在线看免费❗_一家四口的卡通图片一儿一女背景-艺文笔记

王金豹 2026年01月26日 02:18:10
发布于:曼谷

在线看免费❗_一家四口的卡通图片一儿一女背景_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R 1EFF : 159-199, 211-212, 1 27-54-55Page 451 1 1 Aug 01/05 1 1 1CES 1

R  (k) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin  R  (37) in an applicable position on the bearing housing (34).  R  Remove all unwanted material from the area.  R  (l) Safety the ring nut (40) with a new cotter-pin (37).  R  (m) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces  R  of the lever (28).  R  (n) Turn the lever (28) through 90 deg. and install it in the bearing  R  housing (34).  R  (o) Install the bearing housing (26), the bolt (25) and the nut (44).  R  (p) Apply COMMON GREASE (Material No. 04-022) to the retention plate  R  (35) and to the bolt (27).  R  (q) Install the retention plate (35), the bolt (27) and the nut (39).  R  (r) TORQUE the nut (39) to between 1.4 and 1.5 m.daN (10.32 and 11.06  R  lbf.ft).  R  (s) Manually operate the lever (28) and make sure that it moves  R  freely.  R  (t) Safety the nut (39) with the new cotter pin (38).  R  (u) Remove the adjustable strut.  R  (2) At the track 1 position:  R  (Ref. Fig. 401B/TASK 27-54-55-991-001-C)  R  (a) Connect the lever (10) to the flap link arm (5) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)_  R  and the nut (8).  R  (b) Install the bolt (6), the washer (7) and the nut (8).  R  (3) At the track 2 position:  R  (a) Connect the lever (28) to the flap link arm (32) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)_  R  and to the nut (31).  R  2 Install the bolt (33), the washer (29) and the nut (31)._ 

R 1EFF : 159-199, 211-212, 1 27-54-55Page 452 1 1 Aug 01/05 1 1 1CES 1

R  (4) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).  R  (5) At the track 1 position:  R R  (a) TORQUE the nut (8) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter pin (9).  R  (6) At the track 2 position:  R R  (a) TORQUE the nut (31) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter-pin (30).  R  (7) At tracks 1 and 2:  R R  (a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6) and (33) and the nuts (8) and (31) after assembly.  R R  (8) Install the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-54-49-400-002).  R R R  (9) Remove the locking tools LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT from the torque shaft outboard of the track 2 actuator (Ref. TASK 27-50-00-000-003).  R  (10) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).  **ON A/C 301-399,  Subtask 27-54-55-420-053-B  B. Installation of the Flap-Actuator Lever Assembly - Track 1  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED. 

R 1EFF : 159-199, 211-212, 301-399, 1 27-54-55Page 453 1 1 Aug 01/05 1 1 1CES 1

 (1)  At the track 1 position: R (Ref. Fig. 401C/TASK 27-54-55-991-001-B)

 (a)  Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of the actuator lever (11).

 (b)  Install the actuator lever (11) into the No.1 flap track beam.

 (c)  Apply COMMON GREASE (Material No. 04-022)to the bearing surfaces of the bearing housing (1).

 (d)  Put the bearing housing (1) in position on the flap track beam.

 (e)  Put the two washers (4) on the two bolts (5). Install the two bolts (5), the two washers (13) and the two nuts (12).

 (f)  Put the five washers (2) on the five bolts (3). Install the five bolts (3), the five washers (15) and the five nuts (14).

 (g)  TORQUE the two nuts (12) to between 2.2 and 2.6 m.daN (16.22 and

 19.17 lbf.ft).  (h)  TORQUE the five nuts (14) to between 1.3 and 1.4 m.daN (115.04 and 123.89 lbf.in).

 (i)  Remove the adjustable strut.

