糖心logo官网✅_恶魔的玩物六男一女-艺文笔记

王金豹 2026年01月18日 04:45:36
发布于:曼谷

糖心logo官网✅_恶魔的玩物六男一女_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 49-23-51-865-059  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.  Subtask 49-23-51-710-051  C. Do the operational test of the APU (Ref. TASK 49-00-00-710-008).  (1) Do a check for leaks on the inlet guide-vane actuator and the fuel tube connections.  NOTE : Leaks are not permitted. ____  5. Close-up

________ Subtask 49-23-51-410-052  A. Close Access  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Set the LIGHT control switch 11LJ to the off position.

 (3)  Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (4)  Remove the access platform(s).

 (5)  Remove the warning notice(s).

 TASK 49-23-51-710-001  Push/Pull Test of the Inlet Guide Vane Mechanism (8014KM) (APS 3200)  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION  ------------------------------------------------------------------------------- No specific axial-scale measuring device  No specific circuit breaker(s) safety clip(s)  No specific access platform 2.5 m (8 ft. 2 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 49-11-11-000-003 Removal of the Power Plant (APU) (APS 3200) 49-23-51-000-003 Removal of the Inlet Guide Vane Actuator (8014KM)  (APS 3200) 49-23-51-400-003 Installation of the Inlet Guide Vane Actuator  (8014KM) (APS 3200) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access  3. Job Set-up __________  Subtask 49-23-51-860-055  A. Aircraft Maintenance Configuration  (1)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.

 (2)  Put a warning notice in the cockpit to tell persons not to start the APU.

 (3)  Make sure that ground fire extinguishing equipment is available.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-23-51-865-062  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-23-51-010-057  C. Get Access  (1)  Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)  Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________ Subtask 49-23-51-710-052  A. Test of the Inlet Guide Vane (IGV) mechanism (IGV Actuator installed)  (1)  Pull the IGV mechanism manually to the OPEN position.

 (2)  Disconnect the quick-disconnect pin from the clevis of the IGV rod.

 (3)  Push the IGV mechanism manually back to the CLOSED position. NOTE : A sign of a serviceable IGV mechanism is a smooth and easy

____  movement of the IGV rod.

 (4)  Engage the axial-scale measuring device through the ring of the quick-disconnect pin.

 (5)  Put the quick-disconnect pin back to the clevis of the IGV rod.

 (6)  Measure the load necessary to pull the IGV mechanism back to the OPEN position. Make sure that the maximum load is not more than 11.3 daN (25.4034 lbf).

 (a)  If the measured load is lower than the maximum load:

 -IGV mechanism is serviceable.

 (b)  If the measured load is higher than the maximum load:

 - remove the APU (Ref. TASK 49-11-11-000-003). Subtask 49-23-51-710-053

 B.  Test of the Inlet Guide Vane (IGV) mechanism (IGV Actuator removed)

 (1)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER4

原标题:
57 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 黄金饰品节前降价抢市场

      强化金融监管是金融强国建设的内在要求。必须依法将所有金融活动全部纳入监管、有效防范化解金融风险,切实提高金融监管有效性。当前金融监管体制在强化党的领导和完善中央银行制度的同时,进一步向“双峰”监管框架迈进,为全面加强金融监管做好了顶层设计。未来全面加强金融监管将成为我国金融工作的重中之重。要全面强化机构监管、行为监管、功能监管、穿透式监管,持续监管,消除监管空白和盲区。严禁“无照驾驶”和超范围经营,坚持对多层嵌套的复杂运行结构或金融产品、各类金融行为的事前事中事后的全过程监管,持续加强对中小金融机构、地方政府债务、房地产市场等重点风险领域的监管。充分运用金融科技尤其监管科技手段,有效提高监管信息化、数字化和智能化水平。
  • 国家金融监管总局局长李云泽:正在研究降低乘用车贷款首付比

      3、公司2019年-2022年年度股东大会分别审议通过了《2019年度利润分配预案》、《2020年度利润分配预案》、《2021年度利润分配预案》、《2022年度利润分配预案》,公司董事会经公司2019年第一次临时股东大会的授权,根据《上市公司股权激励管理办法》、公司《2019年股票期权激励计划(草案)》及相关规定,对股票期权行权价格、数量进行相应的调整。
  • 肖央直播回应《唐探3》延期:顺其自然等下一次

      懂得核反应堆、碱基配对以及RNA转录,和爸爸一起听微积分学会了函数和极限,平时喜欢的游戏是编程。
  • 复兴号高铁那么快 车头上有雨刷器吗?有:1分钟摆动45个来回

