免费精品综合导航👅_小女孩白色连裤袜搭配-艺文笔记

王金豹 2026年01月30日 06:34:12
发布于:曼谷

免费精品综合导航👅_小女孩白色连裤袜搭配_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (Ref. Fig. 401/TASK 71-22-11-991-300) Subtask 71-22-11-020-051  A. Removal of the Aft Engine Mount. NOTE : Removal of the hardware that attach the aft engine mount to the ____  engine is the same at the three engine flanges.

 (1) Remove the retaining pin (5) from the bolt (15).

 (2) Remove the bolts (30), washers (35), (50). and nuts (55) that attach the retainers (60) and (70) to bracket (40).

 (3) Remove the retainers (60) and (70) from engine.

 (4) Remove the spanner nuts (65) and (75) from the bolt (10) and the pin (15).

 (5) Remove the bolt (10) from the pin (15).

 (6) Remove the pin (15), and the brackets (20) and (40) from the engine flange.

 (7) Disengage the link assemblies from the engine flanges and remove the engine mount (85) from the engine.

 (8) Remove the bushing (25), (45), and the shoulder bushing (80) from the engine flanges.

 Subtask 71-22-11-480-052  B. Installation of the AFT ENGINE MOUNT ANTI GOUGE SPLINTS.  (1) Put the top slint assemblies (larger) on the outside of the aft engine mount links.  NOTE : The end of the splint assembly marked TOP must touch the beam ____ assembly. The other end marked BOTTOM must touch the links.  (2) Put the bottom splint (smaller) on the inside of the aft engine mount links.  F 『 EEFF : ALL E Page 40271-22-11  E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 Aft Engine Mount  Figure 401/TASK 71-22-11-991-300

 F 『 EEFF : ALL E Page 40371-22-11  E E Feb 01/98 E E ECES E

 F  『  E  C F M  E  E  E  E  56-5B  E  E  E

 (3) Attach the SPLINT - ENGINE MOUNT AFT (RSE1224) to the engine mount two places with TY WRAP.  (a) Wind the TY WRAP around the splints and the aft mount where the splint touches the beam assembly.

 (b) Wind the TY WRAP around the splints and the aft mount where the splint touches the link.

 (c) Make sure that the TY WRAP is wound very tight and that the splints can not move.

 F 『 EEFF : ALL E Page 40471-22-11  E E Feb 01/98 E E ECES E

 F 『  E C F M E  E E  E 56-5B E  E E

 TASK 71-22-11-400-041  Installation of the Aft Engine Mount  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  ------------------------------------------------------------------------------- REFERENCE  QTY DESIGNATION  ------------------------------------------------------------------------------- No specific  Torque Wrench : range 8.00 to 75.00 lbf.ft  (1.00 to 10.00 m.daN)  No specific Torque Wrench : range 15.00 to 150.00 lbf.ft

 (2.00 to 20.00 m.daN) R No specific Torque Wrench : range 5.00 to 35.00 lbf.in R (0.05 to 0.40 m.daN)  RSE1098 1 WRENCH SET - AFT ENGINE MOUNT  RSE1224 2 SPLINT - ENGINE MOUNT AFT

 B. Consumable Materials  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- Material No. CP5063  *  Silicone Lubricant (Ref. 70-30-00)

 C. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 71-00-00-000-042 Removal of the Power Plant 71-00-00-400-042 Installation of the Power Plant 71-22-11-991-300 Fig. 401  F 『 EEFF : ALL E Page 40571-22-11  E E May 01/05 E E ECES E

 F  『  E  C F M  E  E  E

 3. Job Set-up __________  Subtask 71-22-11-860-050

 A. Make sure that the engine is removed (Ref. TASK 71-00-00-000-042)  Subtask 71-22-11-080-052

 B. Remove the SPLINT - ENGINE MOUNT AFT (RSE1224) from the aft engine mount.  4. Procedure _________  (Ref. Fig. 401/TASK 71-22-11-991-300)  Subtask 71-22-11-420-051

 A. Installation of the Aft Engine Mount. CAUTION : INSTALL THE BUSHING (80) WITH ITS SHOULDER AT THE INTERIOR OF _______  THE ENGINE RANGE.