 (j)  Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (7) and the nut (9).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵6

原标题:
51 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 利比亚法院审判IS成员时遭袭 4名安全人员死亡

      数据显示,“RedTights”一词在2023年12月的搜索热度比2022年12月增加了82%、搜索量更是去年的两倍;而在Pinterest上,自9月份以来“RedTights”的搜索量增长了惊人的614%。via.Instagram
  • 选主板必须要懂芯片组:一文详解芯片组

      公司控股子公司原则上与其他股东按公司持股比例对参股房地产项目公司提供担保。如根据金融机构要求,公司控股子公司超过公司持股比例提供担保,为进一步防范担保风险,在提供担保后将要求其他股东或者参股房地产项目公司提供反担保,担保公平、合理,不存在损害公司及股东利益的情形。公司控股子公司为参股房地产项目公司融资及展期提供担保,安排专人参与经营管理,严控财务风险。本次公司控股子公司拟对参股公司进行担保不存在与中国证监会发布的《上市公司监管指引第8号一一上市公司资金往来、对外担保的监管要求》相违背的情况。
  • 女人是不是只有瘦,才能得到世界的善意

      巨大的商业前景吸引着越来越多的力量进入飞行汽车赛道,并最终集结与分离成了三大竞争矩阵。第一大矩阵是以吉利、广汽为龙头的传统汽车制造商,双方产品的首次试飞均取得成功,AE200还获得相关航空公司的100架采购订单;第二大矩阵是以小鹏汇天为代表的造车新锐,除了分体式飞行汽车“陆地航母”去年斩获了100架订单外,小鹏汇天自主研发的两座载人飞行汽车“旅航者X2”也正式拿到了中国民用航空管理局颁发的特许飞行证;第三大矩阵是峰飞航空、亿航智能等为代表的国内初创公司,其中“盛世龙”截至目前的采购订单数达到370架,而亿航智能自主研发的EH216—S飞行汽车不仅获得中国民航局正式颁发的型号合格证,而且成型飞机已在广州和合肥两地完成商业首飞。
  • 香港安特国际今日财经点评:期指人气持续温和回升

      乌克兰武装部队总参谋部同一天发布战报称,在过去24小时内,前线地区发生54次战斗,乌军对俄多个人员及军事装备集中区、指挥所实施了打击,摧毁1套山毛榉-M1防空导弹系统和1个雷达系统。
  • 美联储“鸽声”令市场欣喜 年末行情能否更进一步

      2023大家居建装行业的百大新品——设计篇
  • 曾经的表情包小公举只整这里就变身成为小仙女啦!

      但今天的标普500指数并非如此。分析师说,目前标普500的被动投资仅占总量的一半多一点,相比之下日本的被动投资比例达到80%,而且CFTC数据显示目前投机者的头寸为净空头。同时,根据市盈率数据,虽然标普500的价格和内在价值之间的差距很大,但除了“七姐妹”(Magnificent7)之外,大部分股票的市盈率更接近长期平均水平。
  • 王栎鑫献唱全球华语金曲奖忘词 发文致歉:sorry!

      本报专栏文章仅代表作者个人观点,特此说明。
  • 一带一路国际帆船赛重启海外站 32支船队参赛

      惠誉:授予中航国际融资租赁拟发行美元债“A-(EXP)”预期评级
  • 有效需求不足将给宏观政策带来极大挑战

      快船方面,莱昂纳德和乔治休战,哈登16中5仅得到13分5篮板11助攻,鲍威尔26分7篮板,祖巴茨18分6篮板,科菲16分10篮板4助攻,曼恩16分,海兰德12分5助攻。
  • 黄龙慧南禅师禅诗欣赏

      值得一提的是,在3月8日晚间,达嘉维康刚披露了一则股东减持公告。公告显示,量吉投资及其一致行动人宁波梅山保税港区淳康股权投资合伙企业(有限合伙)(以下简称“淳康投资”)计划以集中竞价或大宗交易的方式减持股份数量不超过619.52万股(占公司总股本3%)。
  • 同业拆借利率简介及为何同业拆借利率有负值

      配套点评:便利的生活配套,让衣食住行、柴米油盐的生活锦上添花。为了更加清晰,将日常的生活配套进一步细分为教育、医疗、购物、休闲便利等维度。
  • 药明康德A股、H股涨超5%

      北京商报记者注意到,自达嘉维康首发限售股解禁后,量吉投资及其一致行动人就开始持续减持公司股份。
  • 4岁孩子写字会不会太早?

      策划|暗涌编辑部