在线看免费❗_芋圆呀呀白麻酥酥私人订制-艺文笔记

王金豹 2026年02月04日 23:03:08
发布于:曼谷

在线看免费❗_芋圆呀呀白麻酥酥私人订制_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 ELECTRICAL CLOCK - FAULT ISOLATION PROCEDURES _____________________________________________  TASK 31-21-00-810-801  Failure of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)  2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS)  AMM 31-21-21-400-001 Installation of the Clock (2FS)  AMM 31-32-00-740-003 Ground Scanning of the CFDIU

 3. Fault Confirmation __________________  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU CLOCK/NORM/SPLY 6FS F11  **ON A/C 001-049, 051-061, 101-105, 201-203,  121VU CLOCK/STBY/SPLY 4FS N03 R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,  121VU CLOCK/STBY/SPLY 4FS N02 **ON A/C ALL  B. Test Do the ground scanning of the CFDIU (Ref. AMM TASK 31-32-00-740-003).  4. Fault Isolation _______________  A. If the test gives the maintenance message CLOCK:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 201  Aug 01/05 CES

 B. Do the test given in Para. 3.B.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 202  Feb 01/00R  CES  Failure of the Power Supply of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)

 - C/B CLOCK/NORM/SPLY (6FS)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS) AMM 31-21-21-400-001 Installation of the Clock (2FS) ASM 31-21/01  3. Fault Confirmation __________________  A. Test  Not applicable, the fault is evident.

 4. Fault Isolation _______________  A. When the displays go off:  - do a check of the status of the circuit breaker (6FS).  (1) If the circuit breaker (6FS) is closed:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  (a) If the fault continues:  - do a check of the wiring from the clock (2FS) pin A/V to the circuit breaker (6FS) , (Ref. ASM 31-21/01).  1 If there is no continuity: _

 - repair the wiring.  2 If there is continuity:

_ - replace the C/B CLOCK/NORM/SPLY (6FS).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 203  Feb 01/00R  CES  (2) If the circuit breaker (6FS) is open:

 - close the circuit breaker.  (a) If the circuit breaker trips:  - replace the CLOCK (2FS).  1 If the fault continues: _

 - do a check and repair for a short to ground the wiring between the circuit breaker (6FS) and the clock (2FS).  (b) If the circuit breaker stays closed and the fault continues:  - replace the CLOCK (2FS).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 204  Feb 01/00R  CES  Loss of the Bus Output from the Clock Detected by the AFS

 1. Possible Causes _______________  - FMGC-1 (1CA1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 指示和记录系统 1

原标题:
43 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 欧冠女排斯坎迪奇遭伊萨双杀无缘4强 朱婷夺19分

      郭天翔对钛媒体App表示,当以后大家硬件又进入到一个基本差不多的状况的时候,软件的使用体验就会越来越重要了。而真正能让消费者长期使用,认同折叠屏产品,还是需要通过软件来打造更适合的使用场景,发挥出折叠屏的特点和优势。
  • 当孩子问你“你为什么上班?”,孩子的人格格局就在家长回答中!

      生育与养老话题在2024年两会期间备受关注。据统计局数据,2023年出生人口902万人,出生率为6.39‰;死亡人口1110万人,死亡率为7.87‰;全国60周岁及以上人口占总人口的21.1%。
  • 舒桂林:恒大终极问题

      (一)股东大会届次:2024年第二次临时股东大会
  • 新能源反攻,外资百亿抢筹,买车门槛即将下降?

      直接用粉底刷蘸取散粉,在盖子上调和。多多转动刷头。
  • 周末娱乐指南:新综艺《我想开个店》开播!

      虽然折叠屏目前的体量并不是很大,但有一点可以确定的是,折叠屏的方向并没有错。在钛媒体App看来,当下的智能手机市场创新力到了瓶颈期,在没有出现革命性的创新之前,折叠屏是手机厂商寻求增量以及提升体验的正确方向。图片来源:IDC
  • 荣耀独立560天,还未摆脱华为“影子”

      比如曾经红极一时的元气森林,近两年就已经在发力经销商体系改革,转头向“传统快消行业”看齐。
  • 郭施亮:AI巨头英伟达股价大跌逾5%,AI炒作行情告一段落了吗?

