早就将办公室核心风格打造为自己的风格。露出胸部的性感造型引起了人们的注意。
  • 实用彩妆小技巧 通过“三重粉色”一扫肌肤暗沉!

      人才培养是系统工程。优化基础学科教育体系,需要加强不同学段的衔接协同,特别要注重基础教育阶段和高等教育阶段的协同配合。“中小学阶段是学生个体科学素养形成的决定性阶段,科学教育的重点在于基础教育。”北京师范大学科学教育研究院院长郑永和说。
  • 花王集团旗下品牌ALLIE助力“扎染传承” 公益活动

      虽然想法各有千秋,但这些广告都在AI的基础上保留了真实的情感和耐人寻味的部分,契合了苹果公司那句最著名的广告语“ThinkDifferent”(不同凡想)。
  • 满帮集团营收超84亿净利翻倍 履约订单增三成创新高

      黎辉火线出手,瑞幸绝处逢生:2023年总净收入为249.03亿元,同比增长87.3%。这可能将是一笔写入商学院教程的案例。
  • 长线资金加大布局力度紧盯三大方向

      最有可能的选择是那些公司高层,尤其是那些对苹果未来发展有重要影响的人。
  • 任泽平:做好预调微调 确保经济稳中向好

      问:教育事业的发展,可能是一场“持久战”。对于当下正在因为学业而挣扎的学生和家长,您有什么建议吗?
  • 牙齿没了怎么办?老年人镶牙有三个选择

      根据中国证券监督管理委员会《关于同意晶科能源股份有限公司向不特定对象发行可转换公司债券注册的批复》(证监许可〔2023〕683号),晶科能源股份有限公司(以下简称“公司”)获准向不特定对象发行可转换公司债券10,000.00万张,每张面值为人民币100.00元,募集资金总额为1,000,000.00万元,本次发行的可转换公司债券的存续期限为自发行之日起六年,即自2023年4月20日至2029年4月19日。
  • 新加坡大满贯国乒首日全胜 陈梦梁靖崑轻松进次轮

      不张扬的灰能够调节黑白色,穿出强大气场,不需要华丽的赘饰却能够后烘托出轻奢贵气!
  • 苏州龙杰核心工艺将被淘汰?最大客户上法院失信黑榜

      由于领先优势太明显,这也导致黄仁勋接受采访时表示,英伟达的GPU“非常好,即使竞争对手的人工智能(AI)芯片是免费的,但它也不够便宜”,无法击败英伟达的GPU。
  • “最难2022” 本土上市美妆公司捱过来了吗?

      “2024年的权益资产配置价值是凸显的,这是因为国内资产价格在二级市场表现处于历史低位,并且与全球大类资产价格相比,也极具性价比,另外,全球加息周期已进入尾声,下半年美联储大概率率先降息,国际市场流动性将趋于宽松,今年的权益资产市场表现将优于2023年。”王兆江表示,下一步险资权益配置比重大概率会提升,企业上看,投向将包含央企、地方国企控制的优质资源、优质企业,还包括产业升级方向,比如具有新质生产力的企业;行业上看,将包括有色、能源、金融、地产、非银、保险、交运、物流、公用事业等。
  • 中华全国体育基金会成立30周年发布公益项目

      爱情需要细心地去照顾,用真心去感受,用实意去承诺,用态度去感应。
  • 谁能替代英伟达?

      京东近日首次公布了“织网计划”的建设成果。以43座“亚洲一号”大型智能物流园区和全国范围内运营的约1400个仓库为核心,搭建起高度协同的多层级物流基础设施和仓配网络,不仅建立了产业端与消费端之间的信赖,助力约90%的京东自营线上订单实现当日达和次日达,以及全国93%的区县、84%的乡镇实现当日达和次日达;织网生态效应通过“亚洲一号”等智能新基建,还帮助众多企业实现了库存管理优化、运营成本减少以及内部资源的高效分配;同时推动区域经济协同发展和县域经济转型,为全国1000多个农特产地和产业带开展了供应链服务,形成产地产业转型与消费升级的正向循环。