天堂岛精品🔇_荒野大镖客2美国野花-艺文笔记

王金豹 2026年01月28日 21:18:42
发布于:曼谷

天堂岛精品🔇_荒野大镖客2美国野花_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 AIR COOLING SYSTEM - REMOVAL/INSTALLATION _________________________________________ TASK 21-52-00-920-001 R Removal and Replacement of the Combo and Periseals in the Air Conditioning Pack R Ducts  1. Reason for the Job __________________  Refer to the MPD TASK: 215200-07  2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R 21-51-51-000-001 R 21-51-51-400-001 R R 21-52-16-000-001 R 21-52-16-400-001 R 21-52-21-000-001 R 21-52-21-400-001 R 21-52-23-000-001 R R 21-52-23-000-002 R R 21-52-23-000-003 R R R 21-52-23-400-001 R R 21-52-23-400-002 R R R 21-52-23-400-003 R R R 21-52-24-000-001 R R 21-52-24-400-001 R R 21-52-31-000-001 R 21-52-31-400-001 Removal of the Pack Flow-Control Valve 8HB and (11HB) Installation of the Pack Flow-Control Valve 8HB (11HB) Removal of the Water Extractor 10HM8 (11HM8) Installation of the Water Extractor 10HM8 (11HM8) Removal of the Air Cycle Machine 10HM1 (11HM1) Installation of the Air Cycle Machine 10HM1 (11HM1) Removal of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle Machine Removal of the Pipe Assembly between the Anti-Ice Valve, the Bypass Valve and the Air Cycle Machine Removal of the Pipe Assembly between the Anti-Ice Valve and the Bypass Air Duct of the Primary Heat Exchanger Installation of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle Machine Installation of the Pipe Assembly between the Anti-Ice Valve, the Bypass Valve and the Air Cycle Machine Installation of the Pipe Assembly between the Anti-Ice Valve and the Bypass Air Duct of the Primary Heat Exchanger Removal of the Heat Exchanger Unit 10HM4 (11HM4) (From the Aircraft) Installation of the Heat Exchanger Unit 10HM4 (11HM4) (Into the Aircraft) Removal of the Reheater 10HM3 (11HM3) Installation of the Reheater 10HM3 (11HM3) -------------------------------------------------------------------------------

REFERENCE DESIGNATION  ------------------------------------------------------------------------------- 21-52-32-000-001 Removal of the Condenser 10HM2 (11HM2)  21-52-32-400-001 Installation of the Condenser 10HM2 (11HM2)  21-61-53-000-001 Removal of the Bypass Valve 10HH (30HH)  21-61-53-400-001 Installation of the Bypass Valve 10HH (30HH)

 3. Job Set-up __________  Subtask 21-52-00-010-069

 A. Not applicable  4. Procedure _________  Subtask 21-52-00-920-050 R A. Remove, discard and replace the seals in: R (1) The flow control valve (Ref. TASK 21-51-51-000-001) and (Ref. TASK  21-51-51-400-001).  (2)  The water extractor (Ref. TASK 21-52-16-000-001) and (Ref. TASK 21-52-16-400-001).

 (3)  The air cycle machine (Ref. TASK 21-52-21-000-001) and (Ref. TASK 21-52-21-400-001).

 (4)  The pack connection pipes (Ref. TASK 21-52-23-000-001) and (Ref. TASK 21-52-23-400-001),

 -(Ref. TASK 21-52-23-000-002) and (Ref. TASK 21-52-23-400-002),  -and (Ref. TASK 21-52-23-000-003) and (Ref. TASK 21-52-23-400-003).

 (5)  The heat exchanger area (Ref. TASK 21-52-24-000-001) and (Ref. TASK 21-52-24-400-001).

 (6)  The re-heater (Ref. TASK 21-52-31-000-001) and (Ref. TASK 21-52-31-400-001).

 (7)  The condensor (Ref. TASK 21-52-32-000-001) and (Ref. TASK 21-52-32-400-001).

 (8)  The bypass valve (Ref. TASK 21-61-53-000-001) and (Ref. TASK 21-61-53-400-001).

