在线看免费❗_草樱免费视频-艺文笔记

王金豹 2026年01月26日 07:41:12
发布于:曼谷

在线看免费❗_草樱免费视频_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

H. Put the Airplane Back to Its Usual Condition SUBTASK 27-11-41-410-001 (1) Close this access panel: Number Name/Location 112A Forward Access Door SUBTASK 27-11-41-860-003 (2) Do this task: Put the Aileron Hydraulic Systems A and B Back to the Condition Before Pressure Removal, TASK 27-11-00-860-802. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-41 Page 410 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details AILERON CONTROL WHEEL DRUM - REMOVAL/INSTALLATION 1. General A. This procedure has these tasks: (1) A removal of the aileron control wheel drum (2) An installation of the aileron control wheel drum. B. The aileron control wheel drum is referred to as the "control wheel drum" in this procedure. C. The control wheel drum is installed at the base of the captain’s control column. TASK 27-11-51-000-801 2. Aileron Control Wheel Drum Removal (Figure 401) A. References Reference Title 27-11-00-860-801 Remove Pressure from the Aileron Hydraulic Systems A and B (P/B 201) B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1585 Kit - Rigging Pins, All Systems (Part #: F70207-109, Supplier: 81205, A/P Effectivity: 737-600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Location Zones Zone Area 112 Area Forward of Nose Landing Gear Wheel Well 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 211 Flight Compartment - Left 212 Flight Compartment - Right D. Access Panels Number Name/Location 112A Forward Access Door E. Prepare for the Removal SUBTASK 27-11-51-010-001 (1) Open this access panel: Number Name/Location 112A Forward Access Door 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-51 Page 401 Oct 10/2006 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SUBTASK 27-11-51-860-001 WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEARS. WITHOUT THE DOWNLOCK PINS, THE LANDING GEARS COULD RETRACT AND CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT. (2) Do this task: Remove Pressure from the Aileron Hydraulic Systems A and B, TASK 27-11-00-860-801. SUBTASK 27-11-51-860-002 (3) Put the captain’s and first officer’s control wheels in the neutral position. SUBTASK 27-11-51-480-001 (4) Install the rig pins A/S-1 and A/S-1A, from the rig pin kit, SPL-1585, in the aileron transfer mechanism. (a) Make sure that the rig pin A/S-1 is fully in the aileron transfer mechanism. (b) Hold the rig pin A/S-1 to make sure it does not fall out. SUBTASK 27-11-51-480-002 (5) Install the rig pin A/S-15, from the rig pin kit, SPL-1585, in the aileron trim mechanism. F. Aileron Control Wheel Drum Removal SUBTASK 27-11-51-020-001 (1) Disconnect the cable ACBA [1] and cable ACBB [2] at the turnbuckles [3]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-002 (2) Disconnect the cable AA [4] and cable AB [6] at the turnbuckles [5]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-003 (3) Remove the cable guide [16] from the control wheel drum assembly [19]. (a) Remove the screws [17] from the cable guide [16]. (b) Remove the cable guide [16]. SUBTASK 27-11-51-020-004 (4) Remove the control wheel drum assembly [19]: (a) Remove the screw [35] and clamp [37] that attach the rudder pedal adjustment crank to the control wheel drum assembly [19]. (b) Remove the screws [24], [27], [39] and clamps [26], [29] and [41]. (c) Disconnect the electrical connectors [15] and [30] from the roll force transducer [18]. (d) Remove the screws [31], washers [32] and nuts [34] to remove the wiring harness [38] from bracket on the control wheel drum assembly [19]. (e) Disconnect the electrical connector [33] from the aileron transmitter. (f) Remove the nuts [14], washers [13], and bolts [12] that attach the control wheel drum assembly [19] to the airplane structure.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2

原标题:
99 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 问题探花秀2年合同签鹈鹕!内线四大天王凑齐了

      风云T6有经济模式、标准模式和运动模式三种驾驶模式可选,区别在于动力响应速度快慢和能耗管理策略的不同。动能回收部分,车子可以选择三种回收力度,但三种力度之间的差异没有那么巨大,即使切换到最强的力度也给不了你想象的那种进召之即来的单踏板状态,驾驶轻松,才是它想要的东西。
  • 中国政策刺激有多大空间?

