糖心logo官网✅_亚洲三区精品-艺文笔记

王金豹 2026年01月05日 01:50:15
发布于:曼谷

糖心logo官网✅_亚洲三区精品_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

3. Elevator Control System Adjustments If you cannot get the correct range of movement of the elevator control system, use this procedure to adjust the system. Gust travel refers to the amount of travel remaining at the control surface with the control stick held against the cockpit stop. WARNING: IF YOU DO AN ADJUSTMENT OF A PUSH-ROD, YOU MUST MAKE SURE THAT THE PUSH-ROD IS STILL IN SAFETY. IF YOU DO NOT DO THIS, THE PUSH-ROD CAN DISCONNECT. THIS CAN CAUSE DEATH OR INJURY TO A. Equipment PERSONNEL. Item Quantity Part Number Ruler or deflection gauge. 1 Commercial. Rigging pins. 3 - B. Elevator Control Adjustment Procedure Refer to Figure 1. Detail Steps/Work Items Key Items/References (1) Remove these items for access: S The pilots' seats. S The rudder. Refer to Sections: 25-10. 55-40. (2) Install rigging pins in the following: S Through the stick mounting block and the torque tube. S The idler lever. S The rear bellcrank. On the control bulkhead. On the front main bulkhead. On the vertical stabilizer rear web. (3) If you cannot put a rigging pin into a lever or bellcrank, adjust the push-rods as necessary. Refer to Section 27-00 for the push-rod adjustment procedure. (4) Make sure that the elevator aligns with the horizontal stabilizer. At the stabilizer tips. AIRCRAFT Flight Controls DA 40 Series AMM Detail Steps/Work Items Key Items/References Page 204 20 Sep 2007 27-30-00 Doc # 6.02.01 Rev. 5 (5) If the elevator does not align with the horizontal stabilizer, adjust the vertical push-rod at the rear bellcrank. Refer to Section 27-00 for the push-rod adjustment procedure. (6) Remove rigging pins from the following: S The stick mounting block. S The idler lever. S The rear bellcrank. On the control bulkhead. On the front main bulkhead. On the vertical stabilizer rear web. (7) Do a test for the correct range of elevator movement. Refer to Paragraph 2. (8) Do an inspection of all the controls that you have adjusted. S If necessary for your airworthiness authority, do a second inspection of the controls. (9) Install these items: S The pilots' seats. S The rudder. Refer to Sections: 25-10. 55-40. AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-30-00 Page 205 20 Sep 2007 4. Elevator Push-Rod Access Elevator Push-Rod Remove/Install Access References Between the control torque tube and the idler lever at the front main bulkhead. Pilots’ seats. Refer to Section 25-10. Between the idler lever at the front main bulkhead and the bellcrank at the vertical stabilizer rear web. Pilots’ seats. Rudder. Refer to Section 25-10. Refer to Section 55-40. Between the bellcrank at the vertical stabilizer rear web and the elevator. Rudder. Refer to Section 55-40. 5. Elevator Bellcrank and Lever Access Elevator Bellcrank/Lever Remove/Install Access References Idler lever at the front main bulkhead. Pilots’ seats. Refer to Section 25-10. Bellcrank at the vertical stabilizer rear web. Rudder. Refer to Section 27-20. AIRCRAFT Flight Controls DA 40 Series AMM Page 206 20 Sep 2007 27-30-00 Doc # 6.02.01 Rev. 5 Intentionally left blank AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-38-00 Page 1 20 Sep 2007 Section 27-38 Flight Controls - Elevator Trim 1. General The DA 40 has an elevator with a trim tab. The trim tab is mechanically operated. This lets you trim the airplane for different speeds and center-of-gravity positions. A handwheel on the center console controls the elevator trim. An indicator tells the pilot the trim setting. A flexible cable moves the trim tab. AIRCRAFT Flight Controls DA 40 Series AMM Page 2 20 Sep 2007 27-38-00 Doc # 6.02.01 Rev. 5 Figure 1: Elevator Trim Mechanism in the Cockpit AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-38-00 Page 3 20 Sep 2007 2. Description The trim installation has 3 main parts: ) A handwheel assembly with a trim indicator. ) A flexible cable which connects the handwheel to the trim tab. ) The trim tab actuator assembly. Figure 1 shows the elevator trim mechanism in the cockpit. Figure 2 shows the trim tab actuator assembly. A. Trim Handwheel Assembly A handwheel assembly on the center console controls the elevator trim system. The assembly has a   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:钻石40系列AMM 2

原标题:
80 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 8000万!切尔西官宣签下历史最贵门将 签7年长约

