国内精品♨️_宝宝水好多啊_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell
B. Installation of the Control Handle (1) Remove the cotter pin (30) and discard it, then remove the nut (29) and the washer (28).
(2) Remove the bolt (22) and disconnect the rod (25).
(3) Cut and remove the lockwire and loosen the check nut (32) and fully loosen the bolt (33).
(5) Turn the input shaft until the toothed sector comes against the gearbox.
(6) Put the handle assembly (15) in position in its housing and install the splined connection.
NOTE : With the reduction gearbox in the NORMAL position, turn the ____ input shaft by one notch maximum to make a connection that has no stress. (7) Install the screws (6), the bushes (10), the washers (11) and the nuts (4).
(8) Connect the plugs (14) to the panel (13) and install the panel.
(9) Install the screws (12).
(10) Make sure that the handle assembly is correctly centered in relation to the structure. Subtask 32-33-11-820-051 C. Adjust the NLG free-fall extension system (1) Lock the handle in this position with the shims. (Ref. Fig. 402/TASK 32-33-11-991-001)
(2) Turn the NORMAL position stop-bolt (33) until it touches the internal toothed sector (34).
(3) Tighten the check nut (32) and lock the bolt (33) with lockwire corrosion resistant steel 0.8mm (0.032in) dia..
1EFF : ALL 1 32-33-11Page 409 1 1 Feb 01/04R 1 1 1CES 1
(2) Connect the rod (25) and install the bolt (22). If necessary, do this procedure:
(a) Remove the lockwire and discard it.
(b) Loosen the nuts (23) and remove the washers (24).
(c) Adjust the rod (25) so that you can install the bolt (22).
(d) Tighten the nuts (23) to 0.59 m.daN (52.21 lbf.in) and lock with lockwire.
(3) Install the washer (28) and the nut (29) and safety it with the new cotter pin (32), (30).
(4) TORQUE the nut (29) to between 0.6 and 0.7 m.daN (53.09 and 61.94 lbf.in) and safety the nut (29) with the cotter pin (30).
Subtask 32-33-11-420-052 F. End of Installation (1) Move the casing (8) at an angle and install the screws (7) then tighten them.
(2) Tighten the screws (9).
1EFF : ALL 1 32-33-11Page 410 1 1 Feb 01/04R 1 1 1CES 1
(3) Install the panels (1) and (3) and tighten the fasteners (2).
(4) Install the printer (5) (Ref. TASK 31-35-22-400-001).
(5) Remove the shims from the handle (15). Subtask 32-33-11-865-053 G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 4LF, 15CC, 5CC1, 5CC2, 14CC2, 14CC1 Subtask 32-33-11-720-050 H. Functional Test (1) Do the functional test of the free fall extension (Ref. TASK 32-33-00-720-001). 5. Close-up ________ Subtask 32-33-11-410-050 A. Close access (1) Close the lateral avionics-compartment doors 822, 822. (2) Close the NLG doors (Ref. TASK 32-22-00-410-001). Subtask 32-33-11-942-050 B. Removal of equipment (1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 32-33-11Page 411 1 1 Feb 01/04R 1 1 1CES 1
CUTOUT VALVE - L/G FREE FALL (2515GM) - REMOVAL/INSTALLATION ____________________________________________________________ TASK 32-33-12-000-001 Removal of the L/G Free-Fall Cutout-Valve 2515GM WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6