糖心logo官网✅_囯产无码AV在线🥥-艺文笔记

王金豹 2026年01月26日 08:17:10
发布于:曼谷

糖心logo官网✅_囯产无码AV在线🥥_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

H. Put the Airplane Back to Its Usual Condition SUBTASK 27-11-41-410-001 (1) Close this access panel: Number Name/Location 112A Forward Access Door SUBTASK 27-11-41-860-003 (2) Do this task: Put the Aileron Hydraulic Systems A and B Back to the Condition Before Pressure Removal, TASK 27-11-00-860-802. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-41 Page 410 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details AILERON CONTROL WHEEL DRUM - REMOVAL/INSTALLATION 1. General A. This procedure has these tasks: (1) A removal of the aileron control wheel drum (2) An installation of the aileron control wheel drum. B. The aileron control wheel drum is referred to as the "control wheel drum" in this procedure. C. The control wheel drum is installed at the base of the captain’s control column. TASK 27-11-51-000-801 2. Aileron Control Wheel Drum Removal (Figure 401) A. References Reference Title 27-11-00-860-801 Remove Pressure from the Aileron Hydraulic Systems A and B (P/B 201) B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1585 Kit - Rigging Pins, All Systems (Part #: F70207-109, Supplier: 81205, A/P Effectivity: 737-600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Location Zones Zone Area 112 Area Forward of Nose Landing Gear Wheel Well 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 211 Flight Compartment - Left 212 Flight Compartment - Right D. Access Panels Number Name/Location 112A Forward Access Door E. Prepare for the Removal SUBTASK 27-11-51-010-001 (1) Open this access panel: Number Name/Location 112A Forward Access Door 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-51 Page 401 Oct 10/2006 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SUBTASK 27-11-51-860-001 WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEARS. WITHOUT THE DOWNLOCK PINS, THE LANDING GEARS COULD RETRACT AND CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT. (2) Do this task: Remove Pressure from the Aileron Hydraulic Systems A and B, TASK 27-11-00-860-801. SUBTASK 27-11-51-860-002 (3) Put the captain’s and first officer’s control wheels in the neutral position. SUBTASK 27-11-51-480-001 (4) Install the rig pins A/S-1 and A/S-1A, from the rig pin kit, SPL-1585, in the aileron transfer mechanism. (a) Make sure that the rig pin A/S-1 is fully in the aileron transfer mechanism. (b) Hold the rig pin A/S-1 to make sure it does not fall out. SUBTASK 27-11-51-480-002 (5) Install the rig pin A/S-15, from the rig pin kit, SPL-1585, in the aileron trim mechanism. F. Aileron Control Wheel Drum Removal SUBTASK 27-11-51-020-001 (1) Disconnect the cable ACBA [1] and cable ACBB [2] at the turnbuckles [3]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-002 (2) Disconnect the cable AA [4] and cable AB [6] at the turnbuckles [5]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-003 (3) Remove the cable guide [16] from the control wheel drum assembly [19]. (a) Remove the screws [17] from the cable guide [16]. (b) Remove the cable guide [16]. SUBTASK 27-11-51-020-004 (4) Remove the control wheel drum assembly [19]: (a) Remove the screw [35] and clamp [37] that attach the rudder pedal adjustment crank to the control wheel drum assembly [19]. (b) Remove the screws [24], [27], [39] and clamps [26], [29] and [41]. (c) Disconnect the electrical connectors [15] and [30] from the roll force transducer [18]. (d) Remove the screws [31], washers [32] and nuts [34] to remove the wiring harness [38] from bracket on the control wheel drum assembly [19]. (e) Disconnect the electrical connector [33] from the aileron transmitter. (f) Remove the nuts [14], washers [13], and bolts [12] that attach the control wheel drum assembly [19] to the airplane structure.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2

