免费精品综合导航👅_成人WWW色情在线观看-艺文笔记

王金豹 2025年12月24日 06:44:48
发布于:曼谷

免费精品综合导航👅_成人WWW色情在线观看_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-00-00-810-801  Display of an Operational Warning on the Upper ECAM DU

 1. Possible Causes _______________  - Message on the Post Flight Report (PFR)  2. Job Set-up Information

______________________  Not Applicable

 3. Fault Confirmation

__________________  A. Test  Not applicable, no confirmation test is necessary.

 4. Fault Isolation _______________  A. Do a check for a Message on the Post Flight Report (PFR).  If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message.  NOTE : Some operational Warnings are not printed on the PFR. ____

 AILERON - FAULT ISOLATION PROCEDURES ____________________________________  TASK 27-10-00-810-801  Loss of Signal on the Left Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, L (25CE1)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201  May 01/00 CES (2) If the fault continues:

 - do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23).  B. Do the operational test and the BITE test given in Para. 3.

 Loss of Signal on the Right Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, R (25CE2)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:

 - replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 1

原标题:
23 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 华西都市报:排球搞真职业化让女排先行

      (文中观点仅供参考,不构成投资建议,投资有风险,入市需谨慎。)
  • 突然暴涨!又创历史新高

      “与此同时,中小型制造企业近年来依托于国内制造业红利快速成长,但由于外需不旺、同质化竞争等原因,代工的利润空间不断被压缩。不少中小型制造企业都急需拓展新的外贸渠道以及减少中间环节,提升跨境商品销售量和利润率。”上述拼多多相关负责人表示。
  • Steam VR Fest 开启:多款 PCVR 游戏打折促销

      张女士提供的后续转课方案显示,蕃茄田艺术称,在与教育局多方协调争取后,联系了多家经营稳定的教培机构进行转课消课,涉及绘画课程的都需要额外支付材料费,大多数材料费是20元/课时,最高60元/课时。该方案还明确表示因公司资金缺口太大,确实无力退费,但会积极为家长们办理转课事宜。
  • 布雷迪=乔丹!也许更强 NFL史上最佳这次没争议了

      习近平总书记强调,建设金融强国需要长期努力,久久为功。必须加快构建中国特色现代金融体系,建立健全科学稳健的金融调控体系、结构合理的金融市场体系、分工协作的金融机构体系、完备有效的金融监管体系、多样化专业性的金融产品和服务体系、自主可控安全高效的金融基础设施体系。由此可见,金融强国建设具有很高的标准和要求,不可能一蹴而就,需要长期开展一系列专业且艰苦的工作。金融强国建设目标是纲,各项任务是目,纲举必须目张。金融强国建设的核心任务是推进金融高质量发展。
  • 知名女星官宣离婚,结束11年婚姻

      朱厚举|不同阶段面临着不同机遇与挑战
  • 孟晚舟案件法官未同意引入新证据的申请

      更重要的是,Agent的应用往往要与不同的产业领域、应用场景相结合,这就与前面提到的垂直化趋势深度相关。
  • 广东男子送爱车到4S店维修 车竟然被卖了

      上述方案须经出席会议的股东所持表决权的三分之二以上通过方可实施。股东大会进行表决时,持有本次发行的可转换公司债券的股东应当回避。修正后的转股价格应不低于该次股东大会召开日前二十个交易日公司A股股票交易均价和前一个交易日公司A股股票交易均价。
  • 伊万科维奇:无论新老 还是归化球员都必须证明自己

      2、游客没打过新冠疫苗也可以入境旅游,工作签证需要。
  • 这两个最新动向,让人瞠目结舌

      同时,社区绿化覆盖率较高,社区内栽种的柿子、山楂等果树可供老人进行采摘与手工制作糖葫芦、柿饼等活动,还为鸟类提供了充足的栖息环境,吸引了很多鸟类在社区内安家,打造出人与自然和谐共生的宜居环境。
  • 杰弗里·萨克斯:美国的增长幻觉

      (一)增资子公司基本情况
  • 全球经济增长担忧升温 黄金获得避险买盘追捧

      在民警耐心询问下,静静吐露实情。静静称,她的这个微信号从2017年开始就交给自己的男友贾辉使用,而贾辉似乎后来又把微信号和密码告诉了董苏。
  • 不同肤质如何补水

      北京时间2月6日,洛杉矶湖人客场以94-136惨败于印第安纳步行者。值得一提的是,半场结束时湖人已经落后于步行者23分。而在比赛中,当英格拉姆罚球的时候,现场的球迷都在朝他大喊:勒布朗要把你交易了。
  • 中信银行:创新发布乡村振兴“1+5+N”综合服务方案

      大金塔前有棵菩提树,看起来貌不惊人,却是棵圣菩提树,是佛祖释迦牟尼圆寂的那株伽耶圣树的根苗。2005年10月25日,三棵凝聚中斯两国友谊的圣菩提树苗被赠送与云南,一棵安奉在西双版纳大佛寺,一棵在昆明圆通寺,第三棵就种植在勐焕大金塔前,很是珍贵。
  • 苹果iPhone 15 Pro/14 Pro机模对比:近20年历史的静音拨片没了

      二、通过深交所交易系统投票的程序
  • 秦季章:营业网点运营管理改革

      优秀的带货主播总是会有一些传说,薇娅曾自曝每天只睡4-5个小时;李佳琦也累到边直播边睡觉。贾乃亮则连续坐在镜头前直播12个小时,脖子上贴着膏药来吆喝直播。