深夜福利✅_亚洲zljzljzljzlj大全-艺文笔记

王金豹 2026年01月02日 02:01:17
发布于:曼谷

深夜福利✅_亚洲zljzljzljzlj大全_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 A. If the pack 1 flow indicator on the ECAM BLEED page is stuck in the high position:  NOTE : Do the following step only, if the FCV is of the standard: ____  - PN 751A0000-07 Amdt. ABC or,

 - PN 751A0000-07 Amdt. BC or,

 - PN 751B0000-02 Amdt. ABC.

 (1) Replace the filter of the VALVE-FLOW CTL (11HB) (Ref. AMM TASK 21-51-51-600-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-51-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/05 CES

 (2) If the fault continues:

 - replace the VALVE-FLOW CTL (11HB) (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).

 (3) If the fault continues:

 - replace the SENSOR-PRESSURE (10HB) (Ref. AMM TASK 21-51-11-000-001) (Ref. AMM TASK 21-51-11-400-001).

 (4) If the fault continues:

 - do a check and repair the wiring between the:

 - FCV connector (11HB-A) pin C and the PC connector (27HH-AA) pin B7.

 - FCV connector (11HB-A) pin D and the PC connector (7HH-AB) pin B6.

 - FCV connector (11HB-A) pin B and GND (Ref. ASM 2151S01).

 (5) If the fault continues:

 - do a check and repair the wiring between the:

 - FCV connector (8HB-A) pin C and the PC connector (7HH-AA) pin B7.

 - FCV connector (8HB-A) pin D and the PC connector (27HH-AB) pin B6.

 - FCV connector (8HB-A) pin B and GND (Ref. ASM 2151S01).

 (6) Do a check for leakage at the cabin-pressure sense-line between FCV (11HB) and the pressurized area.

 B. If the pack 1 flow indicator on the ECAM BLEED page is stuck in the low position:  NOTE : Do the following step only if the FCV is of the standard: ____  - PN 751A0000-07 Amdt. ABC or,

 - PN 751A0000-07 Amdt. BC or,

 - PN 751B0000-02 Amdt. ABC.

 (1) Replace the VALVE-FLOW CTL (11HB) (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).

 (2) If the fault continues:

 - do a leakage check of the sense-line between the FCW (11HB) and the pressure-sensor (10HB), and replace if necessary.

 (3) If the fault continues:

 - replace the SENSOR-PRESSURE (10HB) (Ref. AMM TASK 21-51-11-000-001) (Ref. AMM TASK 21-51-11-400-001)

 (4) If the fault continues:

 - do a leakage check of the sense-line between the CPNOH (10HM9) and the FCV (11HB), and replace if necessary.

 (5) If the fault continues:

 - replace the SENSOR-COMPRESSOR PNEUMATIC OVHT (10HM9) (Ref. AMM TASK 21-61-18-000-001) (Ref. AMM TASK 21-61-18-400-001)

 (6) If the fault continues:

 - Replace the REHEATER (10HM3) (Ref. AMM TASK 21-52-31-000-001) and (Ref. AMM TASK 21-52-31-400-001). R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399,  A. If the pack 1 flow indicator on the ECAM BLEED page is stuck in the high position:  (1) Replace the VALVE-FLOW CTL (8HB) of the opposite pack (pack 2) (Ref. AMM TASK 21-51-51-000-001) (Ref. AMM TASK 21-51-51-400-001).

 (2) If the fault continues:

 - do a leakage check of the sense line between the angled connector of the pressure-sensor(10HB) and the downstream pressure-port at the FCV (11HB), and replace if necessary.

 (3) If the fault continues:

 - replace the SENSOR-PRESSURE (10HB) (Ref. AMM TASK 21-51-11-000-001) (Ref. AMM TASK 21-51-11-400-001).

 (4) If the fault continues:

 - do a check and repair the wiring of the opposite FCV (8HB) between the:

 - FCV connector (8HB-A) pin C and the PC connector (7HH-AA) pin B7.

 - FCV connector (8HB-A) pin D and the PC connector (27HH-AB) pin B6.

 - FCV connector (8HB-A) pin B and GND (Ref. ASM 2151S01).

 (5) If the fault continues:

 - replace the VALVE-FLOW CTL (11HB) (Ref. AMM TASK 21-51-51-000-001) (Ref. AMM TASK 21-51-51-400-001).

 (6) If the fault continues:

 - do a check and repair the wiring between the:

 - FCV connector (11HB-A) pin C and the PC connector (27HH-AA) pin B7.

 - FCV connector (11HB-A) pin D and the PC connector (7HH-AB) pin B6.

 - FCV connector (11HB-A) pin B and GND (Ref. ASM 2151S01).