      为引导行业良性发展,为正确引导消费者选择,为加强行业市场教育,新浪家居联合金堂奖重磅推出「2022设计师严选品牌TOP10」活动,以行业创新发展为基础,以专业设计师角度为准则,以网络票选为形式,最终形成客观、真实的「2022设计师严选品牌TOP10」榜单。
  • 在探索中前进:AI大模型为电信网络数智化变革增添强劲动力

      活动全程与消费者深度互动,尊重行业专家的意见,内容触点下沉到企业的生产线和实验室,力求公正、透明、详实的向公众展现参调品牌的完整风貌,用丰富的、具有自传播价值的内容,呈现出中国家居人通过“中国创造”、“中国质量”和“中国品牌”为美好幸福生活所做出的努力。标签:
  • 如何看待当前中国引资态势和未来前景?

      北青报记者在另外一家名为“门徒求职”的平台上,发现其推出了“保证获取实习0FFER(录用)”的门徒计划,自称这一计划是“精心打造的高端私人订制”项目。这一项目针对简历做职位匹配,锁定目标职位,无论远程、现场、正式、全职,无论投行、公募基金、外资咨询的职位统统都有,还很“大气”地宣称“意外失败,全额退款”。至于价格是单一岗位单一定价,价格不等。有联系过该平台求职顾问的人士透露,该平台针对不同公司、不同岗位的报价在2万至6万元不等。
  • 大豆豆粕库存双双下降

      新元知浪是一家以沉浸式虚拟空间制作及全链路数字活动营销为主营业务的企业,依托团队在引擎开发、云计算、人工智能等领域的技术积累,打造出以用户体验为核心,多场景、强互动的元宇宙内容开放平台,促进面向用户的数字活动传播,提升客户品牌营销声量。新元知浪CEO杨振
  • OpenAI在法庭文件中反击:称马斯克无理取闹,担忧他趁机窃密

      据犯罪嫌疑人董苏交代,她确实于2014年在美发店打工时认识了静静,而贾辉正是美发店里的发型师。
  • 2018年熊猫金套币价格今天多少一克(2018年11月07日)

      3月11日,受多重因素提振,A股继续上行,新能源板块单日大涨6.16%,医药等板块涨幅居前,上证指数刷新年内新高,创业板大涨4.6%,市场成交额再度超万亿元。
  • 刚连关一波店的Off

      报道说,上周,巴奈特发表了一份接受波音公司律师质询的证词,他本应于上周六(即3月9日)接受进一步讯问,但他当天没有露面。有人到他住的酒店询问,随后发现巴奈特死在他在酒店停车场的车里。
  • 宠物过世后如何帮助它

      所谓的“男友”究竟是谁?
  • 金店报价逼近670元,黄金涨势难止步

      3月8日晚间,药明康德公告称,拟继续以集中竞价交易方式回购A股股票,用于维护公司价值及股东权益,本次回购的股份将在回购完成之后全部予以注销并减少注册资本。拟回购资金总额为10亿元,回购股份价格不超过83.33元/股(含)。
  • 期指多头信心不足 指数重心回落仍是主基调

      公牛方面,德罗赞13分,武切维奇13分6篮板,科比-怀特12分,菲利普斯11分3篮板,比蒂姆17分6篮板。
  • 重返中国一年后,FOREVER 21盯紧县级市市场

      《报告书》还列出了各平台车型的主要参数。资料显示,基于X6平台的产品规划目前仅有一款MPV,规划年产能3.5万辆。详细参数方面,该车车长5200mm,轴距3200mm。项目计划2024年开工,2025年竣工。