天堂岛精品🔇_久久久黄色精品毛片🧎‍➡️-艺文笔记

王金豹 2025年12月24日 14:35:33
发布于:曼谷

天堂岛精品🔇_久久久黄色精品毛片🧎‍➡️_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 5. Close-up ________  Subtask 31-55-34-410-050  A. Close Access  (1) Make sure that the work area is clean and clear of tool(s) and other items. R (2) Close the access door 824 (Ref. TASK 52-41-00-410-002).  (3) Remove the access platform(s).  1EFF : ALL 1 31-55-34Page 407 1 1 Nov 01/01 1 1 1CES 1 ECAM CONTROL PANEL - DESCRIPTION AND OPERATION

______________________________________________  1.  General

_______ (Ref. Fig. 001, 002) The ECAM control panel (ECP) is a means of dialog between the flight crew and the ECAM system computers. It is located on the center pedestal, in front of the SWITCHING panel.

 2.  Functional Description

______________________  A. General When a key is pressed on the keyboard, the ECAM control panel puts the corresponding bit on the output bus. It will only illuminate the light located in this key when the order from the DMC is received ; and it presents the DMC with the on light configuration by a label on its bus, lighting depending on the status of the DIM and LIGHT-TEST discretes.  B. Logic The ECP comprises an acquisition part, a processing part and a transmission part. The ECP keyboard is divided into two parts, one relating to the warning keys (CLR 1 and 2, STS, RCL, EMER CANC, TO-CONFIG), the other relating to the system keys (HYD, ELEC, COND, F/CTL, ALL, APU, PRESS, ENG, FUEL, WHEEL, BLEED, DOOR). The keyboard is connected to a discrete acquisition interface which also receives the DIM and LIGHT TEST aircraft discretes. The acquisition part also processes two high-speed ARINC 429 buses from the Captain and First Officer DMCs. The illumination commands of the lights are found on these buses. The processing part performs the good operation tests of the ECP. It takes the acquisition results into account to determine :  - the lights to illuminate

 - the data to be transmitted on the output bus. The output bus has the data relevant to the warning keys on label 270 (the corresponding bit remains at one while the key is pressed or for eight label transmit periods). In the same way, label 271 contains system key information with the same coding condition as for the warning keys; and label 272 presents the lights configuration and the status of the LIGHT-TEST and DIM discretes to let the FWCs check the ECP. If label 275 is not received by the DMCs, label 272 is sent by the ECP with its SSM in No Computed Data. Moreover, the ECP output bus presents labels containing data relating to the self-test results. The power supply board is also monitored and supplies data concerning its operation: this data is put on the output bus, and is available on labels 155 and 156.

 1EFF : ALL 1 31-56-00Page 1 1 1 Feb 01/98 1 1 1CES 1

 ECAM Control Panel  Figure 001  1EFF :  ALL  1  31-56-00 Page 2  1  1  Feb 01/98  1  1  1CES  1

 ECAM Control Panel - Electrical Definition  Figure 002  1EFF :  ALL  1  31-56-00 Page 3  1  1  Feb 01/98  1  1  1CES  1

 For the FWC, the output bus presents two labels coding the ECP software part-number and hardware part-number so that they can be transmitted to the CFDS when the CFDS asks for them. This data is found on labels 160 for the hardware P/N and 161 for the software P/N. One stage of some keys is directly wired to the connector to ensure availability of the main ECP functions ; these keys are : the CLR, STS, RCL, EMER CANC warning keys and the ALL key providing warning management and system page display, in case of power supply failure or CPU failure. ECP Output bus This comprises the labels :  -270 (keyboard warning key status)  -271 (keyboard system key status)  -272 (lights and discretes status)  -161 (ECP software P/N)  -160 (ECP hardware P/N)  -155 & 156 (self-test results). ECP Input bus This bus from the DMCs contains a discrete label (275) in High-Speed ARINC 429 format. This label controls illumination of the ECP lights. A bit is associated with each light on this label (See Table). Nevertheless, as the ECP CPU receives two of three DMCs it must be ensured that the data received from the DMCs is consistent. This is done through the two bits of label 275, as per the following table :  --------------------------------------------------------------------------| CODE | Bit No.28 | Bit No.29 | DMC meaning | |------------|-----------------|-----------------|-----------------------| | 2 | 0 | 0 | Mono display | |------------|-----------------|-----------------|-----------------------| | 1 | 0 | 1 | Manual STS or systems | | | | | or Advisory | |------------|-----------------|-----------------|-----------------------| | 3 | 1 | 0 | Engine/Warning | |------------|-----------------|-----------------|-----------------------| | 3 | 1 | 1 | Automatic STS or | | | | | systems | --------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 7

