国内精品♨️_免费韩国限制漫画-艺文笔记

王金豹 2025年12月28日 01:42:25
发布于:曼谷

国内精品♨️_免费韩国限制漫画_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
68 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 新型试车台考台试车成功!极大提升120吨级液氧煤油发动机试验交付能力

      社区设计中最受老人称赞的是,在活力生活区设置了风雨连廊。风雨连廊的设计使长者在天气情况不佳时也能随意通行于各活动空间,免受风吹日晒。
  • 因斯布鲁克:阿尔卑斯山下的童话小镇

      元UP尾灯以一条贯穿式光带横跨整个车尾,在两侧的造型上呈现“8”字,也像一个莫比乌斯环,代表着一个完整、闭合的循环,如同无穷无尽的“幸运环”,象征生活的圆满和完美。
  • 借道ETF入市 险资开年布局权益资产

      整装客户群相对清晰,产品结构相对稳定,主要面对年轻家装消费群体和刚需装修人群,市场消费具有集中、宜上规模、制造流程相对标准的特点,因此成为装企近十年的主要发力方向。但也正是因为这些特点,刚需整装迅速进入红海竞争阶段,客单值不高,盈利能力孱弱(10亿体量的整装企业不盈利在整装赛道上不是新鲜事),市场早早陷入价格竞争的泥潭,一线城市甚至出现了整装价格仅仅只有520元/平米的“整装产品”,价格竞争的惨烈程度可见一斑;
  • 首批中证A50ETF成立 约165亿增量资金来了

      在完善招生制度的同时,希望能在政策落地过程中确保不走样、不变形、不留特殊领地,促进大家形成更好的规则意识,帮助大家回归理性。
  • 问题探花秀2年合同签鹈鹕!内线四大天王凑齐了

      这样的段子,董老师信手拈来
  • 黄河口公路自行车赛垦利站 大团冲刺利库诺夫险胜

      说到游戏玩家最熟悉的AI加速功能,那肯定是RTX实时光线追踪技术以及DLSS。RTX能让游戏画面的光影更趋向真实世界,大幅提高游戏的画面表现;而NVIDIADLSS则是利用AI提高游戏帧率和改善画质。经过多年的发展,DLSS已推出了好几个大版本,包括DLSS超分辨率、DLSS帧生成和最新的DLSS3.5光线重建功能。
  • 杨超越晒自拍小露香肩 皮肤水嫩眼睛灵动有神

      《暗黑破坏神4》是系列中第一个依游戏主机玩家需求设计的作品,开发时有将控制器的使用纳入考量。其结果反映在游戏机制中,比如将新的闪躲动作整合到PS5DualSense无线控制器的特定按钮上。暴雪保证他们会致力于让瞄准敌人或宝箱尽可能的简单和易于感应。但如果这不符你的喜好,你也可以将键盘和滑鼠连结到PS5,改采信赖的方式操控,《暗黑破坏神4》会提供这个‘经典’控制方式的完整支援。新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。精彩推荐
  • 熊市已结束股市将迈入正常市

      03/WACKOMARIAxWILDSIDEYohjiYamamoto
  • 这些时尚感发饰也太上头了吧

      今天A股三大指数涨跌不一,上证指数早盘短线跳水,截至午间收盘,沪指跌0.47%,深成指涨0.05%,创业板指涨0.22%。
  • 一些动物为何会进化出“狂野”的生殖器?

      除了外资方面出现积极因素外,博时基金分析,近期发布的国内经济数据总体向好,如2月CPI同比上涨0.7%、结束此前连续4个月为负的走势,略超出市场预期,一定程度上反映出我国经济仍具有修复动力。地产行业的修复程度依旧是市场重点关注的问题,随着前期各项政策效果的逐步显现,其对经济的拖累或有望逐步改善。
  • 这位星二代终于要走红了吗?

      今年全国两会,习近平总书记与代表委员共商国是,一次次仔细询问,一句句殷殷嘱托,凝聚起亿万人民一往无前的奋进力量。
  • 女排意大利杯4强出炉 诺瓦拉1

      在近20年的课改中,我认为谢家湾学校有几个做法可能对形成今天低负担、高质量的素质教育路径起到了关键性作用。
  • 蓝湾大师赛塔蒂实现LPGA首胜 刘瑞欣第7林希妤T10

      1、自公司股票上市之日起12个月内,不转让或者委托他人管理本人在本次发行及上市前直接或间接持有的发行人股份,也不要求发行人回购该部分股份。
  • 马蜂窝副总裁:造假风波不影响运营 两到三年赴美IPO

      3、公司2019年-2022年年度股东大会分别审议通过了《2019年度利润分配预案》、《2020年度利润分配预案》、《2021年度利润分配预案》、《2022年度利润分配预案》,公司董事会经公司2019年第一次临时股东大会的授权,根据《上市公司股权激励管理办法》、公司《2019年股票期权激励计划(草案)》及相关规定,对股票期权行权价格、数量进行相应的调整。