 B. If the pack 1 flow indicator on the ECAM BLEED page is stuck in the low position:  (1) Do a leakage check of the sense-line between the in-line-connector of the pressure-sensor (10HB), and the upstream port at the FCV (11HB), and replace if necessary.

 (2) If the fault continues:

 - replace the SENSOR-PRESSURE (10HB) (Ref. AMM TASK 21-51-11-000-001) (Ref. AMM TASK 21-51-11-400-001)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 AIR CONDITIONING 空调2

原标题:
6 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 18K金回收价格多少钱一克(2024年03月12日)

      新京报讯(首席记者郭铁)现制酸奶品牌“茉酸奶”近日缩杯调价引起消费者关注。对此,茉酸奶3月11日回复新京报记者称,结合市场调研和咨询公司建议,公司升级有机酸奶基底和友好杯型的同时,对价格做了相应调整,以让更多人尝试公司产品。
  • 土超女排萨勒耶尔1

      结合中国证券投资基金业协会和天眼查公开披露的信息显示,合肥创新投资是安徽省合肥市国有资产控股有限公司的全资子公司,致力于推动合肥市科技创新型企业的发展和高科技成果的转化。
  • 金价随时可能跌破1200美元 国庆将迎购买好时机

      业绩较好的“白马股”,股价短期快速下跌,并且与融资融券资金出现联动,在此前是有过一些先例的。据《证券时报》统计,2021年二季度,包括美年健康、顺丰控股、中国中免、恒瑞医药等在内的“白马股”相继出现重挫、跌停甚至闪崩,与当年春节前后包括公募基金在内的机构资金抱团“扎堆”带动白酒、新能源等行业个股上涨的行情形成对比。
  • 两会第一观察 ∣ 事关强国强军,习主席发出新号令

      在股东宁波梅山保税港区量吉股权投资合伙企业(有限合伙)(以下简称“量吉投资”)及其一致行动人拟减持不超3%公司股份后,()实控人坐不住了,提议公司以1000万—1500万元回购公司股份,且回购股份全部予以注销,减少公司注册资本。值得注意的是,这并非是量吉投资及其一致行动人首次拟进行减持,自首发限售股解禁后,上述股东已持续减持公司股份多次。遭股东不断减持背后,达嘉维康业绩出现承压,2023年前三季度净利下滑逾五成。
  • 俄总统新闻秘书:俄方掌握在乌北约相关人员信息

      如果能够达到50万人民币,那么张志磊团队是可以达到收支平衡的。如果达不到这个量级,那么从他本场比赛超千万人民币级的出场费、赞助商收入看,也是能够接受的。
  • 博净分体式集成灶给国人带来更加健康智能的厨房生活

      然后我们来看下瑞风RF8的外观,亮点集中在前脸样式,分别有凌空、龙鳞和青云这三种,本次试驾见到了凌空、龙鳞两种,看着确实有点新国潮设计的味道。
  • 2023上半年精装卫浴市场竞争白热化,谁摘下市占率第一的桂冠?

      2、《印尼年产360万条子午线轮胎与3.7万吨非公路轮胎项目可行性研究报告》
  • 突然逆转!AI巨头大跌

      苹果的悖论和枷锁
  • 3月11日沪深两市涨停分析:安彩高科、立航科技、艾艾精工均走出5连板

      青海省博物馆同样热闹非凡,该馆组织开展了“字字平安”印刷体验活动,吸引不少亲子家庭参与。在工作人员的指导下,孩子们动手体验雕版印刷、活字印刷,感受古人的智慧。现场一位家长说,此次活动是一次难忘的体验,孩子对中华优秀传统文化有了全新认识,增强了文化自信和民族自豪感。
  • 未来中国经济有三种演变可能

      双方合作缘来已久,首款车型分工明确
  • 大厂打响开工发令枪:有人领到3688元红包,有人接到停工通知

      因此,一个处于口欲期的人很难成功塑形,因为减肥的过程会触及到内在的恐慌感,而恐慌感又需要用食物来安抚;而一个处于肛欲期的人,则可以凭借坚定的意志力,排除万难,达到改变身材的目的。
  • 这些时尚感发饰也太上头了吧

      同时,他们也知道技术力塑造好了,更能增添大家对品牌的好感。
  • 决策层将进一步放松房地产政策

      “孩子们手机上瘾不仅导致近视率上升、体质下滑,也会削弱学生的上进心,对于需要耐心与复杂逻辑思考的学业任务失去兴趣。”对于这些负面影响,李莉总结:当周围的孩子都开始用手机打游戏或者社交时,来自同辈的群体示范,也导致“玩手机”在当下的留守儿童中成为一种“新潮流”,甚至出现“游戏大神”比“学习尖子”更受追捧的现象。网络宣传的一些错误观念也会潜移默化影响着留守儿童的“三观”。