国产自拍👅_熟女在线一区二区三区四区不卡免费视频-艺文笔记

王金豹 2025年11月06日 14:54:57
发布于:曼谷

国产自拍👅_熟女在线一区二区三区四区不卡免费视频_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 49-23-51-865-059  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.  Subtask 49-23-51-710-051  C. Do the operational test of the APU (Ref. TASK 49-00-00-710-008).  (1) Do a check for leaks on the inlet guide-vane actuator and the fuel tube connections.  NOTE : Leaks are not permitted. ____  5. Close-up

________ Subtask 49-23-51-410-052  A. Close Access  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Set the LIGHT control switch 11LJ to the off position.

 (3)  Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (4)  Remove the access platform(s).

 (5)  Remove the warning notice(s).

 TASK 49-23-51-710-001  Push/Pull Test of the Inlet Guide Vane Mechanism (8014KM) (APS 3200)  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION  ------------------------------------------------------------------------------- No specific axial-scale measuring device  No specific circuit breaker(s) safety clip(s)  No specific access platform 2.5 m (8 ft. 2 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 49-11-11-000-003 Removal of the Power Plant (APU) (APS 3200) 49-23-51-000-003 Removal of the Inlet Guide Vane Actuator (8014KM)  (APS 3200) 49-23-51-400-003 Installation of the Inlet Guide Vane Actuator  (8014KM) (APS 3200) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access  3. Job Set-up __________  Subtask 49-23-51-860-055  A. Aircraft Maintenance Configuration  (1)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.

 (2)  Put a warning notice in the cockpit to tell persons not to start the APU.

 (3)  Make sure that ground fire extinguishing equipment is available.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-23-51-865-062  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-23-51-010-057  C. Get Access  (1)  Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)  Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________ Subtask 49-23-51-710-052  A. Test of the Inlet Guide Vane (IGV) mechanism (IGV Actuator installed)  (1)  Pull the IGV mechanism manually to the OPEN position.

 (2)  Disconnect the quick-disconnect pin from the clevis of the IGV rod.

 (3)  Push the IGV mechanism manually back to the CLOSED position. NOTE : A sign of a serviceable IGV mechanism is a smooth and easy

____  movement of the IGV rod.

 (4)  Engage the axial-scale measuring device through the ring of the quick-disconnect pin.

 (5)  Put the quick-disconnect pin back to the clevis of the IGV rod.

 (6)  Measure the load necessary to pull the IGV mechanism back to the OPEN position. Make sure that the maximum load is not more than 11.3 daN (25.4034 lbf).

 (a)  If the measured load is lower than the maximum load:

 -IGV mechanism is serviceable.

 (b)  If the measured load is higher than the maximum load:

 - remove the APU (Ref. TASK 49-11-11-000-003). Subtask 49-23-51-710-053

 B.  Test of the Inlet Guide Vane (IGV) mechanism (IGV Actuator removed)

 (1)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER4

原标题:
81 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 弘一:振兴近代律宗的一代宗师(组图)

      其他市场面,纽约商品交易所黄金期货市场交投最活跃的4月黄金期价11日上涨3.1美元,收于每盎司2188.6美元,涨幅为0.14%。当天,5月交割的白银期货价格上涨16.6美分,收于每盎司24.715美元,涨幅为0.68%;4月交割的白金期货价格上涨25.7美元,收于每盎司940.5美元,涨幅为2.81%。
  • 消失了15年的南汽,曾是中国最会创业的车企

      从试点到扩容,跨境电商作为新型国际贸易方式,与一般贸易、加工贸易共同构成中国三大贸易方式,已是第十一次被写进政府工作报告。
  • 国际金价连续刷新纪录,静待今晚非农数据

      去年6月,蔚来通过调整新车和换电权益的绑定的方式,全系新车起售价普降3万元。
  • 江苏立法反对丧偶式育儿:拒绝辅导孩子或记入征信

      均订(每个章节的平均订阅)是衡量网文作者成绩好坏的一个重要指标。网文作者收入结构一般为:订阅分成+平台其他补贴(全勤奖)+用户打赏。其中,订阅分成占大头,作者的收入跟读者订阅量直接挂钩,订阅越多,作者收入便越高。通常,三万均订的作者如果日更新4000字,年收入可在百万元左右。
  • 东契奇再三双独行侠胜活塞 KD45分太阳负绿军

      分析人士表示,适度上调该业务“门槛”,一定程度上提醒投资者关注未来潜在波动风险,有助于市场回归理性,更好落实投资者适当性管理。
  • 我们来到重生工作室总部,体验了APEX的全新赛季

      2017年,公司看中了减肥药的市场潜力。耗资1.38亿元,南下收购中山万汉、中山万远两家公司各51%股权。中山万汉的主要产品是奥利司他,是当时国内唯一用于治疗肥胖症的OTC药品。
  • [新浪彩票]足彩第24038期大势:布莱顿主场防平

      11、国家高度重视,利好政策频出的形势下,家装行业的改变需从自身做起,同时,国家对产业的扶持政策落地,需要充分考虑家装行业的实际发展状况,充分考虑家装行业对满足人民美好家居生活需要的重要价值,务实、客观、针对性、可持续配套各项落地政策。
  • 夏季补水 如何选择合适的乳液

      但是当时得到的回复是,已经没机会再谈了。
  • 任泽平:金融工作会议将传递哪些重要信号

      目前来看,比亚迪海洋网以及王朝网两大销售网络,共已经陆续推出了10款荣耀版车型,并打响了“电比油低”的口号,在众多荣耀版车型“降价增配”的刺激之下,比亚迪3月份的市场销量有望迎来全面回暖。
  • 微商区块链成诈骗新马甲 日均新增传销平台约30个

      ③家装施工交付与全国的普遍状态相比大致相同,施工交付依然是制约家装行业取得创新性发展的最大掣肘
  • 股指期货交易恢复常态化或逐步实现

      中国是个人情社会,一个经销商能够独霸某一个区域内的生意往来,除了拥有超强的个人能力和商业手腕之外,在当地一定也有稳定的政商关系。
  • 新中产家庭消费与理财报告:26%家庭年终奖预计超5万

      (声明:本文仅代表作者观点,不代表新浪网立场。)
  • 任泽平:德国供给侧改革是怎么干成的?

      卖惨和抱团,是前夫哥在直播上的唯一出路吗?未必。就在前夫哥们报团取暖、卖惨上热搜的时候,同样因婚姻问题屡屡获得关注的前夫哥贾乃亮已经离婚六年、直播四年,往事早已耗尽,直播却做得风生水起,甚至超过了风头最胜的董宇辉和小杨哥,以一周带货2亿+的成绩位于抖音带货周榜第一。
  • 北京、兴业等多家银行放贷后傻眼,董事长连带老婆、老父亲及弟弟失联了

      也许,不再在自家发布会上特意播放别人家车的碰撞测试,就是一个好的开始。海量资讯、精准解读,尽在新浪财经APP
  • 美国FTC提起诉讼 欲阻止微软收购动视暴雪

      张女士称,事发后,她查阅资料发现,2021年10月,教育部、国家发展改革委、中国人民银行等六部门发布《关于加强校外培训机构预收费监管工作的通知》,要求“不得一次性收取或以充值、次卡等形式变相收取时间跨度超过3个月或60课时的费用”。2022年12月,教育部等十三部门印发《关于规范面向中小学生的非学科类校外培训的意见》,新增了一次性收费不得超过5000元的规定,防止一次性收费过多增加资金风险和家长负担。