 NOTE : Installation of the hardware that attach the aft engine mount to   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2

原标题:
86 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 3月6日操盘必读:影响股市利好或利空消息

      2018年4月3日,素有投资界奥斯卡之称的福布斯“全球最佳创投人”2018年榜单(TheMidasList2018)公布,沈南鹏排名第一,成为榜单自2001年创办以来首位登顶的中国投资人。次年,沈南鹏蝉联榜首,榜上更史无前例地出现超1/5的中国面孔。这或许是中国创投从业者距离顶峰最近的时刻。
  • 中国正经历增速换挡期最后一跌

      当地时间3月8日,美股三大股指冲高回落集体收跌,标普500指数和纳指早盘刷新历史新高,随后震荡下行,纳指跌超1%。截至收盘,道指跌0.18%,标普500指数跌0.65%,纳指跌1.16%。美国2月非农就业数据好坏参半,失业率上升强化了市场对美联储6月开始降息的预期。
  • 航班因天气取消改签差价旅客航企平摊?官方:在考虑

      “2024年的权益资产配置价值是凸显的,这是因为国内资产价格在二级市场表现处于历史低位,并且与全球大类资产价格相比,也极具性价比,另外,全球加息周期已进入尾声,下半年美联储大概率率先降息,国际市场流动性将趋于宽松,今年的权益资产市场表现将优于2023年。”王兆江表示,下一步险资权益配置比重大概率会提升,企业上看,投向将包含央企、地方国企控制的优质资源、优质企业,还包括产业升级方向,比如具有新质生产力的企业;行业上看,将包括有色、能源、金融、地产、非银、保险、交运、物流、公用事业等。
  • 温彬:经济如期复苏,关注三大短板

      分析人士表示,适度上调该业务“门槛”,一定程度上提醒投资者关注未来潜在波动风险,有助于市场回归理性,更好落实投资者适当性管理。
  • 庾澄庆为柴智屏女儿证婚:其实主要是找我唱歌?

      此外,社区楼内全域走廊均配置了扶手方便老人扶助休息,扶手离地约1米,内侧设有符合手形的凹槽来增加摩擦力,防止老人摔倒。
  • 从多个维度感受外贸暖意

      注册成功后,用户将能够加入FaceTime通话,并以逼真的虚拟化身形式被其他人看到,就像使用VisionPro一样。用户的嘴巴将实时与用户的声音同步移动。
  • 李庚南:严监管才是市场最大的利好

      在本次股东大会上,股东可以通过深交所交易系统和互联网投票系统()参加投票,参加网络投票的具体操作流程详见本通知附件1。
  • 拉卡拉业绩增长乏力 联想及孙陶然等试图变相套现

      英格兰老将保罗-卡西最后一轮抓到6只小鸟,打出零柏忌66杆,包括16号洞收官时抓鸟。英国公开赛前冠军卡梅隆-史密斯抓到5只小鸟,吞下2个柏忌,打出67杆。两人追平亚伯拉罕-安瑟。
  • TrendForce:苹果选择京东方和Seeya供应Vision Pro OLED微显示屏

      在国内动力电池供需格局较为低迷的情况下,宁德时代依然在逆势扩张,电池厂商通过产能的扩大以获得更大的成本优势。近两年,在国内现有产能持续优化升级的同时,宁德时代全力推进福鼎、车里湾、宜春、贵州等基地项目建设,并宣布新增厦门、洛阳、济宁等新基地布局。同时,宁德时代位于德国图林根州的首个海外工厂也实现锂电池模组及电芯的量产,增强对欧洲客户的本地生产及供货能力,公司电池系统产能加速释放。
  • 10派36元!A股现“超级分红”:千亿巨头要豪掷77亿,去年暴赚190多亿!

      蔚来CFO奉玮在财报中表示,今年公司将优先考虑业务目标,提高系统能力,并进一步优化成本管理效率。
  • 马斯克:美国经济衰退其实是好事,可能持续12到18个月

      在经历1月开门红和2月同环比双降后,3月车市会走向何方?对此中汽协指出,汽车是工业经济稳增长的“压舱石”,一直以来都得到党中央和国务院的高度重视。今年的政府工作报告中,明确提出要“巩固扩大智能网联新能源汽车等产业领先优势”和“提振智能网联新能源汽车等大宗消费”。
  • 黄龙慧南禅师禅诗欣赏

      一、关于2019年股票期权激励计划预留授予第四个行权期行权条件成就的说明