国内精品♨️_男人的肌肌放进女人的肌肌-艺文笔记

王金豹 2025年12月27日 03:07:41
发布于:曼谷

国内精品♨️_男人的肌肌放进女人的肌肌_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 1EFF : 001-004, 051-054, 1 32-51-00Page 563 1 1 Aug 01/05R 1 1 1CES 1

 (6) Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001)  -engage the spigot (20) in the hole (21) on the ADJUSTING TOOL - NWS GEARBOX (13),  -make sure that it is flush with the N/WS gearbox (13).  NOTE : Lightly lybricate the packing of the sensor 4GC with COMMON ____  GREASE (Material No. 04-015).

 (7)  Connect the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (F26792000-1) (18) between the connector (19) and the RVDT 4GC (16).

 (8)  Connect an AC voltmeter (minimum range: 0-20V, accuracy: 1 mV,  frequency: 50-2000 Hz) to the SECONDARY VOLTAGE connections on the  SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (18).

 (9)  On panel 402VU, put the A/SKID & N/W STRG switch in ON position.

 (10) Stage 12:  (a) On the ADJUSTING TOOL - NWS GEARBOX, turn the two knurled adjusters (14) to move the drive plate (12) of the gearbox (10) to get the algebraic difference between U1 and U2 secondary voltage: D (value calculated on stage 7)  (U1 - U2) = D  NOTE : When you turn the knurled adjusters, the gear box plate ____ (12) moves and changes the secondary voltages U1 and U2. When you turn the knurled adjusters:  - in one direction, U1 increases and U2 decreases,

 - in the other direction, U2 increases and U1 decreases.

 (b) Record the voltages U1 and U2 (in AC voltage).  (11)  Tighten the two knurled adjusters (14) to keep the position of the drive plate.

 (12)  On panel 402VU, put the A/SKID & N/W STRG switch in OFF position.

 (13)  Remove the RVDT 4GC (16) (Ref. TASK 32-51-19-000-001).

 (14)  Tighten the screws (11) through elongated holes of the ADJUSTING TOOL

 (15)  Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001).

 (16)  On panel 402VU, put the A/SKID & N/W STRG switch in ON position.

 1EFF : 001-004, 051-054, 1 32-51-00Page 564 1 1 Aug 01/05R 1 1 1CES 1

 (a)  On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (18) set the selector switch to U1.

 (b)  Record the voltage (U1)(in AC voltage).

 (c)  On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (18) set the selector switch to U2.

 (d)  Record the voltage (U2)(in AC voltage).

 (e)  Check that the algebraic value H: (U1 - U2) = H = D +/- 10mV

 (f)  If the value H is not in the limits, do the procedure from step

 (18)  If the value is correct, on panel 402VU, put the A/SKID & N/W STRG switch in OFF position.

 (19)  Remove the RVDT 4GC (16) (Ref. TASK 32-51-19-000-001).

 (20)  Loosen the knurled adjusters (14).

 (21)  Remove the ADJUSTING TOOL - NWS GEARBOX (13).

 (22)  Remove the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST (18).

 (23)  Install the RVDT 4GC (16) (Ref. TASK 32-51-19-400-001).

 (24) Connect the electrical connector (19) to the RVDT 3GC (16). Subtask 32-51-00-865-084  F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 3GG, 4GG, 2EN1, 2EN2  1EFF : 001-004, 051-054, 1 32-51-00Page 565 1 1 Aug 01/05R 1 1 1CES 1

 5. Close-up ________ Subtask 32-51-00-860-061  A. Aircraft Maintenance Configuration  (1)  If the front of the aircraft is lifted off the ground, lower the aircraft to the ground (Ref. TASK 07-11-00-586-001).

 (2)  If the nosewheels are on grease plates, move the aircraft to remove the grease plates (Ref. TASK 09-10-00-584-002).

 Subtask 32-51-00-740-050  B. Bite Test  (1) Do the Bite test of the BSCU (Ref. TASK 32-46-00-740-001). Subtask 32-51-00-942-057  C. Remove the Equipment  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Remove the access platform(s).

 (3)  Remove the warning notice(s).

