免费精品综合导航👅_打小三打耳光-艺文笔记

王金豹 2026年01月11日 00:36:54
发布于:曼谷

免费精品综合导航👅_打小三打耳光_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
95 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 上头了!这东西让女明星全都上头了!

      华泰证券表示,最近两年,全球央行是黄金的主要买家。目前,黄金再创新高,但是普通投资者黄金仓位偏低,仓位回补或许会进一步推动黄金价格上涨。
  • 金矿股前景乐观也许只是假象

      免疫治疗、CXO概念、创新药、肝炎概念、辅助生殖等细分板块纷纷逆势上攻,、等涨停或涨超10%。
  • 眼睑下垂松弛暗沉 试试加强眉毛的存在感

      3月10日,惠誉评级已授予中航国际融资租赁有限公司(中航国际租赁,A-/稳定)在35亿美元中期票据(中票)计划下拟发行的高级无抵押债券'A-(EXP)'的预期评级。该中票计划由SoarWiseLimited和SoarWindLtd共享。拟发行债券将由中航国际租赁在开曼群岛注册的全资境外特殊目的公司SoarWiseLimited发行。
  • 2024年3月11日涨停板早知道:七大利好有望发酵

      仓廪实而知礼节,衣食足而知荣辱。中国传统文化中蕴含着物质富足与精神富有的辩证统一关系。只有不断发展,才能实现人民对生活安康、社会安宁的梦想。精神财富的丰富,思想文化的自信自强,能够为创造物质财富提供价值引领、注入精神动力。实现中国式现代化,必须不断厚植现代化的物质基础,不断满足人民日益增长的精神文化需求,促进物的全面丰富和人的全面发展。正如习近平主席所指出的:“我们将不断提高人民物质生活和精神生活水平,做到家家仓廪实衣食足,又让人人知礼节明荣辱。”
  • 瑞信大股东寥寥四字 就在全球市场又放一把火

      我们进行心理健康教育的最重要场所,不应是心理咨询室,而应是每一间最普通的教室,以及每天最平常的学校家庭生活。
  • 为高质量发展提供强劲推动力

      而在静静看来,只要贾辉一直负担自己的吃用开销,就等于保持着男女朋友的关系。
  • 5000点之后大牛市向何处去

      再结合旗下自主新能源品牌的表现,无一不透露出长安汽车在新能源时代的焦虑。
  • 深化高端市场定位 亿合门窗牵手国家级体育赛事CTA网球赛

      3月3日晚,农夫山泉公众号发表文章《钟睒睒:我与宗老二三事》,文中称自己及农夫山泉近期遭受了大量网络暴力,因此需要作出澄清。钟睒睒指出自己第一笔创业收入是窗帘业务,不是来自于娃哈哈,从未在娃哈哈领薪、更谈不上因冲货被开除。(蓝鲸财经)@蓝鲸财经记者工作平台
  • 到底欠多少债?贾跃亭能还钱吗?乐视致歉会一一回应

      2021年,今日头条等业务被并入抖音。如今,靠王琼最早的8万美金以及另外俩人凑齐的200万人民币,字节已经演变成一家估值一度超过4000亿美元的公司。
  • 长期饮茶,可缓解失眠带来的菌群、代谢紊乱

      目前,不少银行已经开展了此类业务。记者调研多家银行了解到,目前,多家国有大行和部分股份行积存金业务处于相对火热的状态。
  • 中美科技实力对比:关键领域视角

      多重信号之下,比特币是否还有进一步上行空间?未来如何走?于佳宁指出,以比特币为首的数字资产可以被认为是一种“未来资产”,其价值能够有效穿越经济周期。而数字资产可以理解为数字经济发展的一面镜子,就如同股市反映实体产业的关系一样,数字资产价值重估反映数字经济的发展和繁荣。但作为一种高波动性的资产,比特币的价格短期内可能会经历剧烈波动,这在很大程度上取决于市场情绪、宏观经济环境、监管政策等因素。
  • 中国欧亚事务特别代表李辉第二轮穿梭外交是否取得进展?外交部回应

      经此一役,特斯拉彻底坐稳全球新造车的头把交椅,其股价一年增长了743.4%,超越全球所有的汽车厂商市值的总和。
  • 省庵大师禅诗书法欣赏

      把别人还给别人,把自己还给自己,让花成花,让树成树,从此山水一程,再不相逢,愿来生,不见,不念,不欠。