糖心logo官网✅_亚洲在线偷拍🧕-艺文笔记

王金豹 2025年11月05日 13:41:40
发布于:曼谷

糖心logo官网✅_亚洲在线偷拍🧕_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 ELECTRICAL CLOCK - FAULT ISOLATION PROCEDURES _____________________________________________  TASK 31-21-00-810-801  Failure of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)  2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS)  AMM 31-21-21-400-001 Installation of the Clock (2FS)  AMM 31-32-00-740-003 Ground Scanning of the CFDIU

 3. Fault Confirmation __________________  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU CLOCK/NORM/SPLY 6FS F11  **ON A/C 001-049, 051-061, 101-105, 201-203,  121VU CLOCK/STBY/SPLY 4FS N03 R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,  121VU CLOCK/STBY/SPLY 4FS N02 **ON A/C ALL  B. Test Do the ground scanning of the CFDIU (Ref. AMM TASK 31-32-00-740-003).  4. Fault Isolation _______________  A. If the test gives the maintenance message CLOCK:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 201  Aug 01/05 CES

 B. Do the test given in Para. 3.B.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 202  Feb 01/00R  CES  Failure of the Power Supply of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)

 - C/B CLOCK/NORM/SPLY (6FS)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS) AMM 31-21-21-400-001 Installation of the Clock (2FS) ASM 31-21/01  3. Fault Confirmation __________________  A. Test  Not applicable, the fault is evident.

 4. Fault Isolation _______________  A. When the displays go off:  - do a check of the status of the circuit breaker (6FS).  (1) If the circuit breaker (6FS) is closed:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  (a) If the fault continues:  - do a check of the wiring from the clock (2FS) pin A/V to the circuit breaker (6FS) , (Ref. ASM 31-21/01).  1 If there is no continuity: _

 - repair the wiring.  2 If there is continuity:

_ - replace the C/B CLOCK/NORM/SPLY (6FS).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 203  Feb 01/00R  CES  (2) If the circuit breaker (6FS) is open:

 - close the circuit breaker.  (a) If the circuit breaker trips:  - replace the CLOCK (2FS).  1 If the fault continues: _

 - do a check and repair for a short to ground the wiring between the circuit breaker (6FS) and the clock (2FS).  (b) If the circuit breaker stays closed and the fault continues:  - replace the CLOCK (2FS).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 204  Feb 01/00R  CES  Loss of the Bus Output from the Clock Detected by the AFS

 1. Possible Causes _______________  - FMGC-1 (1CA1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 指示和记录系统 1

原标题:
55 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018黄金产融结合论坛成功召开

      听到他们说你不够漂亮,你有怎样的感觉?
  • 29岁女子7年怀孕8次全部流产!

      本次限售股形成后至今,公司未发生配股、公积金转增股本等事项,股本数量未发生变化。
  • 非农前瞻:警惕再次爆出重大意外!35份报告“指点迷津”

      有资深从业者告诉财经·大健康,“主要是被美国针对了,业务上没有什么不正常。”然而,也有人持不同观点,认为既有CRO赛道本身的问题,也有药明康德自身在公司治理方面的纰漏,同时夹杂着地缘政治因素,是多重因素综合作用下的结果。
  • 2016年国企改革可能超预期

      【本文结束】如需转载请务必注明出处:快科技
  • 英伟达深夜暴涨:又创新高!

      文章来源微信公众号:瑞丽网
  • 加息和降息对黄金白银的影响

      其他出道选手就放一起了,几乎都是只演了一部古装。
  • 以色列“狠虐” 叙利亚 纸黄金坐而待曙

      此前,在抖音平台昵称为“极氪编辑部@拓”的极氪车主发布的一条配乐为哀乐的理想MEGA汽车交付视频,引发网友争议。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP
  • 回收铂族金属等于南非挖矿

      各地方政府也在紧跟飞行汽车的脚步推动着相关政策的创新与升温。深圳市除了在《支持低空经济高质量发展的若干措施》中明确提到要加快推动载人飞行汽车等低空航空器产业化发展外,今年2月1日又正式启动实施《深圳经济特区低空经济产业促进条例》,从基础设施、飞行服务、产业应用、技术创新、安全管理等方面对飞行汽车展示出了十分明确的制度性支持维度。成都市政府发布的《关于前瞻培育未来产业构筑高质量发展新动能的实施意见》中也提出要重点培育飞行汽车、新一代无人机、空天动力、商业航天等低空经济新形态。与此同时,广州市所展开的全国服务业试点经验也得到了国家相关部门的支持,不仅商务部印发的《广州市服务业扩大开放综合试点总体方案》明确提出支持粤港澳大湾区开展低空载人飞行器试飞及组网试点,且日前国家发展改革委、商务部、市场监管总局联合发布的《关于支持广州南沙放宽市场准入与加强监管体制改革的意见》中也提出推动电动垂直起降飞行器(eVTOL)和智能网联汽车的紧密连接。
  • 运20年产12架?一照片显示厂方获大突破局面将改变

      1个大型水上乐园,1个溜冰场、1个剧院、6个水滑梯、7个泳池、40个餐厅酒吧
  • 中钢期货:焦炭供需延续紧平衡 单边做多近月可期

      原标题:战“疫”行动,需要平等之光照耀(和音)
  • 奇!拜仁与对手互相传球13分钟 抗议惹事球迷

      江西省交通投资集团有限责任公司公告称,公司于3月8日完成发行“24江西交投SCP002”,债券期限为179天期,票面利率为2%,实际发行规模为15亿元。Wind数据显示,江西省交通投资集团有限责任公司最新主体信用评级为AAA,主体评级展望为稳定。
  • 看中美10年期国债收益率数据 下载新浪财经app

      AlexanderMcQueen:期望越大,失望……越大
  • CV未来在这68张图上?Google Brain深扒ImageNet:顶级模型全都预测失败

      中国体坛“猪”全明星阵容中,老前辈当属同出生于1923年的傅其芳、霍英东。不少人对前者的名字可能比较陌生,其实他是五六十年前一位人气极高的体育界人士,1961年北京世乒赛,他率领的中国男子乒乓球队力挫群雄夺得冠军,后两届傅其芳和弟子们重演好戏,实现“三连冠”。霍英东是中国香港企业家、社会活动家、体育界知名人士。霍英东关心祖国体育事业,创建了“霍英东发展体育基金会”。以“中国奥委会”名义捐款100万美元赞助在瑞士洛桑兴建的奥林匹克博物馆。多年来捐次数亿港元在祖国修建多处体育场馆。穿西装者为傅其芳