国产自拍👅_草b-艺文笔记

王金豹 2026年01月30日 06:26:24
发布于:曼谷

国产自拍👅_草b_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (Ref. Fig. 401/TASK 71-22-11-991-300) Subtask 71-22-11-020-051  A. Removal of the Aft Engine Mount. NOTE : Removal of the hardware that attach the aft engine mount to the ____  engine is the same at the three engine flanges.

 (1) Remove the retaining pin (5) from the bolt (15).

 (2) Remove the bolts (30), washers (35), (50). and nuts (55) that attach the retainers (60) and (70) to bracket (40).

 (3) Remove the retainers (60) and (70) from engine.

 (4) Remove the spanner nuts (65) and (75) from the bolt (10) and the pin (15).

 (5) Remove the bolt (10) from the pin (15).

 (6) Remove the pin (15), and the brackets (20) and (40) from the engine flange.

 (7) Disengage the link assemblies from the engine flanges and remove the engine mount (85) from the engine.

 (8) Remove the bushing (25), (45), and the shoulder bushing (80) from the engine flanges.

 Subtask 71-22-11-480-052  B. Installation of the AFT ENGINE MOUNT ANTI GOUGE SPLINTS.  (1) Put the top slint assemblies (larger) on the outside of the aft engine mount links.  NOTE : The end of the splint assembly marked TOP must touch the beam ____ assembly. The other end marked BOTTOM must touch the links.  (2) Put the bottom splint (smaller) on the inside of the aft engine mount links.  F 『 EEFF : ALL E Page 40271-22-11  E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 Aft Engine Mount  Figure 401/TASK 71-22-11-991-300

 F 『 EEFF : ALL E Page 40371-22-11  E E Feb 01/98 E E ECES E

 F  『  E  C F M  E  E  E  E  56-5B  E  E  E

 (3) Attach the SPLINT - ENGINE MOUNT AFT (RSE1224) to the engine mount two places with TY WRAP.  (a) Wind the TY WRAP around the splints and the aft mount where the splint touches the beam assembly.

 (b) Wind the TY WRAP around the splints and the aft mount where the splint touches the link.

 (c) Make sure that the TY WRAP is wound very tight and that the splints can not move.

 F 『 EEFF : ALL E Page 40471-22-11  E E Feb 01/98 E E ECES E

 F 『  E C F M E  E E  E 56-5B E  E E

 TASK 71-22-11-400-041  Installation of the Aft Engine Mount  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  ------------------------------------------------------------------------------- REFERENCE  QTY DESIGNATION  ------------------------------------------------------------------------------- No specific  Torque Wrench : range 8.00 to 75.00 lbf.ft  (1.00 to 10.00 m.daN)  No specific Torque Wrench : range 15.00 to 150.00 lbf.ft

 (2.00 to 20.00 m.daN) R No specific Torque Wrench : range 5.00 to 35.00 lbf.in R (0.05 to 0.40 m.daN)  RSE1098 1 WRENCH SET - AFT ENGINE MOUNT  RSE1224 2 SPLINT - ENGINE MOUNT AFT

 B. Consumable Materials  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- Material No. CP5063  *  Silicone Lubricant (Ref. 70-30-00)

 C. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 71-00-00-000-042 Removal of the Power Plant 71-00-00-400-042 Installation of the Power Plant 71-22-11-991-300 Fig. 401  F 『 EEFF : ALL E Page 40571-22-11  E E May 01/05 E E ECES E

 F  『  E  C F M  E  E  E

 3. Job Set-up __________  Subtask 71-22-11-860-050

 A. Make sure that the engine is removed (Ref. TASK 71-00-00-000-042)  Subtask 71-22-11-080-052

 B. Remove the SPLINT - ENGINE MOUNT AFT (RSE1224) from the aft engine mount.  4. Procedure _________  (Ref. Fig. 401/TASK 71-22-11-991-300)  Subtask 71-22-11-420-051

 A. Installation of the Aft Engine Mount. CAUTION : INSTALL THE BUSHING (80) WITH ITS SHOULDER AT THE INTERIOR OF _______  THE ENGINE RANGE.

