糖心logo官网✅_里番acg琉璃全彩性奴娜美罗宾-艺文笔记

王金豹 2025年12月27日 00:56:18
发布于:曼谷

糖心logo官网✅_里番acg琉璃全彩性奴娜美罗宾_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 1EFF : 001-004, 051-054, 1 32-51-00Page 563 1 1 Aug 01/05R 1 1 1CES 1

 (6) Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001)  -engage the spigot (20) in the hole (21) on the ADJUSTING TOOL - NWS GEARBOX (13),  -make sure that it is flush with the N/WS gearbox (13).  NOTE : Lightly lybricate the packing of the sensor 4GC with COMMON ____  GREASE (Material No. 04-015).

 (7)  Connect the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (F26792000-1) (18) between the connector (19) and the RVDT 4GC (16).

 (8)  Connect an AC voltmeter (minimum range: 0-20V, accuracy: 1 mV,  frequency: 50-2000 Hz) to the SECONDARY VOLTAGE connections on the  SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (18).

 (9)  On panel 402VU, put the A/SKID & N/W STRG switch in ON position.

 (10) Stage 12:  (a) On the ADJUSTING TOOL - NWS GEARBOX, turn the two knurled adjusters (14) to move the drive plate (12) of the gearbox (10) to get the algebraic difference between U1 and U2 secondary voltage: D (value calculated on stage 7)  (U1 - U2) = D  NOTE : When you turn the knurled adjusters, the gear box plate ____ (12) moves and changes the secondary voltages U1 and U2. When you turn the knurled adjusters:  - in one direction, U1 increases and U2 decreases,

 - in the other direction, U2 increases and U1 decreases.

 (b) Record the voltages U1 and U2 (in AC voltage).  (11)  Tighten the two knurled adjusters (14) to keep the position of the drive plate.

 (12)  On panel 402VU, put the A/SKID & N/W STRG switch in OFF position.

 (13)  Remove the RVDT 4GC (16) (Ref. TASK 32-51-19-000-001).

 (14)  Tighten the screws (11) through elongated holes of the ADJUSTING TOOL

 (15)  Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001).

 (16)  On panel 402VU, put the A/SKID & N/W STRG switch in ON position.

 1EFF : 001-004, 051-054, 1 32-51-00Page 564 1 1 Aug 01/05R 1 1 1CES 1

 (a)  On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (18) set the selector switch to U1.

 (b)  Record the voltage (U1)(in AC voltage).

 (c)  On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (18) set the selector switch to U2.

 (d)  Record the voltage (U2)(in AC voltage).

 (e)  Check that the algebraic value H: (U1 - U2) = H = D +/- 10mV

 (f)  If the value H is not in the limits, do the procedure from step

 (18)  If the value is correct, on panel 402VU, put the A/SKID & N/W STRG switch in OFF position.

 (19)  Remove the RVDT 4GC (16) (Ref. TASK 32-51-19-000-001).

 (20)  Loosen the knurled adjusters (14).

 (21)  Remove the ADJUSTING TOOL - NWS GEARBOX (13).

 (22)  Remove the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (18).

 (23)  Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001).

 (24) Connect the electrical connector (19) to the RVDT 3GC (16). Subtask 32-51-00-865-084  F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 3GG, 4GG, 2EN1, 2EN2  1EFF : 001-004, 051-054, 1 32-51-00Page 565 1 1 Aug 01/05R 1 1 1CES 1

 5. Close-up ________ Subtask 32-51-00-860-061  A. Aircraft Maintenance Configuration  (1)  If the front of the aircraft is lifted off the ground, lower the aircraft to the ground (Ref. TASK 07-11-00-586-001).

 (2)  If the nosewheels are on grease plates, move the aircraft to remove the grease plates (Ref. TASK 09-10-00-584-002).

 Subtask 32-51-00-740-050  B. Bite Test  (1) Do the Bite test of the BSCU (Ref. TASK 32-46-00-740-001). Subtask 32-51-00-942-057  C. Remove the Equipment  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Remove the access platform(s).

 (3)  Remove the warning notice(s).

