免费精品综合导航👅_欧、美、日、韩汽车产业的发展启示-艺文笔记

王金豹 2026年01月02日 00:38:05
发布于:曼谷

免费精品综合导航👅_欧、美、日、韩汽车产业的发展启示_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

/49 As soon as the system pb is released the E/WD returns and the light on the ECAM Control Panel is extinguished. EIS MENU Reconfiguration 29/49 When you are limited to a single ECAM screen the handling of system malfunctions and how you are advised of failures is slightly different. For clarity we will concentrate on the ECAM screen. If an advisory condition arises, the relevant system page is not automatically displayed. Instead the light on the pb switch for the system and a boxed ADV message on the E/WD will flash. EIS MENU Reconfiguration 30/49 If an ECAM warning or caution is triggered then there will be no automatic display of the relevant system page. System pages should be called by manual selection on the ECAM Control Panel. To see this more clearly let’s look at a failure. We will only discuss the one ECAM screen and the selections on the ECAM Control Panel. EIS MENU Reconfiguration 31/49 You hear a single chime and see the MASTER CAUTION light. Cancel the MASTER CAUTION EIS MENU Reconfiguration 32/49 No, to extinguish the Master Caution light, click on the Master Caution pb. EIS MENU Reconfiguration 33/49 No, to extinguish the Master Caution light, click on the Master Caution pb. EIS MENU Reconfiguration 34/49 TThheeMASTTER CAUTTIION iiss eexxttiinngguuiisshheedd EIS MENU Reconfiguration 35/49 When a failure is detected ECAM will give the normal aural and visual indications. On the E/WD the failure message will be displayed and on the ECAM Control Panel the two CLR keys will be illuminated. F/O ND SCREEN F/O PFD SCREEN EIS MENU Reconfiguration 36/49 By looking at the underlined system title you can see which system page needs to be viewed. In this example the FUEL page pb should be selected and held on the ECAM Control Panel. The system page can be studied to provide more information about the failure and then the pb released. EIS MENU Reconfiguration 37/49 The E/WD returns and the ECAM actions can be carried out. We will do these actions for you. EIS MENU Reconfiguration 38/49 EIS MENU Reconfiguration 39/49 Now that the ECAM actions have been completed there is only the failure title remaining. To confirm what effect the actions have had on the system reselect the FUEL page on the ECAM Control Panel. Call the FUEL page. EIS MENU Reconfiguration 40/49 As before the FUEL page is displayed while the pushbutton is depressed. You can see on the system page that the cross-feed is connected and the pump has shut down. EIS MENU Reconfiguration 41/49 As soon as the pushbutton is released the E/WD returns. EIS MENU Reconfiguration 42/49 To continue with ECAM a CLR key should be pressed to remove the failure message on the E/WD. Clear FUEL EIS MENU Reconfiguration 43/49 Normally the Status page would be displayed but with only a single ECAM screen available the STATUS page must be manually selected. Notice that there is a boxed STS symbol on the E/WD. EIS MENU Reconfiguration 44/49 The STATUS pushbutton should be held down and the STATUS page reviewed. The STATUS page can be displayed for up to 3 minutes before an automatic return to the E/WD occurs. EIS MENU Reconfiguration 45/49 EIS MENU Reconfiguration 46/49 Once the review is complete the pushbutton is released and the E/WD returns. EIS MENU Reconfiguration 47/49 The ECAM procedure is now complete. There are no lights on the ECAM Control Panel. EIS MENU Reconfiguration 48/49 During the approach phase there is no automatic call of the STATUS page when the Flap selector is moved. To remind the pilots to review STATUS the boxed STS symbol on the E/WD pulses. The STATUS page should be selected as before. EIS MENU Reconfiguration 49/49 In this module we have looked at various failures associated with the EIS. You will have the opportunity to practice the various failures during the simulator phase. MMoodduulleeCCoommpplleettee NEXT EIS MENU Reconfiguration 50/49 LLIISSTTOOFFSSUUBBJJEECCTTSS EXIT AUDIO GLOSSARY FCOM RETURN DDMMCC11FFAAUULLTT PPFFDDSSCCRREEEENNFFAAUULLTT UUPPPPEERREECCAAMMSSCCRREEEENNFFAAUULLTT BBOOTTHHEECCAAMMSSCCRREEEENNSSFFAAUULLTT ECAM MENU Abnormal Operation 1/38 ECAM MENU Abnormal Operation 2/38 AIRCRAFT SYSTEM SENSORS   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:空客a320飞机概述2

