免费精品综合导航👅_완전한 사육: 감금의 미학 电影-艺文笔记

王金豹 2025年11月16日 01:42:29
发布于:曼谷

免费精品综合导航👅_완전한 사육: 감금의 미학 电影_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
37 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 我们来到重生工作室总部,体验了APEX的全新赛季

      发布关于控股股东、实际控制人、董事长提议回购公司股份的提示性公告。公告显示,公司于2024年3月9日接到公司控股股东、实际控制人、董事长杨兴海《关于提议世纪恒通科技股份有限公司回购公司股份的函》,回购股份的资金总额不低于人民币2500万元,不超过人民币5000万元。
  • 探秘美妆达人的化妆台都什么样?

      3、根据《公司章程》《深圳证券交易所上市公司自律监管指引第1号一一主板上市公司规范运作》的要求,上述议案为影响中小投资者利益的重大事项,需对中小投资者表决单独计票,单独计票结果将及时公开披露。
  • 限制人脸识别,新界线在哪?

      李兰对快递柜撤场的感知明显,其居住于贵州一个中大型住宅区,小区内分布有16栋住宅楼,住户超4000人。此前,李兰小区内多个活动场地摆放了三至四组快递柜,“巅峰期整个小区至少有20组柜子。”
  • 央行外汇占款与外汇储备并非完全对应

      而“超时不收费”的快递驿站则开始雨后春笋地冒出来,早期尤以菜鸟驿站一家独大,截至2023年6月30日,菜鸟驿站已拥有超17万个驿站;除此外,中通旗下兔喜驿站数量超过8万。
  • 中国古代私家园林建筑的杰出代表 苏州名片之一

      本场比赛,库里继续缺阵。首节比赛,马刺占据上风,领先勇士8分结束第一节。第二节,勇士一波高潮追平比分,双方陷入僵持。半场结束时,马刺领先勇士2分。第三节,马刺一波高潮将分差再度拉大到两位数,勇士之后回击一波30-6的高潮完成反超并领先两位数。末节,勇士牢牢掌控10分左右的领先。最终,勇士112-102力克马刺。
  • 霍华德·戴维斯:金融危机管理指南

      王慧文是袁进辉创业历程中的关键人物。在遇到王慧文之前,袁进辉有过一次创业经历。
  • 核心龙头资产A50ETF(159601)上市交易中,交投活跃,溢价频现

      欧洲股市涨跌不一,英国富时100指数小幅上涨。
  • 董明珠和华为鸿蒙,能炒出火花吗?

      本次新书品读会的嘉宾——徐美玲老师是童书和儿童阅读研究专家,长期从事儿童阅读书目的研制工作,也是爱阅童书100、陈伯吹国际儿童文学奖等国内童书评审体系的主要奠基人。
  • 东方甄选CEO深夜致歉:有问题公司承担,不要攻击主播个体!

      险资配置权益资产的比例上限最高可达占其上季度末总资产的45%,但目前险资配置比例还相对较低,屈放对记者表示,特别是人身险近年来受到偿付能力充足率的影响,投资比例普遍没有超过20%。
  • 【晨报】黄金依旧看涨,日内或涨至1232.89

      《戴森球计划》是由YouthcatStudio制作GameraGame发行的一款模拟游戏,浩瀚无垠的宇宙,未知的征程,作为戴森球计划的一名工程师,你将前往陌生的星系,建造戴森球。
  • 首个庞贝人基因组测序完成,曾患肺结核

      去年9月,在AlexanderMcQueen工作了26年、担任创意总监长达13年的SarahBurton宣布离开品牌,10月,Kering开云集团宣布了她的继任者——年轻的爱尔兰设计师SeánMcGirr。对于这家有着独特魅力的品牌会开启一个怎样的新篇章,人们充满好奇。
  • 价格战开打!特斯拉Model Y长续航/高性能版宣布国内降价1.4万:29.99万起

      居室内,各种家具的高度、设计均适应长者生理特征,方便长者起坐、抓握、支撑、移动等。其中,茶几采用圆角设计、围边设计,既能减少棱角磕碰损伤、防止物品掉落,也能减少长者弯腰次数、方便长者生活。同时,床高按照老人的居住舒适度统一设计为56cm,床下设计有内凹防止磕碰。
  • 财经首页 | 新浪首页 | 新浪导航

      为了提高参股房地产项目公司征信,满足金融机构风控要求,履行股东义务,支持参股房地产项目公司持续健康发展,本次公司控股子公司包括但不限于重庆金科房地产开发有限公司(以下简称“重庆金科”)原则上根据合资合作协议的约定,按公司持股比例对参股房地产项目公司提供担保。如根据金融机构要求,公司控股子公司超过公司持股比例提供担保,为进一步防范担保风险,在提供担保后将要求其他股东或者参股房地产项目公司提供反担保。