国产自拍👅_免费的网络舆情网站-艺文笔记

王金豹 2026年01月03日 07:36:05
发布于:曼谷

国产自拍👅_免费的网络舆情网站_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 LUBRICATION - DESCRIPTION AND OPERATION _______________________________________  1. General _______  The lubrication instructions define:

 -Specification of the lubricant to be used  -Points to be lubricated  - Special precautions to be observed.

 A.  Equipment and Materials  Depending on the type of lubrication, use:

 -a grease gun  -an oil can  - a brush

 - a clean lint-free cloth

 B.  Lubricant Specifications The lubricant references are given in the list of materials required for aircraft servicing and maintenance (Ref. ATA 20-31).

 C.  General Requirements

 (1)  Use only clean lubricants and tools for lubrication operations.

 (2)  Before starting any lubricating operation, carefully clean the grease nipples lubricating holes. Lubrication must be accomplished immediately. Check that grease nipples and fitted with ball and spring.

 (3)  Ensure that the old grease exudes through the pressure relief valves and on each side of the spherical bearings (unless the quantity of grease to be used is indicated).

 (4)  After lubrication, remove all surplus grease. Wipe the grease nipple with a clean, lint-free cloth. Check that the ball and its spring are in position.

 (5)  Before lubrication, the wheel bearings should be cleaned. The bearings should be lubricated and installed immediately.

 D.  Lubrication Symbols  (Ref. Fig. 001)  The symbols used represent the recommended lubrication method.  Below each symbol, an index indicates:

 -First term : the lubrication point location  -Second term : the lubricant to be used.

 Lubrication Symbols  Figure 001  1EFF :  ALL  1  12-22-00 Page 2  1  1  Feb 01/98  1  1  1CES  1

 FLIGHT CONTROLS - SERVICING ___________________________  TASK 12-22-27-640-003  Lubrication of Trimmable Horizontal Stabilizer Actuator Ball Screw Nut  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______  START A TASK ON OR NEAR:

 - THE FLIGHT CONTROLS

 - THE FLIGHT CONTROL SURFACES

 - THE LANDING GEAR AND THE RELATED DOORS

 -COMPONENTS THAT MOVE.  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______  GEAR.

 1. Reason for the Job __________________  Refer to the MPD TASK: 274451-01  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific circuit breaker(s) safety clip(s)  No specific container 1l  No specific gun - grease  No specific pin - non-metallic  No specific safety barriers  No specific warning notice  No specific access platform 4.5 m (14 ft. 9 in.)

 B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R Material No. 04-004  USA MIL-PRF-23827 TYPE I SYNTH.ESTER BASED GREASE HIGH PRESSURE (Ref. 20-31-00)  Material No. 19-003  USA AMS 3819  LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 C. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R  24-41-00-861-002  R  R  24-41-00-862-002  R  R  29-23-00-863-001  R  R  R  29-23-00-864-001  R  R  29-24-00-863-001  R  R  29-24-00-864-001  R  31-60-00-860-001  R  31-60-00-860-002  12-22-27-991-003  3. Job Set-up__________

Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU Pressurize the Yellow Hydraulic System with the Electric Pump Depressurize the Yellow Hydraulic System EIS Start Procedure EIS Stop ProcedureFig. 301   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM SERVICING 2

原标题:
69 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 任泽平:美联储缩表速度可能会慢于预期

      京东近日首次公布了“织网计划”的建设成果。以43座“亚洲一号”大型智能物流园区和全国范围内运营的约1400个仓库为核心,搭建起高度协同的多层级物流基础设施和仓配网络,不仅建立了产业端与消费端之间的信赖,助力约90%的京东自营线上订单实现当日达和次日达,以及全国93%的区县、84%的乡镇实现当日达和次日达;织网生态效应通过“亚洲一号”等智能新基建,还帮助众多企业实现了库存管理优化、运营成本减少以及内部资源的高效分配;同时推动区域经济协同发展和县域经济转型,为全国1000多个农特产地和产业带开展了供应链服务,形成产地产业转型与消费升级的正向循环。
  • 汪涛:债务危机风险已经有所下降

      由于需要交高昂的场租、电费以及固定资产的一次性投入和维护费用等,此前丰巢、速递易等快递柜公司便没能实现盈利。
  • 亚马逊股东以微弱优势通过高管薪酬方案:3名高管拿到3.5亿美元酬劳

      党的二十大报告指出,高质量发展是全面建设社会主义现代化国家的首要任务。习近平总书记在学习贯彻党的二十大精神研讨班开班式上再次强调,全面深化改革开放,推动高质量发展,进一步引导经营主体强信心、稳定社会预期,努力实现经济运行整体好转。发展是解决一切问题的关键,高质量发展是以创新为第一动力、协调为内生特点、绿色为普遍形态、开放为必由之路、共享为根本目的的发展,能够充分满足中国式现代化所强调的全体人民共同富裕、人与自然和谐共生、物质文明与精神文明相协调等要求,是走好中国式现代化道路的关键所在。
  • 宣布了!一则大消息,再掀涨停潮!

      经常在微博、小红书、抖音网上冲浪的朋友们,应该都看过这张图。尤其是上面这张将MEGAP成了灵车的照片,堪称这波舆论的“始作俑者”。
  • 汪涛:大气污染治理对经济影响几何

      然后未出道组,拍过古装戏的多些,先挑两位演了多个男主的看一下。
  • 更多地方政府可能放松限购

      比特币的飙升势头尚没有放缓的迹象,刺激市场的“好消息”又来。伦敦证券交易所3月11日宣布,将于2024年第二季度开始接受比特币和以太坊ETN的准入申请,确切日期“将在适当时候”公布。
  • 国贸期货:基本面稳定 矿价有望企稳回升

      右图为全国工商联家具装饰业商会召开全行业学习相关政策文件
  • 林志颖庆祝出道28周年 秀蛋糕晒帅照装扮休闲减龄

      商会常务会长、欧派集团董事长姚良松认为,《意见》的出台为家居消费市场注入了“强心剂”。提振家居行业的整体信心。家居行业要回归消费者的内在需求,深入推进家居供给侧改革以及产业链整合,践行高质量发展。
  • 央行外汇占款与外汇储备并非完全对应

      日前《每日经济新闻》记者实地走访位于北京市朝阳区花虎沟的祥龙博瑞汽车园区内小米汽车2S店时,看到的最新建设进展,“目前店内的墙面粉刷、灯饰安装等工作已经基本完成,店面的内部装潢计划于3月15日前完成。”一位店内装修工人告诉记者。
  • 任泽平:为什么4次降准了但金融形势仍紧?

      沧浪亭的园林布局充分体现了“借景”的设计理念。园内以水为中心,通过曲折的小桥、流水和假山石等元素,营造出一种宁静致远的意境。主要景点包括沧浪亭、翠微亭、曲径通幽处等。其中,沧浪亭是园中的主要建筑,坐落在池塘中央,四面环水,给人以飘渺之感。
  • 午盘:美股继续上扬科技股领涨 英伟达突破900美元创历史新高

      最近几个月,中东地区的武装分子对美国及其盟军发动了超过175次袭击。今年1月,一架无人机在约旦袭击了坦夫基地附近的“22号塔”基地,造成3名美军死亡。本月,胡塞武装在亚丁湾对一艘商船发动导弹袭击,造成3名船员死亡,该船被迫疏散。
  • 调查显示第一份工作毕业生最看重薪资和行业

      对Williams不利的是他的年龄。如果库克在宣布辞职(“宣布将辞职”)十年后离职,他将年满70岁,而Williams将年满68岁,因此这位首席运营官不太可能再长期任职。