原标题:
44 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 多重因素表明,黄金长期看涨

      医疗配套:楼盘5km(直线距离)内有6个三甲医院,最近的是首都医科大学附属北京天坛医院门诊一部,距离楼盘1882米。
  • “凌晨三点,老婆病危,朋友喊我参加婚礼”

      本次问卷调查覆盖家居全品类,通过新浪家居高效分发系统进行全网用户覆盖,同期入驻主流卖场线下采集消费者调研样本。调查问卷涉及消费者对品牌认知、销售过程评价、安装交付、产品质量、售后服务等6大方面。活动结合专业评审研讨会、企业巡礼等活动,并根据调查结果,发布“2023家居消费者口碑榜”、《2023中国家居消费者口碑蓝皮书》以此对优质消费口碑典型案例及示范企业进行表彰。
  • 汪涛:债务危机风险已经有所下降

      在经历1月开门红和2月同环比双降后,3月车市会走向何方?对此中汽协指出,汽车是工业经济稳增长的“压舱石”,一直以来都得到党中央和国务院的高度重视。今年的政府工作报告中,明确提出要“巩固扩大智能网联新能源汽车等产业领先优势”和“提振智能网联新能源汽车等大宗消费”。
  • 女明星上台前的化妆包里都有什么?

      蛋壳是一个互联网结合租赁业的失败样本,在那之后,也不是所有行业都可以“用互联网再做一遍”了。
  • 美联储“鸽声”令市场欣喜 年末行情能否更进一步

      2022年,在第二届基础学科拔尖学生培养计划2.0“提问与猜想”活动中,上海交通大学致远学院生物医学科学方向(基础医学基地)学生樊继纲的项目“开发端到端的AI加速变构药物设计方法学”获得了特等奖。
  • 纽市盘前:FED唱衰美元欧系反弹,风险厌恶笼罩油价重启跌势

      另外,财联社记者今日在第十四届中国国际储能大会现场采访多位业内人士获悉,尽管面临低价竞争,但业内对今年储能市场快速增长信心明显,均表示一季度订单情况超预期。
  • 曝光!街边2块钱一根的烤肠,到底能不能吃?

      只能说,这网络上真是无奇不有,有的人是真的敢想。
  • 美林设计机构:运营思维驱动全产业链布局

      敢投入的底气源于荷包足够饱满。据媒体统计,自2015年成立至今,蔚来累计融资已超过1150亿元人民币。作为对比,同为造车新势力的小鹏汽车,截至2023年8月的总融资金额为648亿元。
  • 曝光!街边2块钱一根的烤肠,到底能不能吃?

      出道组九个人(NINEPERCENT),目前有三位拍过古装戏。
  • 金银比若跌破81水平,贵金属市场将拥有巨大的上涨空间

      3月6日,有投资者在互动易追问棕榈股份:“贵公司和超聚变控股股东同为河南省财政厅,贵公司此前曾表示不排除上司公司与控股股东进行业务资产整合,请问超聚变会借壳贵公司吗?”对此,棕榈股份回应称,关于公司的经营情况请以公司对外披露的公告内容为准。
  • 头部券商频繁踩雷造假公司 卓锦股份虚增海通证券是否勤勉尽责?

      00后正在成为网络文学作家新增主力军。数据显示,2023年,阅文集团新增作家60%是00后。
  • 11月19日 COMEX 12月期金未平仓合约减少11520手

      一个月的课时补助加起来2000多元
  • 首届互联网共享用车生态链峰会

      王女士对该手镯进行了称重,显示克重尚不足14g,“按照手镯的购买价格核算,每克近1000元,是当天金价的两倍。”
  • 蔚来汽车 CEO 李斌发话,要求全体员工不得参与理想 MEGA 外形舆论

      近日,来自天津的张女士向澎湃质量观投诉平台反映,1月20日,她花费5012元在位于天津的蕃茄田艺术津南永旺校区给孩子报了绘画课程,并于当日签订培训合同。2月3日,孩子仅上了两次课,该机构就宣布因经营不善停止运营,不再提供教学服务。并称因资金缺口大,无力退费,通过转课的方式处理剩余课时,但每节课需额外支付20元至60元的材料费。她希望该机构按照合同退还剩余培训费用,但负责人已经无法联系。
  • 中国正经历增速换挡期最后一跌

      日前《每日经济新闻》记者实地走访位于北京市朝阳区花虎沟的祥龙博瑞汽车园区内小米汽车2S店时,看到的最新建设进展,“目前店内的墙面粉刷、灯饰安装等工作已经基本完成,店面的内部装潢计划于3月15日前完成。”一位店内装修工人告诉记者。