在线看免费❗_卡在墙里的女孩小游戏在线-艺文笔记

王金豹 2025年12月28日 03:42:26
发布于:曼谷

在线看免费❗_卡在墙里的女孩小游戏在线_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
65 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 中国面对贸易战应以打促和

      《报告书》还列出了各平台车型的主要参数。资料显示,基于X6平台的产品规划目前仅有一款MPV,规划年产能3.5万辆。详细参数方面,该车车长5200mm,轴距3200mm。项目计划2024年开工,2025年竣工。
  • 吴昕发微博庆祝张杰生日 为姐夫卖力宣传话剧行程

      《TheLightBrigade》——17.49美元(30%折扣)
  • 就现在,一秒穿越回上元灯彩图

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)
  • 50岁林志玲晒美照上热搜 修长美腿纤腰细身状态超好

      强大的中央银行是金融强国的核心支柱。由于关键货币的国际信用具有极其重要的影响,其中央银行在某种程度上类似于全球的中央银行。强大的货币与强大的中央银行之间相辅相成,强大的货币是本国中央银行成为全球具有重要影响力的中央银行的基础和前提,而本国中央银行的强大信用和有效管理则成为强大的货币的支撑和保证。20世纪80年代初,我国建立了中央银行制度,并颁发了《中国人民银行法》等一系列相应的法律法规来加以规范。40年来我国中央银行制度从无到有不断完善,中央银行在稳定经济增长、保持币值稳定、有效控制金融风险和平衡国际收支等目标上发挥十分关键的作用。建立强大而完善的中央银行是未来的重要任务。一是完善货币供应调控机制,形成中央银行调节银行货币创造的流动性、资本和利率约束的长效机制。二是构建金融有效支持实体经济的体制机制,在宏观层面搞好跨周期政策设计,以现代化的货币管理促进经济高质量发展。三是建设推进金融双向开放的相关机制,提高参与国际金融治理能力,积极参与国际金融规划的制定。
  • 如何找到对的人 男女都要一起来看看

      [暗夜游园]黎明前的黑暗总是安静而阴沉的,仿佛要吞噬所有,我们唯有等待拂晓的到来!
  • 华联期货:临近交割 日历交易

      立讯精密工业股份有限公司
  • 厨房空调该怎么选?

      以前传统车企更习惯于在新闻平台上宣布企业重大新闻、发布产品。新势力崛起后,汽车品牌阵地的声量占比发生了很大变化。新媒体渠道形成了明显的波峰效应。
  • “一行一会”回应金融市场热点关切

      3、如上述销售机构开通上述基金转换业务,投资者在办理上述基金的转换业务时,应留意本公司相关公告,确认转出基金处于可赎回状态,转入基金处于可申购状态,并遵循上述销售机构的规定提交业务申请。关于基金开通转换业务的限制因素、同一基金不同份额是否开通互转业务、基金转换业务的费率计算及规则请另行参见本公司相关公告或基金招募说明书。
  • 未来中国经济有三种演变可能

      而“超时不收费”的快递驿站则开始雨后春笋地冒出来,早期尤以菜鸟驿站一家独大,截至2023年6月30日,菜鸟驿站已拥有超17万个驿站;除此外,中通旗下兔喜驿站数量超过8万。
  • 大学“胖胖班”走红:人均减重近5kg 仅1人不降反升

      换言之,AIAgent是AI产品更成熟的形态,它真正的使命就在于将AI能力封装化,让C端、B端用户都能更便捷更直观的运用,从而助力生产力的解放。如果说大模型产品只能被动的接收-生成,那么Agent的使命要复杂的多,它更类似智能助手,需要借助自身的AI能力帮助使用者解决切实问题。
  • 人均消费3000元! 环球影城“冤不冤”?

      对Williams不利的是他的年龄。如果库克在宣布辞职(“宣布将辞职”)十年后离职,他将年满70岁,而Williams将年满68岁,因此这位首席运营官不太可能再长期任职。
  • 金融支持房地产有力有效 “白名单”项目融资加速推进

      四、参加网络投票的具体操作流程
  • 和颐酒店女生遇袭警示:女生应该如何自救

      此外,蒋国飞表示,区块链与AIoT(人工智能加物联网)的结合可以解决物理世界到数字世界衍生的问题。AIoT帮助解决区块链源头可信的问题,因为不管区块链怎么流转,还需把物理资产锚到数字的世界里。同时区块链也帮助了AIoT解决资产数字化和价值的流转问题。