天堂岛精品🔇_五情相胜-艺文笔记

王金豹 2025年11月08日 03:16:38
发布于:曼谷

天堂岛精品🔇_五情相胜_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
40 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 商家反对,协会投诉,美团为何遭遇“十面埋伏”?

      早在2011年,长安汽车便设立了高端车事业部。尽管该部门随后解散,但也表明了长安进军高端市场的坚定决心。随着新能源时代到来,长安汽车在2017年4月就与蔚来签署了战略合作协议,并共同成立了“长安蔚来”平台,意图在抢先一步冲击高端新能源市场。然而,这次合作并未取得实质性的进展,最终在2020年宣告结束。
  • 买新车,还没开出4S店就降了1.7万

      学校还对学生参加线上学习提出具体要求。比如提前5分钟进入课堂,全程保持摄像头打开等,确保学生听课状态。学校非常关注学生的视力健康,为保障学生的学习效率,保护学生的视力,学校合理安排课程间隔,提供统一深色PPT背景并要求字号不小于24,上下午各安排一次眼保健操。并线上组织学生进行体育锻炼,照常开展劳动课程、心理健康课程等学习。
  • 俞燕:万科渡劫,险企“冒汗”

      反观国内的其他新能源品牌,比亚迪、问界、理想等,均在50万及以上的高端豪华市场有所布局。而长安的阿维塔则因试水产品的销量和售价等原因市场反馈不佳,只能暂且打消更进一步的念头。
  • 4岁孩子写字会不会太早?

      有人认为,海底捞立足火锅江湖的最大优势是服务,科目三舞蹈、洗头美甲、演唱会大巴等花式服务频频出圈,属于行业标杆,要保证品牌长期增长,就是要开放。
  • 越南女首富恐获死刑:祖籍广东 参与侵吞120亿美元

      因此CasperMøller|cadiaN发现自己身处一个只是为了比赛和训练乐趣的环境当中。我也不觉得RusselVanDulken|Twistzz有十足的动力,因为他几乎已经赢得了一切。
  • 中美强硬试探对方底牌:沙盘推演未来战况及影响

      在业内人士看来,2023年跨境电商“四小龙”的崛起与商业模式创新、新服务业态“全托管模式”的快速发展密不可分。
  • 英国官员发声暗示脱欧风险 梅姨赴欧影响英镑命运

      另据《民主与法治》2010年的一篇题为《蒋新华:法官的综合素质更为重要》的报道介绍,蒋新华曾历任乌鲁木齐铁路运输中级法院书记员、助理审判员、审判员、经济庭副庭长、庭长、研究室主任。2001年,在公开选拔领导干部的过程中,经过笔试、面试的激烈角逐,以全疆第一名的成绩走上了乌鲁木齐市中级人民法院副院长的岗位。
  • 老伯27元擒大乐透4523万 领奖签字时手抖不停

      不过如果认真考证,苹果汽车的起点却应该追溯到2008年,追溯到当时在乔布斯心底萌发的一个和iPhone比肩的伟大灵感。
  • “瑰丽稀世臻宝”——海瑞温斯顿高级珠宝暨腕表展即将闪耀京城

      总体来看,中性名政策和冠名政策需要进一步完善,中国足协和中足联筹备组有必要和各方协商出台更加明确的规定:其一,必须使用单一的行政区划;其二,必须使用单一词组的中性名,不超过3个字;其三,必须使用单一词组的冠名,不超过3个字或相关规定的字符。在上述基础上,再来协商转播角标的问题,争取在限制字符的情况下尽可能维护冠名商权益,这是一个与时俱进但也需要充分沟通的过程。关键词:加载中点击加载更多
  • 任泽平:德国供给侧改革是怎么干成的?

      近段时间,市值蒸发超万亿元人民币的苹果公司,成了市场“唱衰”的对象。作为贡献超一半的产品,iPhone开年在中国市场销量暴跌24%,引来许多投资人的担忧。
  • 日男排联赛JT雷霆1

      责任编辑:张冬
  • 三无公司智翔金泰上市暴露金鹰基金骚操作?IPO发行抬价与疑踩高被套

      据公开披露数据,丰巢自2016年全面扩张开始就一直处于烧钱状态,2016年-2020年,丰巢连续数年亏损,累计亏损超20亿元。
  • USDA:3月份公布的美国糙米供需平衡表

      周一,以太坊自2021年12月以来首次突破4000美元,部分原因是比特币的推动。投资者还期待本周以太坊网络的下一次重大技术升级,称为“Dencun”。过去,加密资产会在升级当天反弹,然后交易者会在该事件中抛售。
  • 万科 × 赛拉维:华灯初上,赴一场盛情之约

      想和别人一样?那得付出代价。