原标题:
34 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 任泽平:重点关注雄安四大机会主线

      《仙剑奇侠传》李逍遥vs灵儿/林月如;《神话》易小川vs玉漱/素素/吕雉;《繁花》宝总vs玲子/汪小姐/李李。
  • 黄金出现买入信号,第一目标见1208.32

      某银行工作人员介绍,这些产品高利率持续的时间一般只有1个月至3个月,活动期结束或下调利率。
  • 缅北传来一个好消息

      央视网产业发展事业群总监、产业发展战略及媒体评审团成员马桦认为,在媒体融合的浪潮中,央媒希望更多介入到产业中去,而家居产业的发展和我们每一个人都密切相关。央视网希望通过“报道+政务服务商务”的模式,发挥媒体的能动性,以桥梁的身份链接消费者和企业,消除消费升级和产业升级中的消费认知鸿沟。
  • 历次股灾各国和地区怎么救市的

      3月11日,国家金融监督管理总局局长李云泽在十四届全国人大二次会议第三场“部长通道”集中采访活动中回答记者提问时表示,正在研究降低乘用车贷款首付比,同时进一步优化新能源车险的定价机制。
  • 收盘:美股收高标普指数再创新高 鲍威尔继续释放降息讯号

      当然,不是所有网文作者都能像季越人那样,一书成名。年入百万的网文大神,可能只占2%的比例。有些作者一年码字200万左右,最后收入只有4-6万元,写130万字,收入1万多。有些作者无法成为起点中文网、番茄小说、七猫小说等网文平台的签约作者,每写一篇小说,被第三方以千字几元几十元的价格买断,1万字的短篇小说最后到手几十到几百元。
  • 加价数万 一机难求:折叠机是未来趋势还是小众需求?

      民法典系统整合了新中国成立70多年来长期实践形成的民事法律规范,汲取了中华民族5000多年优秀法律文化,借鉴了人类法治文明建设有益成果,是一部体现我国社会主义性质、符合人民利益和愿望、顺应时代发展要求的法典。民法典的颁布实施,积极回应了新时代人民群众法治需求,全面加强了对公民人身权、财产权、人格权的保护,充分体现了我们党增进人民福祉、维护最广大人民根本利益的不变初心。
  • 祥龙献瑞,吉祥锦鲤,高级制表开始打祥瑞牌?

      江西省交通投资集团有限责任公司公告称,公司于3月8日完成发行“24江西交投SCP002”,债券期限为179天期,票面利率为2%,实际发行规模为15亿元。Wind数据显示,江西省交通投资集团有限责任公司最新主体信用评级为AAA,主体评级展望为稳定。
  • 白糖商品报价动态(2024

      时代财经发现,近一年以来,北京、杭州、深圳、佛山、海口等各地确有不少小区发出快递柜撤场通知,涉及菜鸟智能柜、丰巢、速递易等品牌。
  • 通州宋庄新盘案名曝光:建投国贸·瑨上 低密洋房社区

      Chloé:新创意总监带回熟悉的Chloé
  • 稳增长推动的经济回升已结束

      据介绍,本赛季评议工作采用评议成员集体讨论和单独发表意见相结合的形式,体现“评”与“议”相结合。本期评议共3个判例,受到较高关注的判例是中超第二轮浙江队对阵上海海港队的比赛第十分钟,上海海港队点球被取消。评议结果为:“经VAR介入,裁判员改判上海海港队在进攻发起阶段之初犯规在先并取消点球正确,临场的最终判罚正确。”
  • 【图解】新质生产力概念热议,17.8亿资金追高工业富联

      以下是澎湃新闻与刘希娅的对话:
  • 原生家庭的“烂牌”,如何才能不传递给孩子?

      网文作者千千万,焦虑的方式各有各的不同。卡文、是否有收入、能否爆火,这些都能牵动作者的情绪起伏,也决定着网文作者能走多远。
  • AETOS艾拓思:FED加息预期下降 非美货币温和震荡

      8、项目审批及备案情况:项目尚需国家相关主管部门(发改、商务、外管等)的审批或备案。