国产自拍👅_琦琪手机-艺文笔记

王金豹 2025年11月08日 06:53:42
发布于:曼谷

国产自拍👅_琦琪手机_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 S 494-013-N00  (1)   Install the PWA 85677 handling bracket on the front flange of the front fan case (24) at the 12:00 o'clock position.

 (2)   Attach the hoist to the handling bracket.

 (3)   Lightly put a load on the hoist to keep the fan case (24) on the same horizontal centerline as that of the engine.

 (4)   Remove the brackets (12, 14, 15, 20, 22, 46, and 47) from Flange B as follows:

 (a)   Remove the bolts (18), washers (19 and 23), spacers (17 and 21), and nuts (16) that attach the brackets (12, 14, 15, 20, 22, 46, and 47) to Flange B.

 NOTE: Before you remove the brackets, put marks on the fan ____ case to make a record of each bracket's position and location. This will help you install them.  (b)  Remove all of the brackets (12, 14, 15, 20, 22, 46, and 47).  S 034-017-N00  (5)  Remove the remaining bolts (18), washers (19 and 23), spacers (17 and 21), and nuts (16) from the rear (Flange B) of the front fan case (24).  EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-01  ALL  ú ú N04 Page 411 ú Jun 10/93 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. ////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL //////////////////////// S 034-018-N00  (6)   Remove the front fan case (24) from the engine as follows:

 (a)   Lightly hit the flange with the fiber mallet to loosen the fan case (24).

 (b)   With the hoist, remove the front fan case (24) from the engine.

 (c)   Put the front fan case (24) on the pallet with the rear flange down.

 (d)   Remove the hoist and the handling bracket from the fan case.

 S 034-019-N00  (7)   If you will install a new fan case, do the steps that follow:

 (a)   Remove the two bolts (26) that attach the mounting pad (25) of the vibration accelerometer to flange A at approximately the

 1:00 o'clock position.  (b)  Remove these brackets (10, 11, 32, 37, 38, 39, and 41) and the seven (27) brackets from Flange A1 as follows:  NOTE: Put marks on the fan case for the bracket positions and ____ locations before you remove them. This will help you install them.  1)  Remove the bolts (28), washers (5, 29, and 30), and nuts (31) that attach the seven brackets (27), and the brackets (32 and 38) to Flange A1.  NOTE: These are at approximately the 11:30, 11:45, 12:00, ____ 1:00, 1:30, and 2:30 o'clock positions.  a) Remove the bracket (32) and the seven (27) brackets from the front fan case (24). 2) Remove the bolts (33), washers (34), and nuts (35) that attach the brackets (10, 39, and 41) to Flange A1.  NOTE: These are at approximately the 1:30, 2:00, and 3:00 ____  o'clock positions.

 a)  Remove the brackets (10, 39, and 41) from the fan case (24).  NOTE: Bracket (41) includes the tee and the ____ flex hose (40) attachment.  3)  Remove the bolts (36), washers (5 and 29), and nuts (31) that attach the brackets (11, 37, and 38) to Flange A1 at approximately the 1:45 and 2:00 o'clock positions. a) Remove the brackets (11, 37, and 38) from the front fan  case (24).  EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-01  ALL  ú ú N03 Page 412 ú Feb 15/99 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. TASK 72-33-01-404-020-N00  3. Install the Front Fan Case __________________________  A. Special Tools and Equipment  (1)   PWA 85667 - Handling Bracket, Pratt & Whitney, Commercial Products Division, 400 Main Street, East Hartford, CT 06108

 B. Standard Tools and Equipment

 (1)   Hoist - Code 2504, 1 ton capacity, 28 foot lift, standard hand chain with safty hooks, C & M Hoist Division Columbus McKinnon Corp., Tonawanda, NY 14150, or equivalent

 (2)   M303, M305, or M307 Gergen Mechanical Crimper  Bergen Cable Technologies Inc   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 发动机 ENGINE 2

原标题:
86 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 马棕油录得第三周上涨,可能上探4106

      新浪旅游整合门户与微博资源,为旅游者提供个性化、定制化和社交化的出行服务,为行业客户提供全面的营销解决方案。
  • 期市齐跌:原油螺纹再探新低 空头情绪笼罩市场

