在线看免费❗_AAAAA级大片-艺文笔记

王金豹 2026年02月05日 04:40:40
发布于:曼谷

在线看免费❗_AAAAA级大片_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

H. Put the Airplane Back to Its Usual Condition SUBTASK 27-11-41-410-001 (1) Close this access panel: Number Name/Location 112A Forward Access Door SUBTASK 27-11-41-860-003 (2) Do this task: Put the Aileron Hydraulic Systems A and B Back to the Condition Before Pressure Removal, TASK 27-11-00-860-802. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-41 Page 410 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details AILERON CONTROL WHEEL DRUM - REMOVAL/INSTALLATION 1. General A. This procedure has these tasks: (1) A removal of the aileron control wheel drum (2) An installation of the aileron control wheel drum. B. The aileron control wheel drum is referred to as the "control wheel drum" in this procedure. C. The control wheel drum is installed at the base of the captain’s control column. TASK 27-11-51-000-801 2. Aileron Control Wheel Drum Removal (Figure 401) A. References Reference Title 27-11-00-860-801 Remove Pressure from the Aileron Hydraulic Systems A and B (P/B 201) B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1585 Kit - Rigging Pins, All Systems (Part #: F70207-109, Supplier: 81205, A/P Effectivity: 737-600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Location Zones Zone Area 112 Area Forward of Nose Landing Gear Wheel Well 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 211 Flight Compartment - Left 212 Flight Compartment - Right D. Access Panels Number Name/Location 112A Forward Access Door E. Prepare for the Removal SUBTASK 27-11-51-010-001 (1) Open this access panel: Number Name/Location 112A Forward Access Door 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-51 Page 401 Oct 10/2006 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SUBTASK 27-11-51-860-001 WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEARS. WITHOUT THE DOWNLOCK PINS, THE LANDING GEARS COULD RETRACT AND CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT. (2) Do this task: Remove Pressure from the Aileron Hydraulic Systems A and B, TASK 27-11-00-860-801. SUBTASK 27-11-51-860-002 (3) Put the captain’s and first officer’s control wheels in the neutral position. SUBTASK 27-11-51-480-001 (4) Install the rig pins A/S-1 and A/S-1A, from the rig pin kit, SPL-1585, in the aileron transfer mechanism. (a) Make sure that the rig pin A/S-1 is fully in the aileron transfer mechanism. (b) Hold the rig pin A/S-1 to make sure it does not fall out. SUBTASK 27-11-51-480-002 (5) Install the rig pin A/S-15, from the rig pin kit, SPL-1585, in the aileron trim mechanism. F. Aileron Control Wheel Drum Removal SUBTASK 27-11-51-020-001 (1) Disconnect the cable ACBA [1] and cable ACBB [2] at the turnbuckles [3]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-002 (2) Disconnect the cable AA [4] and cable AB [6] at the turnbuckles [5]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-003 (3) Remove the cable guide [16] from the control wheel drum assembly [19]. (a) Remove the screws [17] from the cable guide [16]. (b) Remove the cable guide [16]. SUBTASK 27-11-51-020-004 (4) Remove the control wheel drum assembly [19]: (a) Remove the screw [35] and clamp [37] that attach the rudder pedal adjustment crank to the control wheel drum assembly [19]. (b) Remove the screws [24], [27], [39] and clamps [26], [29] and [41]. (c) Disconnect the electrical connectors [15] and [30] from the roll force transducer [18]. (d) Remove the screws [31], washers [32] and nuts [34] to remove the wiring harness [38] from bracket on the control wheel drum assembly [19]. (e) Disconnect the electrical connector [33] from the aileron transmitter. (f) Remove the nuts [14], washers [13], and bolts [12] that attach the control wheel drum assembly [19] to the airplane structure.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2

原标题:
67 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 比特币触及7.2万美元 拜登公布7.3万亿美元预算案

      (近观中国)习近平两会到团组深入谈“新”
  • 满大街的 AI 广告,是一次审美大降级吗?

