国内精品♨️_推荐几个没封的app-艺文笔记

王金豹 2025年12月28日 02:46:56
发布于:曼谷

国内精品♨️_推荐几个没封的app_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
87 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 皮海洲:让现场检查从IPO审核的配角变为主角

      金融强国中国特色的第三个要义是金融必须为经济社会发展提供高质量服务。中央金融工作会议提出要为经济社会发展提供高质量服务,营造良好的货币金融环境、加强对重大战略重点领域和薄弱环节的优质金融服务,这也是中国式现代化走高质量发展之路的必然要求。未来一个时期,首先,应始终保持货币政策的稳健性,继续保持市场流动性合理充裕,保持货币信贷总量适度、节奏平稳。货币政策要更加注重做好跨周期和逆周期调节,增强金融支持实体经济力度的稳定性。其次,优化资金供给结构,把更多金融资源用于促进科技创新、先进制造、绿色发展。继续加大对重点领域与薄弱环节的金融支持力度,尤其对创新驱动发展战略、区域协调发展战略、国家粮食和能源安全等领域,对科技创新及其成果转化、中西部基建、新能源产业链、农业现代化等的发展提供更多的资金支持。最后,金融业自身也要实现高质量发展,重点做好科技金融、绿色金融、普惠金融、养老金融、数字金融“五篇大文章”。
  • 对放开二孩不必期望过高

      对于第一次集训和比赛总共招入31名球员,伊万科维奇表示这是为了考察更多的球员,他强调,“我们要把最好的球员招入国足。”
  • 这位星二代终于要走红了吗?

      日本的军事进口增长155%,韩国增长6.5%。中国的进口下降44%,这主要是因为它从进口外国武器系统(主要来自俄罗斯)转向自给自足。
  • USDA:3月份公布的美国白糖供需平衡表

      商务部流通产业促进中心流通消费处处长张婷婷作政策解读时表示,完善的标准才能有效提高家居行业整体产品质量与服务品质。商务部流通产业促进中心正在开展商务领域行业标准的立项与审定工作,未来希望围绕家居相关产业,着力在绿色家居、适老化改造、智能家居等方面推动出台更多行业标准,提升消费者触达的便利性;构建“大家居”生态,推动产业融合发展;用好各类促消费活动,联合地方政府和有意愿企业举办家居促消费活动;联合金融平台机构,加大金融产品促消费力度。
  • 大力发展债券市场意义重大

      [秋叶凛然——采石矶]
  • 「龙抬头」多枚红盘案名揭晓 抢春北京楼市

      3、股东根据获取的服务密码或数字证书,可登录网址在规定的时间内通过深交所互联网投票系统进行投票。
  • 你知道,暗夜星空也需要被保护起来吗?

      一个疏远你的人,和你没有交心的可能,你的话也不会放在心里,你去哪里,他不会主动找你。
  • 瑞达期货(年报):改革红利弱化 期指浪里淘金

      金融市场部宏观研究员周茂华表示,储蓄式国债属于金边债券,安全性高、收益可预期。因此,近期大多银行下调存款利率后,国债受到特定人群的欢迎。“此外,部分居民对未来存款利率下行仍有一定预期。”他说。
  • 99%北方人不认识的水果,名字非常糊弄

      纵观世界经济历史,金融强国无一不是以强大的经济基础为根基。英国的金融强国建立在工业革命及其形成的世界工厂的基础之上。英国的全球制造业中心地位和世界贸易大国是其金融强国的坚实基础。第二次世界大战之后,美国则依靠其工业大国和贸易大国以及科技强国的支撑,成为并延续了80年的全球金融强国地位。在强大的经济实力、科技实力和综合国力的基础之上,金融强国可以有效获得、吸纳、集聚和掌控全球金融资源,反过来也可有力地支持经济发展。
  • 理想MEGA开局不利,其实跟外观没太大关系。

      从竞争格局来看,过去中高端MPV市场主要由外资占领,2023年一些整车厂尤其是新势力纷纷瞄准MPV蓝海市场。在2023年一些新MPV车型上市的推动下,MPV行业格局已经发生了改变:一方面,别克GL8在中国MPV市场上不再享有绝对优势;另一方面,中国市场格局逐渐变得分散。
  • “中字头”飙升,龙头“30cm”涨停

      零售生意本质上是一个通路生意,每个链条都要有钱赚才行,太便宜了大家都没钱赚。