 NOTE : Installation of the hardware that attach the aft engine mount to   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2

原标题:
51 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美国防长:美国已做好和伊朗打完任何战争的准备

      不过,这样的好日子没能持续下去。国家层面对保健品的监管趋严,束缚了碧生源的手脚;同时,各种减肥茶产品层出不穷,也在不断蚕食它的市场。
  • 任泽平:货币政策边际改善 年内有望再次降准

      这组广告真实存在,出自深圳地铁,官方盖章由AI创作,他们还有一组广告主打运动风,同样由可爱的卡通人物们代言,其中一个小男孩的自行车没有坐垫,尽管他面色轻松,但局部的身体状况很让人担心。
  • 地铁十一号线新进展 广州火车站下月起围蔽施工五年

      注册地址:浙江省杭州市余杭区五常街道文一西路969号3幢5层599室
  • 管涛:全国两会之后又将是预期兑现期

      由于需要交高昂的场租、电费以及固定资产的一次性投入和维护费用等,此前丰巢、速递易等快递柜公司便没能实现盈利。
  • 佟丽娅回应baby生日祝福 调侃其是抓拍小能手

      境外市场业绩不错,一定程度上反映了药明康德全球市场竞争力,但是,全球形势日趋复杂的背景下,高度依赖境外市场,风险较大。
  • 王永利:央行外汇储备与外汇占款为何走向分离

      金龙鱼解释道,营业收入略有下降,主要是因为产品价格下跌的影响超过了销量增长带来的营收贡献。随着国内经济逐步恢复,公司厨房食品、饲料原料和油脂科技产品的销量较去年增长较好,但是主要产品的价格随着大豆、大豆油及棕榈油等主要原材料价格下跌有所回落。
  • 女排土耳其杯萨勒耶尔0

      蒋先生说,珠宝店柜台的玻璃都砸碎了,里面都是金项链什么的,然后他就拿起来往身上放,“不知道是戴在身上还是往包里放,我们也不敢靠近。”
  • 天台祖师智者大师(图)

      11月初,凯特·迪卡米洛的“暖心小说系列”中文版上市,这是一套适合7—10岁儿童阅读的小说,共六本,讲述了六个天马行空的人生奇遇故事,带孩子们进入一场发现自我的心灵之旅。在作者笔下,一个幻想当牛仔的男人,爱上了一匹只剩四颗牙齿的老马;超级害怕鳄鱼和黑洞的小男孩,因为一把神秘钥匙解开了心结;一位只听姐姐话的天真老奶奶,在旅途中尝到了从来没吃过的糖果……故事中,一个个暖心之举,让烦恼的大人和孩子都获得了奇妙的安慰。基于对人性、童心的深刻感悟,作者以大胆的想象、风趣的语言和充满诗意的笔触,清晰勾勒出各个角色的心灵轨迹,引领读者踏上满含爱意的温暖旅程。
  • 力挺TikTok?特朗普:Facebook才是美国人的敌人

      上市公司注销式回购正迎来新一轮高潮。
  • 四年级小学生的双11购物清单:看完好心疼她爸爸!

      在品读会中,徐美玲老师分享了她对凯特·迪卡米洛著作的阅读心得。她认为这套“暖心小说”轻松但不浅薄,深刻而不沉重。比如《非去不可的旅行》这个故事,很幽默,不少情节甚至有点儿滑稽,但是传递了遵从自我内心的观点。艺术总在有意或无意中透露、传递着价值观,但人们在讲道理时很难不摆出一副严肃的苦瓜脸,这就可能导致拒人于千里之外。讲好深刻的哲理,还能打动人心,这正是迪卡米洛的天赋和功力。她的作品总能够把握好难度、拿捏住分寸,让孩子们在欢笑和眼泪中领悟较为深刻的价值。
  • 任泽平:中国未来2亿新增城镇人口去向何方?

      今天,我们想踏着时间回溯,尝试揭开苹果汽车死亡背后原因。
  • 电子城高管接连辞职 信用销售增长 增收不增利究竟为何?

      自2024年2月27日至2024年3月11日,公司股票已有十个交易日收盘价格低于当期转股价格的85%。若未来连续二十个交易日内有五个交易日公司股票收盘价格继续低于当期转股价格的85%,将可能触发“晶能转债”的转股价格修正条款。