在线看免费❗_免费看国产-艺文笔记

王金豹 2025年12月30日 13:50:50
发布于:曼谷

在线看免费❗_免费看国产_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Engine 1(2) Fire Extinguishing Circuit - Schematic  Figure 006  1EFF :  ALL  1  26-21-00 Page 20  1  1  Nov 01/03  1  1  1CES  1

 When you press the TEST pushbutton switch, the FIRE warning indications are triggered and you check the condition of the fire extinguishing system:  - on the AGENT 1 and AGENT 2 pushbutton switches:  . lighting of the SQUIB legend,  (only if the two filaments are normally power supplied)  . lighting of the amber DISCH legend, (checking of the lamps only).  -electrical supply of the two filaments of each cartridge  NOTE : Although only one filament is sufficient to enable the firing of ____ the cartridge, the test will be positive only if the two filaments are electrically supplied. The test current is limited to 80 mA by the test module whereas the firing current is 5A.  If the failure is detected during the test sequence, a fault message comes into view in the ECAM (For example ENG 1 (2) LOOP A(B) FAULT).

 B. Built-In Test Equipment (BITE)

 This function is specified in the ATA chapter 26-12-00 (Para. 8.  BITE/Test).

 C. Test of the Pressure Switch (Ref. Fig. 007)  The pressure switch on the fire extinguisher bottle has a manual test device. An hexagonal wrench is required to do the test.  The manual test checks the condition of the electrical contact. Rotation of the test screw opens the contact (continuity between pins 1 and 3): the DISCH legend on the AGENT 1(2) comes on.  In the rest position, the DISCH legend goes off.  NOTE : P > minimum pressure = continuity between pins 2 and 3 ____  P < minimum pressure = continuity between pins 1 and 3.

 Pressure Switch of the Fire Extinguisher Bottle  Figure 007  1EFF :  ALL  1  26-21-00 Page 23  1  1  Nov 01/03  1  1  1CES  1

 ENGINE FIRE EXTINGUISHING - DEACTIVATION/REACTIVATION _____________________________________________________  TASK 26-21-00-040-001  Bottle Pressure Check  1. Reason for the Job __________________  Refer to the MMEL TASK: 26-21-01  Engine Fire Extinguishing  Agent 1 & 2 "DISCH" Light

 2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific circuit breaker(s) safety clip(s)

R  No specific multimeter No specific warning notice No specific Allen wrench (3/32 in. hex key) No specific access platform 1.6 m (5 ft. 3 in.)  B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R 26-12-00-710-001 Operational Check of Loop/Squib 26-21-41-280-001 Weight Check of the Engine Fire-Extinguisher Bottle (6WE1,6WE2,8WE1,8WE2) 26-21-00-991-006 Fig. 401

 3. Job Set-up __________

 Subtask 26-21-00-865-054  A. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 6WE1, 6WE2  121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43  FOR 8WE1, 8WE2 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41  Subtask 26-21-00-941-063  B. Safety Precautions  (1)  On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2)  Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3)  On the overhead maintenance panel 50VU:

 (a)  Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b)  Put a warning notice to tell persons not to energize the FADEC 1(2).

 (4) Put the access platform in position below the pylon. Subtask 26-21-00-010-065  C. Get Access  (1)  FOR 6WE1, 8WE1   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火2

原标题:
49 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 年轻人争相买金,也别忘了“投资有风险”这句老话

      资料显示,项目所在地块位于合肥市肥西县桃花工业园新港南区,占地面积约1500亩,租用肥西新能源汽车智能产业园标准化厂房,购置冲压、焊装、涂装及总装相关生产设备,建设年产20万辆新能源乘用车生产制造基地。项目组成包括:冲焊联合厂房(包括冲压车间和焊装车间)、涂装车间、总装车间、各车间辅房、PDI车间、餐厅、物流门、发车中心等。
  • 教育部关于人教版小学数学教材插图问题的回应