      “以前国内走出去的企业以大企业为主,如今众多小企业进入了全球市场。背后很重要的创新就是全托管模式,降低了中小外贸企业走向全球的具体业务实操门槛。”对外经济贸易大学国际商务与经济合作学系主任王健认为,中小企业开始广泛参与全球贸易成为目前全球市场变化中最重要的变化。
  • 盘和林:加快金融支持制造业步伐 稳定经济发展的基本盘

      MINICOUNTRYMAN的内饰设计相当大胆,采用了“极简主义”,驾驶舱仅保留方向盘、MINI招牌式的圆形OLED中央仪表以及拨杆开关组。设计师的意思是想要专注在最基本的驾车元素上,我的感觉是这样车内更加清爽简约,MINI的另一“大胆之处”是摒弃铬元素和皮革,大量使用针织面料。这些面料都是可以回收的,符合BMW集团“循环永续”的要求,更符合JCW的“味道”。
  • 苹果正研究把摄像头装到Apple Watch的表冠上

      《最近女明星的前夫们抱团直播,越卖惨赚钱越多》Vista看天下
  • 一张图前瞻非农:16个关联指标利多黄金,非农+周末临近谨防获利仓搅局

      在全国工商联家具装饰业商会公布的“十条举措”中,包括要围绕绿色低碳政策要求,制定相关标准,开展绿色家居卖场、绿色产品、绿色装修、绿色园区评价认证工作;提升行业企业数字化、智能化水平;引导行业企业加大适老化家居产品研发力度;推动探索家居零售与多业态融合发展;鼓励行业企业抓住城镇小区改造装修等机遇;配合国家相关部门开展多样化的促销费活动;推动完善废旧家居循环利用体系;推进县域商业体系建设;健全家装标准规范;商会成立专门工作小组,加强与国家各部门的沟通协调等。
  • 2018年熊猫银币价格今天多少一克(2018年11月07日)

      重整旗鼓,速速推出L6和“M系列”纯电车型,在最擅长的SUV领域把销量抬上来,恢复大家对理想的信心,才是理想的当务之急。
  • 降准预期高估货币政策的作用

      她和顾维钧结婚时已是年过五旬,身材自然也没有了年轻时的窈窕,而在他们的结婚登记照上,一向不苟言笑的顾维钧,眼中却充盈着爱慕之意。
  • 孕晚期受伤需要打破伤风吗?

      5月19-25日-ESL赛事
  • 2月29日四大证券报头版头条内容精华摘要

      “目前红利赛道还谈不上‘拥挤’。”蔡丹表示,从估值水平来看,的最新PE(市盈率)和PB(市净率)分别位于历史22.84%和14.72%的分位数水平,股息率为5.32%,当前估值并不算高,相对其他宽基指数,红利类指数的估值也不高。从主流红利指数的编制规则来看,指数定期选择高股息的股票纳入组合,被动实现了高抛低吸,使成份股保持相对高股息和相对低估值的状态,从股息率上实现了优胜劣汰。从国内跟踪红利主题相关ETF的总规模来看,相对所覆盖股票市值占比并不高,同时,当前主动权益基金配置红利类资产的占比也并不高。
  • 好市多 Q1营收不及预期 净销售额同比增8%

      2016年5月,有消息称苹果开始对电动汽车充电桩感兴趣。2017年,《纽约时报》再度确认苹果停止整车开发;然后库克公开回应,称苹果正在进行无人驾驶技术方面的研发。
  • 小加索尔交易接近达成! 这次买家是乔老板

      [环球网报道]美国波音公司最近持续陷入航空安全风波。据英国广播公司(BBC)12日最新消息,波音公司一名前员工3月9日被发现在美国一家酒店停车场内身亡,事件正在调查中。报道说,这名前员工在去世前的一段日子里对波音公司的生产标准和安全问题提出担忧,他在针对波音公司的法律诉讼中充当了“吹哨人”角色。
  • 李德林:董事长快被逼疯了

      (七)出席对象:1、凡于股权登记日(2024年3月21日)下午收市时在中国证券登记结算有限责任公司深圳分公司登记在册的公司全体股东均有权出席股东大会,并可以以书面形式委托代理人出席会议和参加表决,该股东代理人不必是公司股东;2、公司董事、监事、高级管理人员;3、公司聘请的律师;4、根据相关法规应当出席股东大会的其他人员。