天堂岛精品🔇_欧美黄片哪里看🥞-艺文笔记

王金豹 2025年11月07日 02:01:06
发布于:曼谷

天堂岛精品🔇_欧美黄片哪里看🥞_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
55 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018年30克熊猫金币价格(2018年03月09日)

      一年多来,AI渐渐变得普通和日常。当巨头们你追我赶扔下新的王炸,AI也在更多不起眼的地方出现,地铁、电梯间、产品海报、软件开屏,与普通人的线上和线下擦肩而过。
  • 非氧化性杀菌剂商品报价动态(2024

      此后,余承东也多次在活动中表示,北汽和江淮的两“界”汽车产品已在开发中。且华为已向智选车模式合作伙伴发出投资华为车BU新公司邀请。
  • 力帆铝业•简佳铝业•方索门窗2023 全球新品发布会隆重召开

      安妮-海瑟薇以独特的商务造型亮相。她的双色西装和长裤,搭配厚重的黑色长和牛仔相接拼的裤子,相当时尚!
  • 机构:关注港股反弹机会

      销量的下滑也在一定程度上影响了近几年的业绩,北汽蓝谷预计2023年归母净利润亏损52亿元至57亿元,扣非净利润亏损57亿元至62亿元。
  • 大乐透10亿派奖首期3月18日开奖 单注可超3千万

      “电报”社交平台“战斗轰炸机”频道写道:“是的,从乌克兰军方的评论来看,这种炸弹的测试相当成功。”(编译/朱丽峰)
  • 孟晚舟案件法官未同意引入新证据的申请

      今日早盘,小米集团-W(HK1810)股价高开后强势拉升,截至发稿,涨9.55%,报14.68港元,市值3685.6亿港元。小米汽车概念股异动拉升,直线拉升触及20CM涨停,、、、等跟涨。
  • 债市风云丨华侨城取消发行“24华侨城MTN003” 富力地产停牌

      参考消息网3月12日报道据法国国际广播电台网站3月11日报道,俄罗斯国防部11日表示,俄太平洋舰队的一舰艇支队已抵达伊朗参加俄中伊三国举行的“安全纽带-2024”海上联合军事演习。俄国防部称,“一支由‘瓦良格’号导弹巡洋舰率领的太平洋舰队支队已抵达伊朗的恰巴哈尔港停泊场”。
  • 2020年美国股市休市安排

      动力方面,五菱缤果PLUS特别搭载了高效能三合一水冷扁线电机,集成度高、体积小,让车辆获得了更大的乘坐空间。其电机最高效率可达97.5%,且效率85%以上的区间占比大于85%,即使在高速、电机过热等场景下,电机也能迅速散热,维持适宜的工作温度,保证充足动力。
  • 大兴中建·玖玥府预计2023年12月16日开盘 装修交付

      给够拳手推广人制作费之后,其余的部分赔了赚了都是他们兜底。所以赛事的版权是SELA说了算。
  • 北向资金加仓!“宁王”久违大涨

      出道组合计二十二人,目前有十一位拍过古装戏。
  • 二手房签约交易前,别忘了先看这篇攻略!

      路透社称,美国《两党基础设施建设法案》已大大提高了美国基建项目中本土钢铁等材料的使用比例。如今,连“油漆、砖头、木材”等一般建筑材料也进入了美国政府的视野。
  • “中字头”飙升,龙头“30cm”涨停

      硅基流动的办公地点在清华科技园内,这里是以前“光年之外”的办公区。1月中旬,《中国企业家》到现场采访时,墙上以及前台的公司铭牌甚至还没来得及变更,它们是中国大模型烈火烹油式创业的见证。
  • 原生家庭的“烂牌”,如何才能不传递给孩子?

      OpenAI的创始人奥特曼在达沃斯公开露面时也提出了类似的看法。他表示,“未来AI的技术取决于能源,我们需要更多的光伏和储能。”
  • 年内银行同业存单发行额近5万亿元 保持量增价涨趋势

      公司控股子公司原则上与其他股东按公司持股比例对参股房地产项目公司提供担保。如根据金融机构要求,公司控股子公司超过公司持股比例提供担保,为进一步防范担保风险,在提供担保后将要求其他股东或者参股房地产项目公司提供反担保,担保公平、合理,不存在损害公司及股东利益的情形。公司控股子公司为参股房地产项目公司融资及展期提供担保,安排专人参与经营管理,严控财务风险。本次公司控股子公司拟对参股公司进行担保不存在与中国证监会发布的《上市公司监管指引第8号一一上市公司资金往来、对外担保的监管要求》相违背的情况。