 AIR COOLING SYSTEM - ADJUSTMENT/TEST ____________________________________  TASK 21-52-00-710-002  Operational Test of the Air Cooling System

 1.  Reason for the Job

__________________  Self Explanatory

 2.  Job Set-up Information

______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 21-61-00-710-001  Operational Test of the Pack Temperature-Control System  3. Job Set-up __________  Subtask 21-52-00-010-054

 A. Not applicable.  4. Procedure _________  Subtask 21-52-00-710-052

 A. Do the operational test of the pack temperature control (Ref. TASK 21-61- 00-710-001) R TASK 21-52-00-780-001

 Pressure Drop Test of the Reheater 10HM3 (11HM3)  WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4

原标题:
35 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 孕妈阵痛时胎宝在做什么?生宝宝时,原来努力的不止你自己

      据参考消息,今年1月,美国一个名为阿尔法几何(AlphaGeometry)的AI系统,能做出国际数学奥林匹克(IMO)的30道几何题中的25道,已经接近人类奥数金牌得主水平,该突破性成果甚至登上了著名的《自然》(Nature)杂志。
  • 经济学家喊话欧洲央行:别再跟随美联储了 赶紧独立行动

      具体来看,比亚迪排在第一名,2月零售销量为11.9万辆,但同比下滑32.8%,市场份额为10.8%。销量下滑主要原因除了与节假日有关外,也有市场竞争加剧有关,对此比亚迪2月推出了多款售价更便宜的新车来获得消费者的关注。
  • 3月11日四大证券报头版头条内容精华摘要

      近日,卡普空宣布《生化危机4:重制版》的VR模式将于12月8日登陆PSVR2头显。
  • 红利主题基金持续“上新” 机构乐观评价赛道拥挤度

      责任编辑:邹少欢关键字:新浪新闻公众号
  • 黄金投资热席卷全国 信用卡购买黄金需谨慎

      重庆工人来源:大多都来自重庆本地,其他来自于安徽、江西等地;
  • “中字头”飙升,龙头“30cm”涨停

      6、经济效益:本项目预计实现年平均营业收入27,021万美元,实现年平均净利润6,689万美元。根据财务分析评价结果,项目净利润率为24.76%,项目投资回收期为4.88年。
  • 别把身材管理变成苦差事 “操之过急”可能会走向极端

      内搭的针织衫和连裤袜,在颜色上相互搭配,打造出统一的造型。
  • 技术流分析怎么拍照显脸小,专治各种上镜大脸

      正如数字资产银行AnchorageDigital首席执行官兼联合创始人NathanMcCauley表示,“比特币的历史高点标志着加密货币的一个转折点。传统机构曾经‘袖手旁观’,今天,他们正作为牛市的主要在这里全力以赴”。
  • 过去五年欧洲主要武器进口数量激增

      按照摩根士丹利预测,至2050年,飞行汽车的全球市场规模将达9万亿美元,中国有望成为全球最大的飞行汽车市场,潜在市场规模将达到2.1万亿美元。飞行汽车具备较强的产业关联效应:上游涉及航空铝材、镁合金及特殊玻璃等碳纤维技术集结而成的原材料市场;中游则覆盖发动机、电池以及整机制造等产业核心环节,同时链接到下游的基础设施建设运营、飞行服务保障以及航空培训,而且飞行汽车既包括传统通用航空业态,又融合了以无人机为支撑的低空生产服务方式,应用场景十分丰富。飞行汽车横跨飞机制造、汽车制造与电动航空器制造三大领域,集中了新能源、自动驾驶、高端制造、航空航天等几大战略性新兴产业,可谓新质生产力的聚集地。
  • 利物浦1

      IT之家3月12日消息,理想MEGA于3月1日发布,昨日正式开启交付,不过这款车型近期似乎因为其外观设计而饱受争议,无疑对理想汽车的品牌形象造成了负面影响。
  • 2018年熊猫银币价格今天多少一克(2018年11月06日)

      ‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌
  • 滚石原创乐队大赛落幕 九连真人获与滚石签约机会

      夏莹莹分析称,随着美联储乐观降息预期的修正结束,美联储降息时点将进一步临近,且有望呈现开放式降息路径,贵金属价格重心料进一步上抬。但短线暴涨行情下,追涨性价比已较低,“建议贵金属前多谨慎持有,或逢高减仓,但不宜做空,并等待回调后的低吸机会。但我们亦预计贵金属整体回调空间可能有限,建议首先关注5日均线支撑。总体看,短线不宜追涨,但回调仍应视为中长期逢低步多机会。”
  • 福茂集团董事长赵安吉死因披露

      3月11日,北上资金大幅净买入102.60亿元,今年累计净买入额接近500亿元。从北上资金变化趋势来看,近期市场持续攀升,外资亦持续净买入,最近一个多月有5天单日净买入超百亿。