      打开国家中小学智慧教育平台,在“课后服务”板块的科普教育专栏,学生们能上“科学公开课”、漫游各地科技馆。教育部基础教育司负责人介绍,完善课程设置、丰富教育资源等政策措施已逐步落地。据介绍,2022年版义务教育课程方案和课程标准中,小学科学与初中科学(或物理、化学、生物学)的总课时占比增至8%—10%。教育部还联合中科院开展“院士专家科普教育公开课”,为师生、家长提供优质线上科普教育资源。“全国科学教育暑期学校”中小学教师培训、“特色科学教师研修班”等,则有助于提升中小学教师开展科学教育的实践能力。
  • 两会9日看点:多位部长将在民生主题记者会答问

      【CNMO科技】苹果首席执行官(CEO)蒂姆·库克(TimCook)计划在未来十年内退出苹果。
  • 中国工商银行纸黄金纸白银周五亚市早盘双双上涨

      (更多报道线索,请联系本文作者罗琨:luokun@chinanews.com.cn)(中新经纬APP)
  • 刘涛晒照为王凯庆生:希望你许下的心愿都能实现

      福慧护生园临湖基地,濒临太湖,农业的面源污染是太湖水源保护的主要威胁之一。在护生园的一方小天地中,我们改变模式,尝试用生态农耕的方式,去改善生养我们的土地。保护水源,保护生态,留给后代一片好山水,留给其他生命一个赖以生存的家园。
  • 99~136㎡房源售价待定 丰台中海·永定玖里解析

      近期,黄金价格狂飙形成的“赚钱效应”也进一步促进客户调仓。李明(化名)在某地产公司任职,此前他在银行投资黄金“小试牛刀”,在去年黄金阶段性低点大概投入1万元“购金”,现在小赚3000多元。最近他正打算趁势加仓,把到期的5万元定期存款转投入“存”黄金。
  • 中国是否正在丧失出口竞争力?

      地平线投资公司(HorizonInvestments)研究主管MikeDickson表示:“我们预计美联储不会在3月份的会议上降息。鉴于最近的飙升,我们预计美联储将希望至少看到核心服务通胀出现连续三个月的下降,才会开始降息。这就意味着美联储最早在6月加息,而且如果服务业通胀保持粘性,则首次降息时间将推迟到2024年更晚些的时候。”
  • 乐视网:2019年全年亏112.8亿 去年同期亏损41亿

      新加坡打的士,一公里起步,起步价在二三十块钱左右,价格跟日本的出租车价格差不多,比深圳要贵不少。但好在新加坡不大,打的士还能接受,例如,樟宜机场打的士去了市区中心酒店,花了149元。但如果电招(包括app)的士,要比路上乘坐贵不少,电召费要加收十几二十块钱,高峰时段加收更多。
  • 京东发文回应“承兴案” 斥责诺亚财富恶意起诉

      为什么随遇而安的她能留下经典的角色,还在60岁的年纪拿下影后?何赛飞有自己的不可取代性——
  • 四年过去了,我们依然没有找到宇宙的黎明

      亚当斯基还强调了苹果公司更具争议性的核心技术费,该费用规定开发者在下载量达到100万次之后,需要为其市场应用的首次年度安装支付0.50欧元。
  • 工业富联去年营收突破5000亿 拟派现109亿 分红比例再创新高

      最近,汪小菲在直播间聊起自己的情感问题,高调宣布很爱现任女友“小梅”,并透露将在今年结婚。此事给汪小菲直播间注入的能量有限,他最近一周带货50万-75万元。
  • 十年梦碎,苹果汽车项目走向终结

      FCA表示,它不会反对认可的投资交易所的要求,即为加密支持的交易所交易票据(ETN)创建一个在英国上市的细分市场。伦敦证券交易所表示,将从今年第二季度开始接受比特币和以太坊ETN的上市申请。与ETF(持有资产的基金)不同,ETN是由银行发行的无担保债务证券。它通常与市场指数或其它基准挂钩。ETN承诺在到期时支付指数减去管理费的全部价值。
  • 突然!高盛宣布:退出!

      比亚迪的做法就很聪明,用新品牌做定位区隔,仰望定价非常高,卖得好不好是次要的,重要的是让消费者记住,比亚迪可以很贵。