国内精品♨️_永久伊甸院xy750伊园甸-艺文笔记

王金豹 2025年11月05日 22:02:12
发布于:曼谷

国内精品♨️_永久伊甸院xy750伊园甸_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (b)  With the door in the down position (door closed and locked):

 -make sure that the clearance J11 between the frame structure and the safety pin is 4 -1 +1 mm (0.1574 -0.0393 +0.0393 in.).

 (c)  If the clearances J10 and J11 are not in the tolerances, open the door and adjust as follows:

 1_ Remove the bolt (24), the adjustable washers (25) and (29) and  the caps (26) (27) and (28).  2_ Put new adjustable washers (25) and (29) and install them,  with the caps (26) (27) and (28) and the bolt (24).  3_ TORQUE the bolt (24) to between 0.6 and 0.7 m.daN (53.09 and  61.94 lbf.in).

 (7) Installation of the locking hook (2).  (a) Install the locking hook. 1 Put the door in the up position. _ 2 Apply COMMON GREASE (Material No. 04-004) on the part that _  moves of the shouldered bush (4). 3 Install the shouldered bush (4), the bolt (15), the washer _  (14) and the nut (5). 4 TORQUE the nut (5) to between 1.2 and 1.35 m.daN (106.19 and _  119.46 lbf.in). 5 Install a new cotter pin (6). _ NOTE : If you install a new bolt (15), drill a hole of 2.7 mm ____ (0.1062 in.) for the cotter pin installation.  (b) Connect the rod (48). 1 Install the bellow (50), the plate (51), the bolts (52) and _  the clamp (53). Do not tighten the clamp (53). 2 TORQUE the nuts (49) to between 0.35 and 0.45 m.daN (30.97 and _  39.82 lbf.in). 3 Install the bushes (10) and (11) with SPECIAL MATERIALS _ (Material No. 05-002), the washer (12) and the bolt (13). R 1EFF : 001-049, 051-056, 1 52-11-21Page 459 1 1 May 01/05 1 1 1CES 1

 4_ Install the washer (9) and the nut (8).  5_ TORQUE the nut (8) to between 0.7 and 0.8 m.daN (61.94 and  70.79 lbf.in).  6_ Install a new cotter pin (7).  NOTE : If you install a new bolt (13), drill a hole of 2 mm____  (0.0787 in.) for the cotter pin installation.

 (c) Connect the rod (23). 1 Install the bushes (21) and (22) with SPECIAL MATERIALS _  (Material No. 05-002), the washer (17) and the bolt (16). 2 Install the washer (18) and the nut (29). _ 3 TORQUE the nut (19) to between 0.15 and 0.17 m.daN (13.27 and _  15.04 lbf.in). 4 Install a new cotter pin (20). _ NOTE : If you install a new bolt (16), drill a hole of 1.8 mm ____ (0.0708 in.) for the cotter pin installation.  (8) Adjustment of the locking hook (2). (Ref. Fig. 416/TASK 52-11-21-991-032)  (a)  Open the door.

 (b)  Put two shims in the upper fittings on the frame.

 (c)  Close the door and adjust the locking hook (2) as follows:

 1_ Turn the barrel of the rod (48) until the locking hook (2)  touches the roller (58).  2_ Tighten the nuts (46) and the clamp (53).  3_ Make sure that the lockwashers (47) are correctly positioned.  4_ Safety the nuts (46) and the lockwashers (47) with

 MISCELLANEOUS (Material No. 19-010).  (d) Open the door and remove the shims from the upper fittings (on the frame). R 1EFF : 001-049, 051-056, 1 52-11-21Page 460 1 1 May 01/05 1 1 1CES 1

 Locking Hook Adjustment  Figure 416/TASK 52-11-21-991-032

R 1EFF : 001-049, 051-056, 1 52-11-21Page 461 1 1 May 01/05 1 1 1CES 1R **ON A/C 057-099, 101-149, 151-199, 201-299, 301-399, 401-499,

 Subtask 52-11-21-420-055-A  E. Installation of the Safety Pin and Locking Hook  (Ref. Fig. 407/TASK 52-11-21-991-013)

 (1)  Make sure that the door is in the open position.

 (2)  Connect the rod (33).

 (a)  Install the bushes (34) and (39) with SPECIAL MATERIALS (Material No. 05-002), the rod (33), the washer (32) and the bolt (31).

 (b)  Install the washer (35) and the nut (36).

 (c)  TORQUE the nut (36) to between 0.3 and 0.35 m.daN (26.54 and

 (d)  Install a new cotter pin (37). NOTE : If you install a new bolt (31), drill a hole of 1.9 mm

____ (0.0748 in.) for the cotter pin installation.  (3) Installation of the safety pin on the fitting (56).  (a)  Apply COMMON GREASE (Material No. 04-004) on the part that moves of the safety pin (30).