      毕业于三亚学院,哔哩哔哩情怀游戏主播谊切苔岑-小川在现场分享了自己的游戏经历和技巧,与观众们进行了深入的交流。他强调了游戏的乐趣和团队合作的重要性,鼓励大家积极参与游戏社区,共同打造一个积极向上、充满活力的游戏环境。
  • 生孩子时,这3样衣物孕妈要提前备好

      随着出口运力的提升,2月自主品牌出口达到24.8万辆,同比增长28%,环比下降16%;合资与豪华品牌出口5万辆,同比下降15%。
  • 减龄优雅又高级 奶油蓝单品初夏不能少

      去知名金融机构实习是很多高校毕业生梦寐以求的事。如果有人收你三五万元帮你推荐实习机会,你会交钱吗?日前,有微博爆料一些第三方平台开展“收费内推”的买卖,在金融圈及高校学生中引起了轩然大波。多家金融机构已经发表官方声明,表示不存在任何形式的“收费内推”行为,提醒大家通过官网等正规途径应聘。而多位金融圈人士也向北京青年报记者表示,正规金融机构是不会招收费实习生的,广大学子谨防上当受骗。
  • 涉信披违规被立案 最贵*ST股拉响退市警报

      蒋先生说,珠宝店柜台的玻璃都砸碎了,里面都是金项链什么的,然后他就拿起来往身上放,“不知道是戴在身上还是往包里放,我们也不敢靠近。”
  • OpenAI首次正式回击:马斯克的起诉“令人费解” 可能借机窃取技术

      我是在空军中成长起来的,空军当时的组织、态势和训练都达到了与苏联对峙的最高战备水平。遗憾的是,今天的空军不一样了。20世纪90年代对效率的追求——加上最近在整个空军注入多样性、公平性和包容性的举措——消除了曾经存在于军官选拔过程中的择优和品格筛选要素。
  • 新年第一件“红”毛衫 准备回家挨夸吧

      3月11日,豫能控股再次回复投资者称,公司未收到政府部门或控股股东任何通知,也无具体推进计划;公司暂未在算力方面进行布局。
  • 美国政府讨论新法案 提议iPhone支持侧载

      此外,天津乐境已与泰达国际心血管病医院(简称泰心医院)达成合作,进一步提升养老服务内容,为身患基础病的慢病长者提供更加便捷、高效的医疗服务。依托泰心互联网医院平台,天津乐境的在住长者足不出户,即可享受包括远程门诊、远程会诊、慢病管理、远程心电诊断、住院绿通等在内的一系列服务,尤其是对于行动不便且患有慢性病的老年朋友来说,此服务极大地提高他们的就医体验和生活质量。
  • 被侮辱了的奶茶妹妹、邓文迪和田朴珺们

      消息人士称,湖人队不会为了戴维斯而送出6-8个未来的选秀权。
  • “中国家装百强装企走访调研”(半程)报告

      对消费者而言,卖得便宜当然是好事,
  • 外资突然唱多宁德时代 沙特阿美CEO:全球正在寻求可再生能源机遇

      因公司于2023年12月6日完成2022年限制性股票激励计划首次授予部分第一个归属期第一批次的股份登记手续,归属股票数量为5,193,983股,占公司总股本比例小,经计算,“晶能转债”转股价格不变,仍为13.70元/股。具体情况详见公司于2023年12月8日在上海证券交易所网站(www.sse.com.cn)披露的《晶科能源股份有限公司关于本次部分限制性股票归属登记完成后不调整“晶能转债”转股价格的公告》(公告编号:2023-101)。
  • 消费回暖、金饰火爆,一季度头部珠宝公司纷纷拿出好业绩

      《最近女明星的前夫们抱团直播,越卖惨赚钱越多》Vista看天下
  • 谨慎!投资黄金T+D如何控制风险?

      其他出道选手就放一起了,几乎都是只演了一部古装。
  • 2月CPI同比由降转涨 更多扩内需政策酝酿出台

      炒股就看金麒麟分析师研报,权威,专业,及时,全面,助您挖掘潜力主题机会!