      黑崎资本首席投资执行官陈兴文认为,eVTOL飞行器具有环境友好、经济性高、便捷性强、安全性高和效率高等优势。它们不产生尾气排放,运营成本较低,能在狭小空间起降,具备冗余系统确保安全,且适合城市间的快速运输。
  • 大科学装置好事多多,代表委员为何喜忧参半

      –最大吨位的邮轮,打破‘绿洲系列’邮轮尘封了12年的世界纪录
  • 24岁儿媳与五旬公公私奔 丈夫受打击自杀

      2022年开场,“经济分化”“贸易摩擦”“乌俄冲突”等局面接踵而至,对于建筑涂料行业而言,面临着“原材料上涨”“物流问题”“进出口贸易”等诸多困难,这是涂料行业各企业必须面临的全新挑战。
  • 国际泳联:将执行国际体育仲裁法庭对孙杨的裁决

      与此同时,捷途山海T2延续了捷途旅行者系列的优秀基因,“纵横之道”的设计美学提供了令人向往的高颜值与力量感。高通骁龙8155芯片为15.6英寸中控巨幕+AI智能管家+FOTA智能升级等超强配置带来开机快、响应快、识别快、连接快的极致流畅体验……
  • 王永利:央行降准力度超预期但在情理之中

      对此,有网友评论称,相比较于视频网站,充值会员的数十元或上百元的花费,零星购买资源“很划算”,但也有网友疑问:这样是否会侵犯一些视频网站的版权?售卖资源的背后,是否存在骗局或利益链?
  • 2024年度日本全国政府一般预算支出112.5717万亿日元(人民币5.4万亿元),防卫费7.9496万亿日元

      巴奈特去世之际,波音正因多个型号飞机发生安全事故受到外界关注和质疑。1月5日,美国阿拉斯加航空公司一架波音737MAX9型客机起飞后不久发生事故,机舱侧面一处门塞(内嵌式应急门)脱落。调查人员检查后发现,4个本应将门塞固定到位的螺栓缺失。事故发生后,美国联邦航空管理局下令停飞由美国航空公司运营或在美国境内运营的波音737MAX9型客机,随后全球多国监管机构和航空公司也宣布停飞该型号客机。1月13日,日本全日空一架波音737-800型客机的驾驶舱玻璃出现明显裂痕。17日,美国国务卿布林肯从瑞士世界经济论坛年会返回美国时,其乘坐的波音737客机在起飞前发生氧气泄漏故障,不得不更换飞机。18日,美国阿特拉斯航空公司一架波音货运飞机在迈阿密国际机场起飞后发动机出现故障,被迫紧急返航。
  • iShares白银ETF11月2日白银持有量与上一交易日减少4.43吨

      根据目前的爆料信息,如无意外,RedmiK80预计搭载骁龙8Gen3移动平台,而RedmiK80Pro则计划搭载骁龙8Gen4移动平台。在之前的RedmiK70系列中,起售价为1999元的K70E因其出色的性能表现被官方誉为“新一代性能焊门员”,主要定位于千元机市场。然而,由于K70E与Note系列的定价存在一定程度的重叠,为了更好地划分K系列与Note系列的市场定位,官方可能决定取消K80E这一机型。这将使消费者能更清晰地了解不同系列产品的特点与定位。
  • LTPO材料+iOS 16终于让iPhone 14 Pro系列支持常亮显示

      大学同学小璇,4年间坚持每天跑10公里,还几次因为拼命节食在课堂上低血糖晕倒。从大一反反复复地折腾到大四,瘦了20多斤,却也大伤元气,从一个爽朗的元气少女,变成了经期紊乱、脸色枯黄、稍稍晒点太阳就全身紫外线过敏的药罐子。