 (b)  Install the safety pin (30) in its fitting (56).

 (c)  Apply SEALANTS (Material No. 09-019) on the surface of the fitting (56) in contact with the door structure.

 (d)  Put the fitting (56) in position on the door structure and remove the unwanted sealant with CLEANING AGENTS (Material No. 11-004) and MISCELLANEOUS (Material No. 19-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM DOORS 舱门2

原标题:
92 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 蔚来亏损211亿:放弃幻想,过紧日子

      趁着这个机会,咱们不妨一起回顾一下那些龙珠联名潮流单品,以及球鞋定制作品。
  • 科技毁了世界杯吗?

      图片来源:同花顺iFinD
  • 职业队冠名权益之争:规范是出路 三点请求遭拒

      《RawData》——5.99美元(85%折扣)
  • 机构:港股聚焦年报预喜+高分红的交集板块

      路见不平拔不拔“刀”?老人摔倒帮不帮扶?落水小孩救不救起?曾有一段时期,“扶不扶”“救不救”成了社会痛点,实际生活中部分不良示范也让“好人”们不得不思考:见义勇为的“代价”,我们真的付得起吗?
  • 居然智慧家“人+车+家”打造全屋智能体验样本!智能汽车体验中心落地北京通州

      步履不息,旅游拓展着人生的宽度。3年时间,自驾9万公里,走过近300个城市,在年过六旬的萍姐眼中,旅游是发现美好、“一直在路上”的自我疗愈;入冰河漂流探险、坐直升机上雪山,于耄耋之年的江滨而言,旅游是不负人生、“看一看世界的繁华”的洒脱热爱……如今,越来越多老年人更喜欢出游并享受旅行带来的乐趣。
  • 两市主力资金净流入超45亿元 电力设备等行业实现净流入

      坦白而言,格力对于经销商的强势态度,有着董明珠鲜明的个人色彩,在执掌格力期间,董明珠就素以“铁娘子”的称号而闻名。
  • 天津女排外援瓦尔加斯已回国 将重返费内巴切征战

      加勒比共同体此前宣布,11日在牙买加首都金斯敦举行紧急会议,与相关国家代表共同讨论海地局势,以寻求尽快恢复海地安全秩序并向当地居民提供紧急人道主义援助。
  • Aora荣获iF设计奖,洞见未来家居照明

      过去的西海固,一方水土养不活一方人。农民为了吃饭穿衣会过度开垦,以生态换粮食。结果就是越垦天越旱,越垦人越穷。为了扭转这种局面,在解决生活用水和产业用水的同时,宁夏也在积极开展生态移民、退耕还林还草,实现生态蓄水。而水土涵养本身,也会带来更多降水,这样一来就实现了生态越好、降雨越多的良性循环。△资料图
  • 高瑞东:开年数据“大礼包”,成色如何?

      银发族追寻“诗和远方”,也折射出老年人更注重精神养老的新趋势。目前,我国正处在老龄化快速发展阶段,预计到2025年,60岁及以上老年人口将达到3亿人。日益增大的老年人口规模叠加养老理念新变化,对养老产业发展和老年友好型社会建设提出了新要求。锚定老年人娱乐、健身、文化、学习、社交、康养等领域的多层次需求,发展智慧养老等新业态、培养为老服务专业人才、提升老年文体娱服务质量、扩大老年教育资源供给,老年人的生活将更加充实、美好。
  • 孔雪儿的变美思路 爱淡妆才是硬道理

      郑智(右二)成为了伊万的中方助教。
  • 金价涨势放缓高位企稳整理

      精细管理、多元服务也是天津乐境餐厅特色之一,营养师对需要特殊护理的长者进行营养评估,出具饮食调整方案,餐饮团队结合长者身体情况,全方位提供营养膳食服务,保障长者健康饮食。
  • 苏宁已无实控人

      从娃哈哈过去几十年的经销商经营思路来看,宗庆后始终是这个庞大生态的灵魂人物,他个人传奇的创业经历,以及对待经销商的负责态度,都使得经销商们愿意和娃哈哈深度绑定。
  • 纽约黄金期货价格周一走高

      探索教学改革的“乘法”
  • 任泽平:全球房价大趋势

      但在收费争议、驿站挤压情况下,快递柜这门生意却逐渐变得不吃香。据时代财经梳理,上述快递柜品牌撤场的原因中大多都提到了使用率过低、业务量少。多位受访者便称,近两年小区住户的取件习惯有所变化,如今更加倾向于去驿站取件,“很多都是上班族,驿站取件超时不收费更加友好。”