国产自拍👅_沈先生的花式调数-艺文笔记

王金豹 2025年11月16日 03:25:30
发布于:曼谷

国产自拍👅_沈先生的花式调数_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
92 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 投资晨报:美元痛失"王座" 白银多头有望再下一城

      掌舵人的更换从侧面印证了长安内部对阿维塔现状的不满。此前的人事变动中,董事长朱华荣亲自挂帅,担任阿维塔科技董事长,原董事长兼CEO谭本宏就此卸任。为了提升销量,管理层还主动申请调整薪酬结构,将月度收入与销量直接挂钩,并提高了浮动比例。根据透露,阿维塔计划在2024年挑战10万辆的销量目标,比原定目标多1万辆。
  • 刚连关一波店的Off

      成立于年初的Web3Labs,目标是响应香港特区政府的政策宣言,通过落地服务、投资加速、技术合作、助力合规等支持帮助全球Web3企业落地香港,目前已经在香港、新加坡、韩国、杭州、北京等地拥有线下孵化器。新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述
  • ChatGPT每天耗电超50万度,是美国普通家庭1.7万多倍

      专家认为,今年的“618”很特殊,除了往年的大促特色外,更重要的是协同品牌企业在消费下行中逆势突破,以更加低廉的促销成本投入、更加稳定的供应链服务、更加快捷的资金结算,为品牌企业解燃眉之急。
  • 宝宝一岁前,绝对不该吃的三样东西

      符合标准的美,才是行走世间可以傍身的硬通货。卡伦
  • 通信业论道AI大模型:如何赋能网络数智化转型?

      当中的绿色漩涡(StormSurge)是海上最大的激流装置,一船可坐4人;蓝色狂飙(StormChasers)则为海上首个双人组对竞速滑道。
  • 中国学者于丹在维也纳举办“汉字之美”讲座

      镜头显胖,而圆脸又恰恰是骨相、线条都不明显的类型,再加上我们亚洲人本身面部起伏小、面部折叠度低,好了上了镜可以说是非常2D,怎么p都没效果。
  • 媒体辨析民营经济促进法:“促进”并非倾斜,保障公平是核心

      社区引入7大科技创新与新技术应用,其中包括提高弧形混凝土飘带一次成型合格率、基于BIM的管线综合技术、机电消声减振综合施工技术、智慧化安全、质量管理平台的应用、封闭降水及水收集综合利用技术、施工扬尘控制技术、海绵城市、雨水收集系统、弧形幕墙施工技术,为使用者创造健康舒适的建筑空间与环境。
  • 中国梦践行者心系“中国结” 三地梦共圆

      ③家装施工交付与全国的普遍状态相比大致相同,施工交付依然是制约家装行业取得创新性发展的最大掣肘
  • 武磊立功了!右路传中制造马竞乌龙

      路易威登腕表总监JeanArnault
  • 灵活的大胖子,海南试驾江淮瑞风RF8 PHEV

      IT之家附参数如下:理想MEGA长宽高分别为5350/1965/1850mm,轴距为3300mm,可利用空间3791mm,电机峰值功率400kW,峰值扭矩542牛・米,0-100km/h加速仅5.5秒。
  • 2024年新加坡旅行攻略TIPS

      我们总是习惯性的把最心爱的人和事小心的藏好,固执的以为这样就可以永远守住美好,守住此刻绵长的喜悦,却从不知幸福与喜悦只是一种心境,它也有保鲜期。没有在最看重的时刻去做自己最想做的事,它终会偷偷流逝。光景流转,时空变换,任凭我们怎么努力追忆,最后留下的只是一声无奈的感慨,“当初,我曾经多么喜欢过它!”。
  • 邦达亚洲:美元走软避险情绪抬头 黄金收复1220关口

      新华网客户端融合发展中心副总经理、产业发展战略及媒体评审团成员李鹏亦表示,功能化、智能化、绿色化已经成为家居行业的主流发展趋势,家居行业迎来了一股强劲的政策东风和消费升级红利。家居企业则应该跟随市场和政策的风向,顺应产业聚合的趋势,借助更多平台和渠道实现高质量发展。
  • 新浪彩票双色球名家第23140期推荐汇总

      要说“凯迪拉克洗浴王”,“本田烂仔”,这种调侃车主不仅不反感,甚至还挺喜欢,将其视为车友文化。
  • 飞行汽车前景广阔 有望为新质生产力赋能“添翼”

      生为一个“不够美”的女人,你遭遇过什么?