天堂岛精品🔇_欧美一区婷婷-艺文笔记

王金豹 2025年11月07日 16:07:14
发布于:曼谷

天堂岛精品🔇_欧美一区婷婷_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

The AC ESS BUS is normally supplied from AC BUS 1. It may be supplied by AC BUS 2, via the AC ESS FEED pushbutton . NORMAL : AC ESS BUS is supplied by AC BUS 1. ALTN : AC ESS BUS is supplied by AC BUS 2. FAULT lt : The amber light, and ECAM caution come on, when the AC ESS BUS is not electrically-supplied. Note: In case of a total loss of main generators, the AC ESS BUS is automatically supplied by the emergency generator, or by the static inverter, if the emergency generator is not available. (8) GALY & CAB pushbutton  AUTO : Main galley, secondary galley, in-seat power supply  and IFE  system (prerecorded announcement, telephone system, video/airshow, music …) are supplied. The above-mentioned equipment is automatically shed : In flight : When only ‐ one generator is operating. ‐ On ground : When only one engine generator is operating. (All galleys are available when the APU GEN or EXT PWR is supplying power.) OFF : The main galley, secondary galley, in-seat power supply  and IFE  system are not supplied. FAULT lt : The amber light, and ECAM caution come on, when the load on any generator is more than 100 % of rated output. A318/A319/A320/A321 FLIGHT CREW OPERATING MANUAL AIRCRAFT SYSTEMS ELECTRICAL CONTROLS AND INDICATORS A318/A319/A320/A321 FLEET DSC-24-20 P 20/44 FCOM 19 AUG 10 (9) EXT PWR pb (momentary action) AVAIL light comes on green, if : ‐ External power is plugged in, and ‐ External power parameters are normal. Pressed momentarily : ‐ If the AVAIL light was on : • The external power line contactor closes. • The AVAIL light goes off. • The ON light comes on blue. ‐ If the ON light was on : • The external power line contactor opens. • The ON light goes off. • The AVAIL light comes on. Note: 1. External power has priority over the APU generator. The engine generators have priority over external power. 2. The ON light stays on, even when the engine generators supply the aircraft. (10) COMMERCIAL pb sw  ON : All aircraft commercial electrical loads are supplied : ‐ cabin and cargo lights ‐ water and toilet system ‐ drain mast ice protection ‐ galley ‐ passengers' entertainment ‐ semi-automatic cargo loading (if installed) OFF: Switches off all aircraft commercial electrical loads. A318/A319/A320/A321 FLIGHT CREW OPERATING MANUAL AIRCRAFT SYSTEMS ELECTRICAL CONTROLS AND INDICATORS A318/A319/A320/A321 FLEET DSC-24-20 P 21/44 FCOM 19 AUG 10 OVERHEAD PANEL (CONT'D) Applicable to: (1) MAN ON pb (guarded) AUTO : When the following conditions are met : • AC BUS 1 is not electrically supplied. • AC BUS 2 is not electrically supplied. • Aircraft speed is greater than 100 kt. ‐ The RAT extends. ‐ The blue hydraulic system drives the emergency generator. ‐ As soon as the emergency generator electrical parameters are within tolerance and the landing gear is retracted, the emergency generator is connected to the aircraft network. Pressed : This selects manual RAT extension. Emergency generator coupling occurs 3 s after the RAT supplies the emergency generator. (2) FAULT lt This light comes on red if the emergency generator is not supplying power when ‐ AC BUS 1 and AC BUS 2 are not powered and, ‐ Nose landing gear is up. A318/A319/A320/A321 FLIGHT CREW OPERATING MANUAL AIRCRAFT SYSTEMS ELECTRICAL CONTROLS AND INDICATORS A318/A319/A320/A321 FLEET DSC-24-20 P 22/44 FCOM 19 AUG 10 (3) EMER GEN TEST pb (guarded) Pressed and held : • If AC NORMAL BUSES are supplied : The EMER GEN is driven hydraulically ‐ if the blue electric pump is running. The AC ESS BUS and the DC ESS BUS are connected to the emergency generator. (The DC ESS SHED and AC ESS SHED buses are not powered.) ‐ ECAM displays the ELEC page automatically (only on the ground). • If only the batteries supply the aircraft : ‐ The static inverter powers the AC ESS BUS. (4) GEN 1 LINE pb sw OFF : GEN 1 line contactor opens. The AC BUS 1 channel is supplied from GEN 2 through bus tie contactors. This is used for smoked drill. SMOKE lt : (Refer to DSC-26-30-20 OVERHEAD PANEL) OVERHEAD PANEL (CONT'D) Applicable to: , , MSN,,,, A318/A319/A320/A321 FLIGHT CREW OPERATING MANUAL AIRCRAFT SYSTEMS ELECTRICAL CONTROLS AND INDICATORS A318/A319/A320/A321 FLEET DSC-24-20 P 23/44 FCOM 19 AUG 10 (1) MAN ON pb (guarded)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320机组操作手册FLIGHT CREW OPERATING MANUAL 3

