天堂岛精品🔇_聂小雨一战三视频精彩回顾-艺文笔记

王金豹 2026年01月26日 01:51:33
发布于:曼谷

天堂岛精品🔇_聂小雨一战三视频精彩回顾_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R 1EFF : 159-199, 211-212, 1 27-54-55Page 451 1 1 Aug 01/05 1 1 1CES 1

R  (k) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin  R  (37) in an applicable position on the bearing housing (34).  R  Remove all unwanted material from the area.  R  (l) Safety the ring nut (40) with a new cotter-pin (37).  R  (m) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces  R  of the lever (28).  R  (n) Turn the lever (28) through 90 deg. and install it in the bearing  R  housing (34).  R  (o) Install the bearing housing (26), the bolt (25) and the nut (44).  R  (p) Apply COMMON GREASE (Material No. 04-022) to the retention plate  R  (35) and to the bolt (27).  R  (q) Install the retention plate (35), the bolt (27) and the nut (39).  R  (r) TORQUE the nut (39) to between 1.4 and 1.5 m.daN (10.32 and 11.06  R  lbf.ft).  R  (s) Manually operate the lever (28) and make sure that it moves  R  freely.  R  (t) Safety the nut (39) with the new cotter pin (38).  R  (u) Remove the adjustable strut.  R  (2) At the track 1 position:  R  (Ref. Fig. 401B/TASK 27-54-55-991-001-C)  R  (a) Connect the lever (10) to the flap link arm (5) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)_  R  and the nut (8).  R  (b) Install the bolt (6), the washer (7) and the nut (8).  R  (3) At the track 2 position:  R  (a) Connect the lever (28) to the flap link arm (32) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)_  R  and to the nut (31).  R  2 Install the bolt (33), the washer (29) and the nut (31)._ 

R 1EFF : 159-199, 211-212, 1 27-54-55Page 452 1 1 Aug 01/05 1 1 1CES 1

R  (4) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).  R  (5) At the track 1 position:  R R  (a) TORQUE the nut (8) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter pin (9).  R  (6) At the track 2 position:  R R  (a) TORQUE the nut (31) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter-pin (30).  R  (7) At tracks 1 and 2:  R R  (a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6) and (33) and the nuts (8) and (31) after assembly.  R R  (8) Install the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-54-49-400-002).  R R R  (9) Remove the locking tools LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT from the torque shaft outboard of the track 2 actuator (Ref. TASK 27-50-00-000-003).  R  (10) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).  **ON A/C 301-399,  Subtask 27-54-55-420-053-B  B. Installation of the Flap-Actuator Lever Assembly - Track 1  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED. 

R 1EFF : 159-199, 211-212, 301-399, 1 27-54-55Page 453 1 1 Aug 01/05 1 1 1CES 1

 (1)  At the track 1 position: R (Ref. Fig. 401C/TASK 27-54-55-991-001-B)

 (a)  Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of the actuator lever (11).

 (b)  Install the actuator lever (11) into the No.1 flap track beam.

 (c)  Apply COMMON GREASE (Material No. 04-022)to the bearing surfaces of the bearing housing (1).

 (d)  Put the bearing housing (1) in position on the flap track beam.

 (e)  Put the two washers (4) on the two bolts (5). Install the two bolts (5), the two washers (13) and the two nuts (12).

 (f)  Put the five washers (2) on the five bolts (3). Install the five bolts (3), the five washers (15) and the five nuts (14).

 (g)  TORQUE the two nuts (12) to between 2.2 and 2.6 m.daN (16.22 and

 19.17 lbf.ft).  (h)  TORQUE the five nuts (14) to between 1.3 and 1.4 m.daN (115.04 and 123.89 lbf.in).

 (i)  Remove the adjustable strut.

