国内精品♨️_糖心vlog破解版4 . 3 . 1-艺文笔记

王金豹 2026年01月20日 01:52:23
发布于:曼谷

国内精品♨️_糖心vlog破解版4 . 3 . 1_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific blanking plugs  No specific circuit breaker(s) safety clip(s)  No specific platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action  52-41-00-010-001 Open the APU Doors for Access  49-51-13-991-001 Fig. 401

 3. Job Set-up __________ Subtask 49-51-13-860-050  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network (Ref. TASK 24-41-00-861-002).

 (2)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)  Put the warning notices on panel 25VU to tell persons not to start the APU.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-51-13-865-050  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-51-13-010-050  C. Get Access  (1)  Put the platform below the APU access doors.

 (2)  Open the APU access doors 315AL, 316AR and safety them in the open position (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________  (Ref. Fig. 401/TASK 49-51-13-991-001) Subtask 49-51-13-020-050  A. Removal of the Pneumatic Sensor Assy  (1)  Disconnection of the electrical connectors (15) and (17).

 (a)  Disconnect the electrical connectors (15) and (17) from the total pressure transducer and differential pressure transducer.

 (b)  Put blanking caps on the disconnected electrical connectors.

 (2)  Disconnect the tube (13) from the static sensor assy (11).

 (a)  Remove and discard the lockwire from the bolt (3).

 (b)  Remove the bolt (3), the washer (2) and the retainer (1) from the static sensor assy (11).

 (c)  Move the hose (13) away from the static sensor assy (11).

 (d)  Remove and discard the packing (12).

 (e)  Put blanking plugs on the disconnected hose end.

 (3)  Disconnect the pneumatic sensor assy (14) from the bleed duct

 (a)  Remove the bolt (4) from the bracket assy (9).

 (b)  Remove the bolts (6) NOTE : After the removel of the bolts (6) the flow sensor (7) is

____ only kept in position through the tubes (5) and (8).

 (c)  Remove the bolt (10) connecting the bracket assy (9) to the bleed duct.

 NOTE : Prevent a uncontrolled movement of the pneumatic sensor ____ assy (14) after the removal of the bolt (10).  (4)  Remove the pneumatic sensor assy (14).

 (5)  Remove and discard the gasket (16).

 Pneumatic Sensor Assy Figure 401/TASK 49-51-13-991-001  R  EFF :  001-003, 051-099, 401-499,  49-51-13 Page 404 Aug 01/05  CES 

 TASK 49-51-13-400-001  Installation of the Pneumatic Sensor Assy (GTCP 36-300)

 1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific  Torque Wrench : range 0.00 to 1.20 m.daN  (0.00 to 9.00 lbf.ft)  B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5

原标题:
40 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 中美科技实力对比:体制视角

      很多时候要知晓,突然冷落你的人,一定跟另一个人有关系,他在冷落你的同时,或许正在捂热别人,这就是残酷的现实。
  • 第五堂课 如何交易美股

      此次联演以“共创和平与安全”为主题,于3月11日至15日位阿曼湾附近组织实施,旨在共同维护地区海上安全。联演以反海盗、搜救为主要内容,分为港岸对接、海上演习、总结闭幕三个阶段,有助于加强参演国家海军之间交流合作,共同构建“海洋命运共同体”。中方参演兵力为第45批护航编队导弹驱逐舰乌鲁木齐舰、导弹护卫舰临沂舰和综合补给舰东平湖舰。
  • LIV高尔夫香港站安瑟加洞赛夺冠 团队压榨队连胜

      如今长安的最新战略规划则是,到2030年将实现集团销售500万辆,其中长安品牌400万辆,新能源汽车销售占比60%以上。为实现目标,共布局了长安启源、深蓝、阿维塔三大智能电动品牌,打造出大、中、小三个纯电专属平台。
  • 刘文松的成吉思汗大测试 王德康赵君面临苦斗

      在何赛飞看来,这正是原著小说作者艾伟的成功之处,塑造了如此特殊和不常见的女性,在她的身上赋予很复杂的戏剧性,在和导演的多次前期沟通中,何赛飞逐渐去读懂和理解这个人物。
  • Together AI 获得 7.3 亿人民币 A 轮投资,英伟达参投

      所以,不要一味去羡慕别人拥有了500亿的身家,也要看到守护巨额财产的艰辛。
  • 等一手骨折!《怪物猎人:崛起》Steam国区二度降价

      芭蕾舞鞋也是去年不可忽视的重要趋势之一,由此衍生出的Balletcore一词更是在Tiktok上有拥有超过1亿的浏览量。KikoKostadinov
  • 新能源销量反超特斯拉,不“芯慌”的比亚迪能否高枕无忧

      年初,我88岁的外婆去世了,这成为了我永远的遗憾。每一年春暖花开的时节,我总想趁工作之余,牵起她颤抖得厉害的手,带她穿过青苔丛生的石板路,走出那个古旧的巷口,带她走出那间吱嘎作响的阁楼,去我生活的城市,看看绚丽闪烁的七彩霓虹,站在高高的写字楼里看看高架桥上飞动的流萤一般来往的汽车,抑或者去城市最边缘的海滩,看看那白浪拍打的沙滩和海尽头看不到边的天际线。
  • 马斯克两位堂兄弟入职推特,成全职员工

      (八)现场会议召开地点:公司会议室(重庆市两江新区龙韵路1号1幢金科中心27楼)
  • 我军最强机型同时部署东海方向 歼20歼16数量超60架

      总体看,中国餐饮连锁产业还处于初级阶段,可提升空间较大。据《2023中国餐饮加盟行业白皮书》显示,2022年中国的餐饮连锁化率仅为19%,但仍远低于美国54%的水平。对品牌方而言,仰望星空的同时,更要脚踏实地,毕竟因加盟而翻车的前车之鉴不少。
  • 2023艺体化年终盛典 为体教融合继续添砖加瓦

      中国是个人情社会,一个经销商能够独霸某一个区域内的生意往来,除了拥有超强的个人能力和商业手腕之外,在当地一定也有稳定的政商关系。
  • 白百何三里屯与友约饭 开心仰头大笑心情超好

      但是跟小店经营的奶茶店相比,“更重”的火锅店生意风险系数更高,近年来加盟暴雷的事儿一茬接一茬。无论是曾经风光无限的“中华火锅第一股”的小肥羊,还是近年来陈赫的贤合庄、薛之谦的上上谦,靠加盟疯狂跑马圈地后,因经营、管理不善,最后落得一地鸡毛,被加盟商集体维权。
  • 控不住的人口:北京上海人口增长仍有较大潜力

      然而截至目前,高合除了运送一批自家产品到长安汽车试驾体验外,再无其他公开接触对象。并且,长安董事长朱华荣也公开回应收购高合的传闻“离谈妥还远”。丁磊的续命之路碰上前东家的落井下石,还连累长安股价在接洽消息放出当日大跌,市值蒸发90亿左右。对于高合这种争议缠身的造车新势力,长安汽车又为什么想要碰一碰这个烫手山芋?