 (4)  Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 1EFF : 001-004, 051-054, 1 32-51-00Page 566 1 1 Aug 01/05R 1 1 1CES 1

 TASK 32-51-00-820-001- 01   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架9

原标题:
27 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 小伙给酒店差评被连骂三次垃圾 飞猪客服要求理解

      七年过去,董老师的“老学员”有1000多人
  • 迅雷CEO陈磊:会深入研究CDR政策

      此前,有网友注意到《魔兽世界》社区已删除了2022年底发布的停运公告。同时,魔兽国服官网也从404状态变成了403(禁止访问),有玩家还注意到了“敬请留意”这四个字,似乎在暗示着《魔兽世界》即将回归。
  • 黄金饰品抢购热潮马上来袭

      楼盘规划—舒适度
  • 张杰牵手谢娜唱《这就是爱》 互曝夫妻日常甜炸了

      针对公司股价异常波动,中路股份3月11日晚间公告表示,公司A股股票截至2024年3月11日收盘的最新动态市盈率分别为527.08倍。经公司自查,目前生产经营活动正常,市场环境或行业政策没有发生重大调整、生产成本和销售等情况没有出现大幅波动。截至目前,公司控股股东中路集团持有公司股份2515.83万股,占公司总股本7.83%;质押2430.94万股,占其所持股份的96.63%。
  • 这种农药对人类健康的影响,至少可持续三代

      赛力斯之后,北汽站到舞台中央。
  • 经济短期回升但难以强劲复苏

      我国成功研制国际首台全自动干细胞诱导培养设备为再生医学及精准医疗奠定装备基础图为全自动干细胞诱导培养设备操作台中科院供图
  • 伍戈:全球经济动能 这次有何不同?

      协调发展蕴含着高质量发展的巨大潜能。山东菏泽玫瑰种植基地的鲜花销往北京、青岛;白鹤滩水电站巨量绿电顺着密布的特高压线穿越山河,7毫秒左右就被“闪送”到2000公里之外的江浙两省……各地因地制宜,既立足自身比较优势,又融入国家发展大局,合理分工,优势互补,奏响加快构建新发展格局的“协奏曲”。迈步新征程,展现新作为,促进各类要素合理流动和高效集聚,畅通国内大循环,就一定能以协调发展为中国式现代化注入澎湃动能。
  • 音集协代理总干事周亚平:决策会依程序公开进行

      荷兰国家银行数据科学家AlexdeVries在一篇论文中估计,到2027年,整个人工智能行业每年将消耗85至134太瓦时(1太瓦时=10亿千瓦时)的电力。“人工智能是非常耗能的。每一台人工智能服务器的耗电量已经相当于十几个英国家庭的总和。所以数字加起来真的很快。“
  • 今年“尔滨”火了,东北菜也火到国外了!

      北京时间3月12日,布莱斯-加里特(BriceGarnett)在波多黎各公开赛上复活,通过四个加洞第二次赢得美巡赛,世界排名飙升到196位。
  • 理财“不好卖”,混合估值类产品能否挑起大梁?

      销售机构名称:蚂蚁(杭州)基金销售有限公司
  • 国防部:中方将参加“安全纽带

      那更高端的产品,卖得更贵,不就顺理成章了吗?
  • 贵金属投资中超短线交易要点

      压岁钱拿了多少?年终奖也没少拿吧~随着新年假期的结束,各大品牌也盯紧了各位好不容易‘鼓’起来的小钱包,不把你榨干不算完,不过相信对于各位来说,春季新品来袭不消费怎么敢说热爱?所以今儿就来看看最近有什么值得你购买的吧~
  • 力挺TikTok?特朗普:Facebook才是美国人的敌人

      JeffWilliams,苹果首席运营官
  • 中央经济工作会议讨论啥

      据加密货币分析公司KaikoResearch,比特币创纪录的涨势似乎每天都在创造大约1,500个新的“百万富翁钱包”。这些钱包是比特币区块链上的数字地址,用户可以在其中存储加密货币。由于网络是公开的,不受任何中央中介机构控制,因此可以访问诸如钱包持有的代币数量之类的数据。然而,这些地址是匿名的,这使得很难区分它们是否由个人或实体控制。
  • 科学家找到一类全新的脑细胞,少了它可能会脸盲!

      (小风)声明:新浪网独家稿件,未经授权禁止转载!