      问:教育事业的发展,可能是一场“持久战”。对于当下正在因为学业而挣扎的学生和家长,您有什么建议吗?
  • 西班牙女演员在印度遭7人施暴

      3、公司2019年-2022年年度股东大会分别审议通过了《2019年度利润分配预案》、《2020年度利润分配预案》、《2021年度利润分配预案》、《2022年度利润分配预案》,公司董事会经公司2019年第一次临时股东大会的授权,根据《上市公司股权激励管理办法》、公司《2019年股票期权激励计划(草案)》及相关规定,对股票期权行权价格、数量进行相应的调整。
  • 期指三大合约联袂上涨 IC合约贴水大幅收敛

      可以选择按簇粘贴的假睫毛,补充在睫毛稀疏的部分,然后用镊子蘸取少量睫毛膏,将真假睫毛夹成根根分明的一体状态。
  • 期指震荡行情或重启

      界面新闻发现,自3月6日开始,投资者开始到互动平台追问相关公司“超聚变数字技术有限公司(简称”超聚变“)借壳上市”事宜。
  • 1.77万亿、2.7万、2.6亿!新疆人权事业取得历史性成就

      调研组严格按照抽样调研的原则,选择代表性的家装企业进行深入考察,并与企业负责人、项目经理、施工人员等进行充分的交流。调研组还重点了解了企业的质量管理体系,包括工艺标准、材料选用、施工流程等方面的具体表现。
  • 形势仍未改变,黄金年底前依旧看涨

      惭愧,即要对自己罪业深重,无有出期,生可惭可愧可羞可耻之心。恐怖,即自己起心动念无不是业,以是因缘命终之后必堕地狱、畜生、饿鬼受无量苦,由此应生起恐惧之心。厌离,即对生死轮回、众苦交煎生起厌烦心、出离心。
  • 联通致歉!解约应届生只因超过24岁,知情人称基层分公司HR“不专业、决策想当然”

      本次试验于6月12日开始,截止到6月13日下午,共进行了28次微重力、2次月球重力和2次火星重力飞行,搭载的两套装置分别对陶瓷材料和金属材料进行了预先计划的制造任务,共获得10件陶瓷样品和8件金属样品。
  • 全球市场应减少对货币政策的依赖

      (4)从展示、营销、推广角度而言,大店模式是一种尝试和探索,部分开设大店的装企在业绩上也取得了成果,但大店的运营成本、管理、坪效是装企肩上难以有效解决的沉重负担,店开的再大,也只是建材、家居产品的卖场复制,而且是小规模复制,开出像传统卖场一样的数万、十数万甚至数十万平米的大店,如果没有商业模式、产品模式、服务模式的根本性改变,大店的价值需要深思。
  • 黄金饰品降价迎国庆 期盼销售旺季

      直到现在,俞维美仍坚持每日锻炼,天津乐境为她提供了充足的活动空间。俞维美每天都去健身房:“健身房原来人来得很少,现在人多了,大家不会的地方互相教,每天上午基本都满了,每天锻炼还是很好。健身房的仪器也很多。”此外,俞维美也经常参加乒乓球、冰壶、篮球等运动,日常生活丰富多彩。
  • 潮州古城墙上被涂鸦 这种不文明行让不少市民直摇头

      (小风)声明:新浪网独家稿件,未经授权禁止转载!
  • 标普指数下跌,或意味贵金属市场迎来春天

      2024年春节假期(2月10日-2月17日)民航市场平稳有序运行,全国民航累计运输旅客1799.2万人次,日均运输旅客224.9万人次,创历史新高。
  • 57.1%的人有脱发危机 秃头非“命中注定”

      “以前国内走出去的企业以大企业为主,如今众多小企业进入了全球市场。背后很重要的创新就是全托管模式,降低了中小外贸企业走向全球的具体业务实操门槛。”对外经济贸易大学国际商务与经济合作学系主任王健认为,中小企业开始广泛参与全球贸易成为目前全球市场变化中最重要的变化。
  • “618”能否激活“买买买”

      原标题:‘RedTights’正成为辣妹冬日造型首选?