 (4)  Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 1EFF : 001-004, 051-054, 1 32-51-00Page 566 1 1 Aug 01/05R 1 1 1CES 1

 TASK 32-51-00-820-001- 01   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架9

原标题:
90 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018新浪教育盛典候选机构:景鸿环球集团

      MagicOS8.0之后才是真正的AI手机
  • 汪涛:房地产活动的好转难以持续

      打造高质量的现代金融机构和市场体系是建设金融强国的首要任务。长期以来我国直接融资发展相对缓慢,未来需要更好发挥资本市场枢纽功能,疏通资金进入实体经济的渠道。鉴于证券业相对弱小,未来应加快步伐培育一流投资银行和投资机构,出台更多政策支持投行机构和投行业务发展,做大做强证券业金融机构。逐步改变资源型和银行业等传统行业企业在上市公司中占据主导地位的格局,支持高新科技公司快速发展,使之成为资本市场上市公司的核心主体。应以投资者为本,注重平衡好融资方需求和投资方的利益关系,完善股票发行制度与退市制度,强化对控股股东、高管等“关键少数”的监管。促进债券市场各类基础设施之间有序互联互通。构建和完善现代市场体系,打造规则统一、监管协同的金融市场。完善机构定位、健全法人治理、完善中国特色现代金融企业制度,支持国有大型金融机构在国际市场上做优做强,提升产品和服务的国际竞争力,当好服务实体经济的主力军和维护金融稳定的压舱石。支持中小金融机构立足当地开展特色化经营,形成大中小机构合理分布、分工明晰、良性竞争的发展格局。各类政策性银行应强化支持国家重大战略的职能定位,发挥保险业的经济减震器和社会稳定器功能。
  • 锂矿概念震荡拉升,柘中股份涨停

      麦克罗伊最后一轮只打出76杆,四轮287杆(73-70-68-76),低于标准杆1杆,并列位于21位。
  • 短期美联储加息预期升温

      (本文来自于手机中国)关键词:新浪科技公众号
  • 聚美优品宣布私有化 部分小股东:准备维权

      2016年7月18日,习近平来到固原市原州区万亩冷凉蔬菜生产基地考察。原州区被誉为“中国(西部)冷凉蔬菜之乡”。然而,水资源短缺、利用率不高,以及水利基础设施薄弱等因素曾一度卡住了蔬菜种植这一富民产业的“脖子”。近年来,当地修建了10万至20万立方米大型调蓄水池20座,建成高效节水农业示范基地24处,开发高效节水灌溉土地面积32万亩,这些喷灌水利设施有力促进了蔬菜种植产业的规模化发展,带动当地村民脱贫奔小康。△冷凉蔬菜种植已成为当地的致富产业
  • 2018新浪教育盛典候选机构:景鸿环球集团

      网友:张奶奶,我家宝13个月,早晨八点至九点醒了喝120ml配方奶,中午辅食,四点奶90ml+水果,六七点辅食,睡前母乳,不知道这样安排是否合理,奶量是不是少了点?
  • 桑自国涉嫌违法犯罪被已送检察起诉 未牵涉其他人员

      有些寺院会在主殿供奉三尊佛菩萨圣像,以文殊菩萨、普贤菩萨为娑婆世界教主释迦牟尼佛的左右胁侍,三者合称为“华严三圣”。
  • 利多难觅 油脂延续跌势

      山东泰山vs北京国安4+913分钟
  • 美国宣布制裁北约盟友土耳其 美媒称是给拜登埋雷

      从已有的信息来看,苹果想要造的车是一辆没有方向盘和油门,具备L5级别完全自动驾驶的汽车。
  • 梅新育:百年未有之大变局下东北第三次发展机遇

      (还未播,等看各角度动态能不能保持这个水平。)
  • “中国家装百强装企走访调研”(半程)报告

      据初步统计,全国举办“村晚”、戏曲进乡村、新年画活动、图书馆里过大年等群众文化活动约15万场,线上线下约6.69亿人次参与。春节假期全国营业性演出场次1.63万场,同比增长52.10%。春节假期国内旅游出游4.74亿人次,国内游客出游总花费6326.87亿元。
  • 程序员节日快乐!黄轩晒与印小天等合影笑容灿烂

      同时,柏文喜提示,金龙鱼的亏损情况反映了高度依赖大宗商品交易的企业在进行期货套保时可能面临的风险。
  • 艾拓思:美通胀数据不及预期 非美货币宽幅震荡

      ——乐乐趣《三体立体书红岸基地》新书发布会顺利举办