原标题:
9 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 双宋婚后首度甜蜜合体 乔妹笑呵呵望着夫君好甜蜜

      元UP尾灯以一条贯穿式光带横跨整个车尾,在两侧的造型上呈现“8”字,也像一个莫比乌斯环,代表着一个完整、闭合的循环,如同无穷无尽的“幸运环”,象征生活的圆满和完美。
  • 股海导航 3月8日沪深股市公告与交易提示

      资料显示,项目所在地块位于合肥市肥西县桃花工业园新港南区,占地面积约1500亩,租用肥西新能源汽车智能产业园标准化厂房,购置冲压、焊装、涂装及总装相关生产设备,建设年产20万辆新能源乘用车生产制造基地。项目组成包括:冲焊联合厂房(包括冲压车间和焊装车间)、涂装车间、总装车间、各车间辅房、PDI车间、餐厅、物流门、发车中心等。
  • 林生斌网店生意大起底:累计直播销售额3.2亿粉丝在迅速流失

      在微博曝光之后,“金融小伙伴”发表声明称,“金融小伙伴一直反对明码标价买卖实习的行为,自2017年以来多次在微信号上进行公开反对。出于对我们社群运营和信息宣传工作的认可,部分金融机构与金融小伙伴开展正式合作,举办例如线上宣讲会等相关活动。上述合作纯粹是信息层面的合作与推广,旨在为不能亲临传统线下宣讲会现场的同学们提供一个了解企业和相关岗位的机会。我们郑重声明,从来没有向合作的金融机构进行过任何利益输送。”
  • 美记者爆料:俄乌军方正私下进行和谈,泽连斯基被完全绕过

      另在整车出口前十企业中,奇瑞继续保持高增长态势,2月出口量排名首位,达7.9万辆,同比增长47.9%,占总出口量的21%。长城出口增速最为显著,出口达3.1万辆,同比增长1.2倍。
  • 欧冠女排8强确定 瓦基弗双杀热舒夫锁定最后一席

      来源:广州日报综合自钱江晚报、潮新闻、界面新闻、广州日报往期报道
  • 老艾侃股:中东局势对长期走势影响有限

      坦率来说,外界对于MEGA外观的争议一直存在。而对于一款车到底好看还是难看这件事,终归是众口难调。但放在理想汽车身上,该公司有一个关键问题并没有给消费者解答好,那便是:为何MEGA的起售价要比L9的顶配MAX版还要贵10万元。
  • 大有期货:贸易战持续影响 豆粕持续震荡偏弱运行

      “观看非遗演出、走近传统文化,这个假期过得很有意义。”大年初三,北京游客曹女士带孩子游览了山东邹城市孟庙孟府景区。春节假期,这里推出非遗进景区活动,游客入园就能观看迎宾乐舞、戏曲等演出,还可以体验投壶射箭等传统活动。
  • 单日涨了千亿市值!宁德时代迎来触底反转

      今日上午,雷军微博发布消息,3月28日将举行小米SU7上市发布会。市场预期届时小米SU7价格将正式揭晓。消息发布后,小米集团股价起飞,现涨超8%,小鹏汽车涨超5%。据悉,恒生科技指数ETF()标的指数中小米集团+“蔚小理”的合计权重占比超过了18%。
  • 迎接植树节

      内饰创意很强,很有质感
  • 互联网新时代呼唤互联网新金融

      数字资产的再思考
  • [新浪彩票]足彩第24038期任九:皇马勒沃单3

      假设s1mple在Major后回归NaVi,那么一方面他可以回归ValeriyVakhovskiy|b1t和AndreyGorodenskiy|B1ad3环绕的舒适区,但另一方面他也要承担相应的责任。
  • 利拉德35+11雄鹿力克快船 鹈鹕轻取老鹰4连胜

      “你吃的五常大米真的来自五常吗?”最近,金龙鱼旗下“天赋五常稻花香”产品遭遇了一场打假风波。职业打假人王海质疑其产品质量和来源,相关视频引发广泛关注和讨论。
  • 王永利:万字长文揭盅区块链的八大痛点

      大模型的大规模应用与其算力成本紧密相关。对于模型厂商而言,目前主要的算力成本包括预训练成本和推理成本。除去GPU每秒运算次数和显卡的租用成本这两个常量后,大模型的预训练成本与模型参数量和训练数据的token量正相关,推理成本与模型参数量正相关。而大模型的性能通常与其参数量相关联,而越高的参数量意味着越高的算力成本。因此,如何在同样的算力成本下提升大模型的参数量成了破局的关键。