国内精品♨️_二二产品无人区免费-艺文笔记

王金豹 2026年01月21日 03:15:13
发布于:曼谷

国内精品♨️_二二产品无人区免费_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

747-400 MAINTENANCE MANUAL  S 435-028  (21)  Install and lock the turnbuckles.

 (22)  Install the nose gear torsion link apex bolt (Fig. 503).

 (a)   Remove the holding tool from the torsion link.

 (b)   Place the upper torsion link end into the lower torsion link end fork.

 (c)   Lubricate the apex bolt shank and threads with grease.

 (d)   Insert the apex bolt and screw into the threaded bushing.

 (e)   Tighten the bolt hand tight and install the quick-release pin.

 S 415-119  (23)  Do this task:  "Nose Landing Gear Door Operator Rods Connection" (AMM 32-00-30/201).

 (24)  Close the following circuit breakers on the P7 overhead circuit panel:

 (a)   7G23 BODY GEAR STRG ARM AC

 (b)   7G24 BODY GEAR STRG ARM DC

 TASK 32-51-00-735-120  3.  Nose Wheel Steering System Test_______________________________  A. General  (1)   This test is done to ensure proper operation of the nose wheel steering system. The test covers system clearance, system centering, steering rate, normal operation and towing provision.

 (2)   Before beginning the test, the nose gear electrical ground sensing mechanism and steering system must be properly adjusted.

 (3)   The nose wheel steering angle may be directly read on the aluminum foil marker on the forward steering collar.

 (4)   The table that follows contains port/label and bit information.

 (a)   This information is necessary when you do the system test for the steering system of the nose landing gear.

 (b)   Bit 19 below shows if one of the electrical interconnect actuators for the steering system does not operate correctly.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-00  ALL  ú ú 01 Page 512 ú Feb 15/99 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 747-400 MAINTENANCE MANUAL

 ~.......................................................................... | BIT TABLE | ............................................................................ | | Bit Condition | ............................................................................ | Switch | Port/Label | Bit | 1 | 0 | ............................................................................ | PRI NG SNSR | E/070/270/00 | 21 | NG NOT | NG | | | | | COMPRESSED | COMPRESSED | ............................................................................ | ALT NG SNSR | E/070/272/00 | 21 | NG NOT | NG | | | | | COMPRESSED | COMPRESSED | ............................................................................ | PEDAL STRG ACT | C/026/010/10 | 19 | INOP | NORMAL | | MONITOR | | | | | 2................…...................…..........…............….............1  B. Special Tools and Equipment  (1)   8ME65B01202-1 - Torsion Link Holding Tool

 (2)   A27092-84 - Actuator/Deactuator Set - Proximity Sensors

 (3)   G12001 - Rigging Pins  G12001

 Rigging Pin No._______________ Length (inches)_______________ Dash Number  NS-5 4.00 15  NS-6 2.50 5  R-3 3.50 15

 C. Standard Tools and Equipment  (1)   Stop watch

 (2)   Spring scale - 0 to 25 pounds

 D. Consumable Materials

 (1)   D00633 Grease - BMS 3-33 (preferred)

 (2)   D00013 Grease - MIL-G-23827 (optional)

 (1)   AMM 09-11-00/201, Towing

 (2)   AMM 24-22-00/201, Manual Control

 (3)   AMM 27-21-00/501, Rudder and Rudder Trim Control System

 (4)   AMM 29-11-00/201, Main Hydraulic Supply System

 (5)   AIPC 32-21-03 Fig. 1, AIPC 32-51-60 Fig. 1, AIPC 32-51-61 Fig. 1, AIPC 32-51-63 Fig. 1

 (1)   Location Zone  221 Control Cabin, LH  222 Control Cabin, RH  715 Nose Landing Gear

 G. Prepare for Test

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 8

原标题:
66 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 华准检测公司开启云南电梯安全新篇章

      事实上也确实如此。尽管直到去年,“蔚小理”这三家企业各自最鲜明的标签还分别是用户思维、智能驾驶和实用主义,但无论是花大投入做换电,还是决定自己做电池研发、做手机,本质上还是凸显了蔚来对于竞争的思考。
  • 荣耀赵明:没有品牌不可撼动 荣耀已回到原来应有的位置