原标题:
16 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 求偶太用力反而易灭绝?两性异形差异较大灭绝率更高

      在最新的Steam秋季促销活动后不到一周,Valve的新活动继续推进PCVR游戏更新。继SteamVR2.0于今年10月全面发布并推出全新UI和附加功能后,上周Valve在Quest上推出了一款免费的SteamLink应用,让Quest系列头显能够更方便地与Steam进行无线串流。
  • 明年股指期货市场趋势分析 期指交易进一步正常化

      所以,针对我在调研中发现的中小学生心理健康问题责任分担不明晰、未成年人心理咨询行业管理不规范、缺乏未成年人心理健康社会化服务体系等问题,今年两会我提出了三条建议:完善学生心理健康问题学校、家庭、社会的责任分担机制;加强未成年人心理咨询行业监管;构建未成年人心理健康“家校医社”联动服务机制。
  • 能否请人代为诵经祈福

      江淮瑞风RF8拥有两种动力模式,首先是2.0TGDI+8AT,能输出最大功率186kW,最大扭矩400N·m。另外就是今天的主角,也是大家十分关注的插混系统,1.5TDGIDHE+3DHT,最大综合功率310kw,最大综合扭矩745N·m,零百公里加速7.3s。其中1.5TDGIDHE发动机热效率44.26%,这套混动系统能实现三擎模式、增程模式、纯电模式、串联模式,整个动力系统的参数在这个级别中,属于第一梯队了。
  • 选用细软秀发 漂亮眉型“种”出来

      据多家外媒报道,知名女星娜塔莉·波特曼与老公本杰明·米派德去年7月提交离婚申请,并于上个月在法国正式离婚,目前这一消息也得到了娜塔莉方面的证实。据悉,两人因拍摄《黑天鹅》相恋,婚后育有一双子女。
  • 疫情封控下的健身教练,在直播间圈粉?

      一位长期关注生物医药行业人士告诉财经·大健康,CRO为创新药等行业提供服务,也就难免依赖于此,创新药火,CRO就火。反之,创新药行业有多低迷,那CRO也就会遭遇这种低迷,“双方可以说共生共赢,甚至是被动的一个产业形态”。
  • 王永利:中国金融大变革方能大发展

      LOOK:10阿玛尔-克鲁尼
  • 女霸总亮相 关晓彤戴墨镜穿黑西装又酷又飒

      编辑缪晨霞校对付春愔关键词:加载中点击加载更多
  • 陈云波:英内阁批准脱欧协议草案 准备议会过审

      北京走访调研共涉及16个小区,33个工地,与22位项目经理、26位现场施工人员、9位业主进行了全方位交流,从施工现场实际呈现的能力和水平来看,北京家装行业施工交付能力20年来的进步甚微,施工现场管理,施工交付工期,施工工艺,施工人员来源及管理,施工工具,施工材料及运用,施工成本管理,全方位几乎裹足不前。除屈指可数的企业在施工交付端具备一定的相对优势之外,绝大部分装企的施工工地,即使是与传统施工队(包工头)工地放在一起,也鲜有优势和特点可言。
  • 首批中证A50交易型开放式指数基金今天上市

      此款作品机芯总共包含168个部件,还搭载别具一格的LV104手动上链机芯,连最小的齿轮都由工匠手工打磨。其组装耗时超过120小时,动力储备达80小时。
  • 蛋壳公寓惊险闯关40天:谁在说谎 谁在妥协?

      你可能会想,别管脸圆不圆,上镜瘦就行。对,但不够准确。
  • 厨房空调该怎么选?

      第一节,江苏打出9-2的开局,青岛也很快进入状态,鲍威尔飞身上篮命中,赵嘉义打成2+1,杨金蒙突袭得手,赵嘉义三分开张,青岛一波17-2的攻击波反超比分。张稀然后仰跳投入网,蒋浩然打成2+1,江苏咬住比分,第一节青岛28-22领先。第二节,青岛逐渐将领先优势扩大到两位数,并牢牢掌控场上局势,江苏命中率明显下降,单节只得到16分,青岛50-38领先。
  • 阿维塔11千里智驾款上市 限时售价25万起

      主要特点:头戴宝冠,顶有佛像。手持净瓶杨柳,或执莲花、法轮等。菩萨像形象变化比较多,常有三面、十一面,手臂则有二、四、八、十八、二十八、四十八臂等,均是千手千眼的象征。