天堂岛精品🔇_2020年2月里番剧列表-艺文笔记

王金豹 2026年01月19日 04:37:27
发布于:曼谷

天堂岛精品🔇_2020年2月里番剧列表_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R TASK 24-22-00-810-823 R Failure of the GLC 1 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-1 (1XU1) R - RELAY (20XU) R - GLC-1 (9XU1) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/02 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU1 (1XU1) comes into view: R - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 401-499, ∞∞24-22-00∞∞∞∞∞∞∞∞∞∞Page 265  Aug 01/05 CES

R  B. If the BITE test gives the message TEST PASSED:  R  - do a check of the wiring (Ref. ASM 24-22/02) for an open circuit  R  between:  R  . pin 2 of the ELEC/GCU1 circuit breaker (2XU1) and pin A/B of the  R  function relay (20XU)  R  . pin A/3 of the function relay and pin B/18 of the GLC 1 (9XU1)  R  . pin B/20 of the GLC 1 and pin A/29 of the diode module module 2420VD  R  . pin A/14 of the diode module 2420VD and pin A/6A of the GCU 1.  R  - do a check of the contacts for correct operation of the function relay  R  (20XU) and the GLC 1 (9XU1) (Ref. ASM 24-22/02) between:  R  . pins A/B and A/3 of the function relay (normally closed)  R  . pins B/18 and B/20 of the GLC 1 (normally closed).  R  (1) If the wiring or the contacts are not correct:  R  - repair or replace the wiring as necessary  R  - replace the RELAY (20XU) as necessary  R  - replace the GLC-1 (9XU1) (Ref. AMM TASK 24-22-55-000-001) and (Ref.  R  AMM TASK 24-22-55-400-002) as necessary.  R  (2) If the wiring or the contacts are correct:  R  - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref.  R  AMM TASK 24-22-34-400-001).  R  C. Do the test given in para. 3.

R TASK 24-22-00-810-824

R Failure of the GLC 2 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-2 (1XU2) R - GLC-2 (9XU2) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/03 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU2 (1XU2) comes into view: R - replace the GCU-2 (1XU2) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3

原标题:
48 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 太虚:首倡人间佛教(图)

      全新一代的MINIJCWCOUNTRYMAN其实与BMW|询价)采用了相同的底盘,但显然MINI的工程师团队胆子更大。我的试驾过程是“被迫”从卡丁模式开始的,在这个模式下电磁悬架变得异常坚硬,发动机也变得异常亢奋,时刻保持在3000rpm的转速区间让脚下油门的动作都变得敏感且突出,悬架也会对你的屁股进行摧残,路面的细碎颠簸甚至小石子都不可能放过,一律照单全收。这个过程纯粹、极致、甚至有些原始。
  • 美股三大指数集体收涨 英伟达收盘再创新高

      (外形在赛时得到了较高认可,好些人看好他演戏,可惜后来给人留下印象的更多是恋情绯闻,一些“跑男”风波什么的……)
  • 3月11日6大货币对、美元指数及黄金阻力/支撑位

      近期,成立不到一年的法国人工智能创企MistralAI发布了最新大模型MistralLarge,并推出了首个聊天机器人产品LeChat,直接对标ChatGPT。据了解,MistralLarge在目前所有能通过API访问的大模型中评分第二,仅次于GPT-4。
  • 疫苗事件和医药监管

      截至2023年末,未经审计资产总额131,742.75元,负债总额60,186.35万元,净资产71,556.40万元,2023年实现营业收入126.45万元,利润总额-350.98万元,净利润-385.85万元。
  • 碧桂园“病危”进ICU?

      从ETF基金的上市公告书来看,ETF也在加速入场。比如,截至3月5日,分别于3月4日、3月5日成立的平安中证A50ETF、摩根中证A50ETF均已在成立后快速建仓。
  • 前有刀片后有4680,软包电池夹缝求生

      “今天打得不错,开局两个洞就很精彩,后面打得比较稳定,实现了自己的策略,”罗学文说道。他非常开心自己赢下首个广东巡回赛的冠军,接着他将赴越南参加亚洲二级巡回赛。接下来,也会回到广东巡回赛继续征战。
  • 姬宇阳:上海男排成功值得其他项目借鉴

      在《非去不可的旅行》中,主人公宝宝·林肯,虽然是一位老奶奶,但她并不是以长辈的身份出现在小说中。她也像个孩子一样,会苦恼于家人的霸道管教,会生出渴望,去追寻梦中的远方,她也需要真正的独立。难能可贵的是,迪卡米洛借一个老人讲述的不是衰老和遗忘,而是成长和新生。事实上,在这套小说中,无论青年人、老年人还是小孩,所有人都充满希望和可能。
  • 汪涛:中国经济还能靠消费驱动吗

      意大利神童马特欧-曼纳瑟罗(MatteoManassero)最后一轮稳住,于琼森工作服公开赛结束11年欧巡赛冠军荒。他因此收获500个迪拜竞赛积分,排名上升72位,排在13位。他同时收获232,912.41欧元冠军支票。
  • 人民币国际化对境内货币金融的影响与应对

      今年在江苏团,习近平强调,深化科技体制、教育体制、人才体制等改革,打通束缚新质生产力发展的堵点卡点。
  • 普洛药业净利创新高拟派现3.7亿 三大业务稳增长研发费率达5.45%

      同时,25万吨的量级,也打破了皇家加勒比‘绿洲系列’在12年前创造并延续至今的最大邮轮世界纪录;再夸张一点,这比世界上最大的航空母舰‘福特号’还要大两倍有余。
  • 任泽平:人民币贬值本质上是修正高估 加强资本管制是必然

      2、股东通过互联网投票系统进行网络投票,需按照《深圳证券交易所投资者网络服务身份认证业务指引(2016年4月修订)》的规定办理身份认证,取得“深交所数字证书”或“深交所投资者服务密码”。具体的身份认证流程可登录互联网投票系统规则指引栏目查阅。
  • 库里文班亚马缺阵克雷空砍27分 勇士不敌马刺

      ESL和BLAST总计将在一年中占据160天的赛事时间。此外,还有定于6月9-22日和12月1-14日举行的两届Major,再加上夏季和冬季的休赛期。意味着其它赛事主办方的活动空间会非常小。
  • 美股三大指数开盘全线下跌,芯片股延续回落势头

      在国内动力电池供需格局较为低迷的情况下,宁德时代依然在逆势扩张,电池厂商通过产能的扩大以获得更大的成本优势。近两年,在国内现有产能持续优化升级的同时,宁德时代全力推进福鼎、车里湾、宜春、贵州等基地项目建设,并宣布新增厦门、洛阳、济宁等新基地布局。同时,宁德时代位于德国图林根州的首个海外工厂也实现锂电池模组及电芯的量产,增强对欧洲客户的本地生产及供货能力,公司电池系统产能加速释放。
  • “索要千万逼死老公”翟欣欣涉嫌敲诈勒索案,被移送法院

      放个全景能看到,佛陀前还俯拜着一人,好神圣的场景。