      北京走访调研共涉及16个小区,33个工地,与22位项目经理、26位现场施工人员、9位业主进行了全方位交流,从施工现场实际呈现的能力和水平来看,北京家装行业施工交付能力20年来的进步甚微,施工现场管理,施工交付工期,施工工艺,施工人员来源及管理,施工工具,施工材料及运用,施工成本管理,全方位几乎裹足不前。除屈指可数的企业在施工交付端具备一定的相对优势之外,绝大部分装企的施工工地,即使是与传统施工队(包工头)工地放在一起,也鲜有优势和特点可言。
  • 董明珠和华为鸿蒙,能炒出火花吗?

      值得一提的是,社区现已开通本地和异地医保结算服务,京津冀就医可一卡通行。因此对于北京等地养老客群也很具有吸引力。
  • 突发!英伟达“跳水”超10%,市值蒸发9200亿元,啥情况?比特币“闪崩”近4000美元,全网7万人爆仓......

      风云T6的座舱采用横贯且平直的中控台线条,再配合贯穿式空调出风口,视觉层次感和视觉宽度都显著拉伸,内部几乎没有物理按键的设计也让车厢显得宽敞了不少,悬浮式大尺寸中控液晶屏以及全液晶仪表则重在提升了科技感。、大量的皮质以及软质塑料的使用让座舱有了更好的触感,纹路细节也挺高级,整个座舱的品质感还是比较出色的。
  • 人民日报海外版:数字科技助力体育“智变”

      新浪家居全国主编王晶认为涂料行业目前尽管全部形势严谨但依然危中有机。暂时的停留并不代表长远,企业也要顺势而为,做精做稳后,经过行业重新洗牌方能在大风大浪中继续前行。
  • 日女排联赛NEC红箭3

      Ø医疗服务
  • 安琥工作室发布声明拒绝炒作:身正不怕影子斜!

      最后,3月6日公布案名的是位于丰台大红门0006地块的“中环悦府”,其销售指导价为9.5万/平方米。该项目由华润置地以34.845亿价格竞得,土地面积24300.839平方米,建筑控制规模≤53522平方米。地块四环内,毗邻地铁8号线大红门南站,周边配套齐全,且位于规划中的国际商务区内,未来发展潜力巨大。
  • 吴谦引用周恩来总理原话回应台湾问题

      华润涂料集团总经理方昕认为,非常形势下:危中有机,会有新的发展机遇。尽管现在涂料行业受到了外部因素影响,但由于国家战略形势的政策措施,以经济建设为中心,国内的整体形势正往上走,相信未来经济形势会逐渐好转。行业的痛点是共同应对的,关于原材料涨价对于涂料行业而言暂束手无策,也在想法应对,但方昕表示,市场的问题就由市场去解决。现在国家房地产政策逐渐放松,作为企业顺应国家政策,顺应市场,这是一个应有的战略发展方向。
  • 法新社:穆里尼奥接受偷税指控 被判1年监禁

      从3月11日行业资金流向来看,主力资金净流入40多亿元,多数行业净流入。其中,工业板块净流入额超20亿元,位居首位,材料、可选消费等板块净流入额亦较高。能源、信息技术等板块则大幅净流出。
  • 相关新闻

      根据目前蔚来放出的消息来看,阿尔卑斯将搭载800V快充架构,采用NT3.0平台,使用更小的电池组和内部开发的电动机。智能驾驶上采用只配备4D毫米波雷达(无激光雷达),以及1个ORINX芯片(目前型号4个),成本上肯定会更节省。按李斌的说法就是,将是“可换电的ModelY”,成本比特斯拉便宜10%左右,所以“定价能够给到一个很好的空间”。
  • 教育部公布2017最新全国高校名单 共2914所

      上海队:王哲林17分15篮板3助攻2抢断,刘铮19分10篮板5助攻,戴昊14分4篮板,李弘权16分9篮板,布莱德索20分7篮板5助攻,培根8分4篮板,闫鹏飞6分。