免费精品综合导航👅_常用英语口语大全-艺文笔记

王金豹 2025年11月08日 08:45:10
发布于:曼谷

免费精品综合导航👅_常用英语口语大全_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
3 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 湖人冲突内讧问题解决!带头喷沃顿的主动道歉

      根据上述公告,回购的目的包括股权激励、员工持股计划、注销等。
  • 银河期货:豆系等待政策指引 期间陷入震荡

      (声明:本文仅代表作者观点,不代表新浪网立场。)
  • 尾盘强势拉升 期指氛围仍偏多

      何赛飞自评是特别在乎别人看法的人,别人对自己的肯定总会让她特别欢喜,这或许是跟自己缺乏安全感的童年经历有关。无论是在拍摄现场导演的认可,还是观众的喜爱,奖项的垂青,在她看来都同样重要。
  • 国庆北京首贼大兴落网 身藏6部手机数张银行卡

      中国式现代化借鉴吸收一切人类优秀文明成果,倡导不同文明交融互鉴、多元共生,有利于形成共建美好世界的最大公约数。中国主张平等、互鉴、对话、包容的文明观,世界各国弘扬和平、发展、公平、正义、民主、自由的全人类共同价值,以文明交流超越文明隔阂,以文明互鉴超越文明冲突,以文明共存超越文明优越,为世界文明朝着平衡、积极、向善的方向发展提供助力。从首倡亚洲文明对话大会,搭建亚洲乃至世界文明交流互鉴的重要平台,到践行和平合作、开放包容、互学互鉴、互利共赢的丝路精神,努力把“一带一路”建设成文明之路,再到成功举办冬奥盛会,将一段段美美与共的文明交流互鉴佳话载入奥运史册……中国始终是文明交流互鉴的倡导者、实践者。乌兹别克斯坦学者乌卢格别克·哈桑诺夫认为,中国式现代化将为推动中外文明交流互鉴创造更多机遇和条件,为世界带来更多稳定性和确定性。
  • 设计趋势人物丨朗联RONGOR秦岳明:以“理”服人的行动派

      据报道,在这种炸弹与“龙卷风”多管火箭炮联合使用的情况下,将其喷气发动装置与“龙卷风”对接,满负荷装填并痛击敌人,实际上与发射火箭弹相当。
  • 有效需求不足将给宏观政策带来极大挑战

      针对人们诟病的主要内阁成员在脱欧问题上立场分歧多多,特雷莎·梅肯定现任政府内阁成员的团结和努力,表示,现政府会凝聚共识、履行职责、实现承诺。就人们最关心的脱欧谈判,特雷莎·梅说,处理好脱欧谈判是她的政府首要责任,她向居住在英国的300万欧盟移民承诺:即将签订的协议将保障他们在英国合法居留的权利。喜剧演员递给特雷莎梅的解聘书
  • 人脸识别“双刃剑” 我们还能否光膀子打游戏?

      商会监事会主席、梦天家居董事长余静渊认为,《意见》紧扣民营经济发展的难点、痛点和堵点,《措施》强调了家居行业是促消费、稳增长的重要力量,要抓住发展机遇,协调各方资源,加强人才培养,加快转型升级,并且在承担社会责任上走在前列。
  • 媒体辨析民营经济促进法:“促进”并非倾斜,保障公平是核心

      二、本次限售股形成后至今公司股本数量变化情况
  • 磷酸三(二甲苯)酯 TXP商品报价动态(2024

      张女士说,1月24日和28日,孩子分别上了两次课,之后她就收到了该培训机构倒闭的消息。2月3日,艺境林(天津)培训学校有限责任公司(蕃茄田艺术)发布公告称:由于公司经营不善,自2024年2月3日起,本中心停止运营,不再提供教学服务,后续将通过转课的方式以减少家长的损失。
  • 秋冬必备 叠涂眼影打造眼部的立体感

      自2024年2月27日至2024年3月11日,公司股票已有十个交易日收盘价格低于当期转股价格的85%。若未来连续二十个交易日内有五个交易日公司股票收盘价格继续低于当期转股价格的85%,将可能触发“晶能转债”的转股价格修正条款。
  • 汪涛:预计央行今年不会提高基准利率

      2月,新能源汽车产销虽较为罕见地出现同环比双降的局面,但超过三成的市场占有率仍让这一市场成为车市重要增长极。
  • 调查显示第一份工作毕业生最看重薪资和行业

      对比之下,AppleWatch也就仅比三星晚了两三年的时间。据钛媒体App不完全统计,2023年国内一共有7家品牌发布了13款折叠屏产品,包括左右折以及上下折,头部品牌中也就苹果还未发布相关产品。