 (j)  Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (7) and the nut (9).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵6

原标题:
93 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 王永利:穿透货币本质 把好总量闸门

      浙江省兴合集团有限责任公司:完成发行6亿元“24浙兴合MTN001”
  • 本轮钱荒在短期对股市有冲击

      2017年,金龙鱼商品衍生金融工具投资收益达28亿元、投资收益总计达34.76亿元,当年净利因此飙升至52.8亿元,投资收益占净利润的比重达65.78%。主要原因是,2017年CBOT大豆合约价格总体呈现下降趋势,公司为套保进行的期货交易收益较大。
  • 解读政府工作报告中稳健的货币政策等10大要点

      沉浸式体验,感受非遗的人文传承
  • 北汽蓝谷能否借势华为打一场“翻身仗”?

      《Demeo》——19.99美元(50%折扣)
  • 印光法师:修行以念佛为稳当

      园区内有24小时紧急呼叫系统,一经触发,医生、护士、管家会第一时间到达现场。同时,社区还在公共区域配备5台AED自动体外除颤器,并定期组织全员接受心肺复苏及AED使用流程培训。
  • 比特币狂热买家MicroStrategy再出手:未来将比黄金更有价值!

      “近期多个细分概念板块相继轮番表现。”中欧基金认为,在目前的经济环境下,市场正在从中小市值估值溢价向大市值估值溢价,这可能是近期市场估值体系重塑的底层逻辑。估值逻辑切换意味着市场“二八行情”将持续,仅少数上市公司股价可以实现正收益。高股息率的大市值头部公司的资产质量更高,理应在新估值体系下享受更高的溢价。此外,短期的反弹节奏可能偏弱,市场的情绪两极分化并存。
  • 交易员预计日本央行可能缩减购债规模

      网传招商证券深度报告内容
  • 3月11日操盘必读:影响股市利好或利空消息

      3月11日,A股放量上涨,超4400家公司红盘报收,宁德时代放量大涨14.46%,对整个新能源板块起到极大的提振,锂电、储能、光伏等相关板块大幅拉升。北上资金大幅净买入超100亿元,今年累计净买入额接近500亿元。
  • 一个月涨超40%!万亿级新赛道开启

      从2023年年初起,药明康德就频遭股东减持套现。自2023年1月13日以来,药明康德已发布五次公告,宣布公司实控人的减持计划,截至10月已套现约100.07亿元。
  • 不良债转股很难大范围铺开

      玫瑰金Monogram花卉金箔点缀的龙鳞在黑色珐琅映衬下熠熠生辉,而更大尺寸的玫瑰金Monogram花卉图案则用于表盘装饰。镶嵌着红玉髓图徽的GLV字母,即Gaston-LouisVuitton先生名字的缩写;为呼应它,龙的眼珠为一颗糖包山型切割红宝石。龙眼被黄金眼睑巧妙地固定,散发神秘亮红色光芒。
  • 以色列“狠虐” 叙利亚 纸黄金坐而待曙

      居住在天津乐境的长者俞维美阿姨告诉我们,天津乐境在刚开始运营时,入住长者比较少,大家吃的也很好。后来随着人越来越多,大家对食堂的口味、品种等方面的不同需求也就比较多。而得益于园区的座谈会制度,食堂协调和接受不同长者的意见反馈后,做得越来越好。
  • 今年银行贷款增速仍将强劲

      最后唠叨下空间,其实完全不用操心,这车现在长大了两圈,后排座位的空间甚至比同平台的BMWX2还要宽裕,不过它仍旧是台MINI,我认为乘坐五个人还是有点勉为其难了,四个人是比较恰当的选择。后备箱地板下也跟X2一样拥有一个巨大的暗格,可以放平时不用常用的装备,官方给到的数据是行李厢容积可以从460升扩展至1530升,而这个隔板存在的另一层意义是它可以让二排座椅放倒后获得一个纯平的后部空间,让看星星、露营什么的都不在话下。
  • 古刹灵隐寺七叶树花开

      Picvia:andu.c/adidasoriginals/casetify
  • 2039年中国GDP完全可能超过美国

      “事实上AI大模型产业还处在一个很初级的阶段,创造的内容、解决的问题还相对比较初级。”初心资本合伙人李可佳向刺猬公社表示。