      而今天KRÜ正式公布了旗下的CS新版本战队阵容,该阵容的四名选手都来自于阿根廷,唯一的外国人是来自哈萨克斯坦的laser。
  • 24岁儿媳与五旬公公私奔 丈夫受打击自杀

      在众多网文作者中,季越人可能属于为数不多的天赋型选手,尽管他本人并不完全认同。季越人告诉Tech星球,写作契机主要是因为,去年升级为大三,时间比较充裕,就想试着写一下,权当练笔。写作之初,季越人说并有没对新作品抱有什么期待,也没有预判过之后能取得什么成绩。动笔之初甚至还很“潦草”,既没有像其他网文作者那样提前“拆文”,学习爆文创作技巧,也没有提前写好小说大纲,按部就班的写作。每天就只是坚持日更4000字左右,至今他已累计更新223万字。
  • 春节黄金周澳门入境旅客人次同比增25%

      GhostsofTabor(CombatWaffleStudios)
  • 蔚来9月交付量爆增58% 与小鹏赌约结果即将揭晓

      另外,2024款理想L系列车型也同步上市,新车在原有车型的基础上将续航、舒适性、安全性等多个方面的优势又推进了一步。
  • 揭秘男人的亲密周期:他为何突然躲你?

      日本选手古江彩佳抓到7只小鸟,打出零柏忌65杆,四轮成绩为274杆(69-70-70-65),低于标准杆14杆,排名第三位。
  • 玩家讨论《星刃》紧身衣:开发者很清楚游戏的受众

      农田和农人的四季虽朴实,却蕴含着无尽的智慧。“种瓜得瓜,种豆得豆。”“一分耕耘,一分收获。”历史一次又一次地为我们验证这朴素的智慧。古圣先贤也不厌其烦地教诲后人:“积善之家必有余庆”“爱出者爱返,福来者福往”如果您是一个善于发现的人,您一定对此深有同感。所以如果您想收获爱,那么您就给予爱。如果您想收获善,那么您就给予善。如果您想收获福慧,那么您就给予福慧。就像农人辛勤地耕耘农田一样,锲而不舍地耕耘自己的心田,如此终有一天尘尽光生,此心光明。
  • 深化改革和防风险是明年经济工作重点

      资料显示,项目所在地块位于合肥市肥西县桃花工业园新港南区,占地面积约1500亩,租用肥西新能源汽车智能产业园标准化厂房,购置冲压、焊装、涂装及总装相关生产设备,建设年产20万辆新能源乘用车生产制造基地。项目组成包括:冲焊联合厂房(包括冲压车间和焊装车间)、涂装车间、总装车间、各车间辅房、PDI车间、餐厅、物流门、发车中心等。
  • 超一线大咖双语亲授,刚入场美股也能无压力听懂

      “性能极致的大号卡丁车”,是对此刻最贴切的模式,尽管颠簸但它却非常适合欧洲狭窄的山道,准确的指向与敏捷的车尾让它游刃有余,而坚固的悬架支撑给全车人都带来了足够的信心。在车里人的欢叫下20km的山路不算短,每个弯道都像是在玩游戏打BOSS,让你不断审视这一次的走线,优化下一个弯道,一圈下来,屁股的疼的,时间是不够的,心情是愉快的。
  • 韩玮:2020年A股进入牛市第二阶段

      比亚迪在“龙年”开年后,通过一系列的产品焕新,影响并震动了中国汽车市场,在多年蝉联车市冠军中,通过不断积累的自研核心技术以及多品类的布局,让比亚迪每每推新的时候,都会赢得市场以及行业的关注。而小型纯电SUV车型,一直都是比亚迪缺少竞争力的领域,可以说元UP的出现,是要托起比亚迪小型纯电SUV市场销量的,这款车型将在3月上市。
  • 余承东向传统车企开炮,何小鹏直言想朝他扔鞋,粤港澳车展,大佬们憋不住了

      毫不费力的松弛感穿搭,大地色和偏暖的石灰白加入再次诠释了品牌追求自然的内核。男生女生都很适配,同色系叠穿学起来!
  • “好想再生个孩子,天天辅导他写作业!”这是往届家长的心里话!

      由于地区冲突等多元素导致的原材料短缺问题,面对全新的挑战,是一大危机,也是一场机遇。作为整个市场的痛点,未来的生存与发展方向,是诸多企业关心的要点。
  • AI离全社会普及,只差一个计算中心?

      值得一提的是,今年3月,股票型基金的新发规模相较1月至2月出现了较大的增长,多只A50ETF的首募规模超10亿元。随着这些基金陆续建仓,更多“子弹”将进入A股市场。